05000245/LER-1997-013, Forwards LER 97-013-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970217.Commitments Made within Ltr,Listed

From kanterella
Jump to navigation Jump to search
Forwards LER 97-013-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970217.Commitments Made within Ltr,Listed
ML20147F443
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/19/1997
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20147F446 List:
References
B16281, NUDOCS 9703250127
Download: ML20147F443 (1)


LER-2097-013, Forwards LER 97-013-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970217.Commitments Made within Ltr,Listed
Event date:
Report date:
2452097013R00 - NRC Website

text

. . . __

i Northeast M e ne fficese llope Ferry lld., Waterford, CT

. Utilities System e.o.iw 128

. Waterford, CT 06385-0128 (860) 447-1791 ,

March 19,1997  !

Docket No. 50-245 B16281 Re: 10CFR50.73(a)(2)(ii) l U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 This letter forwards Licensee Event Report (LER) 97-013-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No.1 on February 17, 1997. This LER is submitted pursuant to 10CFR50.73(a)(2)(ii).

The following are Northeast Nuclear Energy Company's (NNECO's) commitments made within this letter. All other statements made within this letter are for information only.

B16281-1 NNECO commits to perform a new impact load analysis for the fuel pool storage racks that includes the additional weight of the cable supported fuel grapple mast sections prior to core reload.

B16281-2 NNECO commits that for the reactor vessel core area, the latest GESTAR-II analysis will be reviewed to determine ifit is applicable to Millstone Unit No. I and changes processed for incorporation into the Millstone Unit No. I Updated Final Safety Analysis Report (UFSAR), if appropriate, prior to core reload. If the GESTAR II analysis is not applicable to Millstone Unit No.1, then a new analysis will be performed and changes processed for incorporation into the Millstone Unit i No. I UFSAR prior to core reload.  !

B16MI-3 NNECO commits to supplement this LER with the results of the impact load analysis. NNECO will supplement this LER by core reload.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY 0 D' c pr~3 s s K1 % .

4

  • P. D. Hinnenkamp V  !

Director, Unit Operations jV

Attachment:

LER 97-013-00 cc: Dr. W. D. Travers, Director, Special Projects

<h s

/  ;

H. J. Miller, Region I Administrator  !

S. Dembek, NRC Project Manager, Millstone Unit No.1 T. A. Eastick, Senior Resident Inspector, Millstone Unit No.1 )

9703250127 970319 I DR ADOCK 0500 5; lEE$$%%E%E,IE