05000245/LER-1997-029, Forwards LER 97-029-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970513.Commitments Made within Ltr,Listed

From kanterella
Jump to navigation Jump to search
Forwards LER 97-029-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970513.Commitments Made within Ltr,Listed
ML20141C814
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/12/1997
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20141C817 List:
References
B16483, NUDOCS 9706260029
Download: ML20141C814 (1)


LER-2097-029, Forwards LER 97-029-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970513.Commitments Made within Ltr,Listed
Event date:
Report date:
2452097029R00 - NRC Website

text

%

o

"'N Nortkast i 7 seideo sm, aan, em037 Utilities System Northcut tude senice compaq P.O. Box 270 Ilartford, Cr 061410270 (860) 665 4 000 JUN I 21997 Docket No. 50-245 B16483 l

Re:10CFR50.73(a)(2)(i)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 This letter fonvards Licensee Event Report (LER) 97-029-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No.1 on May 13,1997. This LER is submitted pursuant to 10CFR50.73(a)(2)(i).

The following are Northeast Nuclear Energy Company's (NNECO's) commitments made within this letter. All other statements made within this letter are for information only.

B16483-1 NNECO will develop and provide reviewers with criteria for evaluating the adequacy of the surveillance procedures for the performance of TS required instrument functional testing prior to startup for operating Cycle 16.

B16483-2 NNECO will be perfonning a review of all instrumentation and control related surveillance procedures to verify compliance with Millstone Unit 1 TS surveillance requirements prior to startup for operating Cycle 16.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

/

m &Ae P. D. Hinnenkamp C i

Attachment:

LER 97-029-00 cc: Dr. W. D. Travers, Director, Special Projects ~

H. J. Miller, Region I Administrator '

S. Dembek, NRC Project Manager, Millstone Unit No.1 .

T. A. Eastick, Senior Resident Inspector, Millstone Unit No. I  !

9706260029 970612 PDR ADOCK 05000245 (bi3422 REY. 8-95 ll11111111ll15111111111111 a e a D A *