05000245/LER-1996-062, Submits List of Commitments Made Re LER 96-062-00.Util Commits to Perform Engineering Calculations to Quantify Consequences of Failure of 1-AC-10 During Fuel Handling Accident

From kanterella
Jump to navigation Jump to search
Submits List of Commitments Made Re LER 96-062-00.Util Commits to Perform Engineering Calculations to Quantify Consequences of Failure of 1-AC-10 During Fuel Handling Accident
ML20133B953
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/02/1997
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20133B956 List:
References
B16079, NUDOCS 9701060306
Download: ML20133B953 (1)


LER-2096-062, Submits List of Commitments Made Re LER 96-062-00.Util Commits to Perform Engineering Calculations to Quantify Consequences of Failure of 1-AC-10 During Fuel Handling Accident
Event date:
Report date:
2452096062R00 - NRC Website

text

.m -__m . . _ _ _ . - _ - . _ . . _ .. _ _ _ . . . . _ . _ _ _ _ .. .

11

, Northeast miai, orrm .1+ rerry su, w.ierrora, er Utilities System i,.02.x 128 Waterford, Ur 06E.0128 (203) 447-1791

' January 2,1997 1 Docket No. 50-245 l E16079 t

l l Re: 10CFR50.73(a)(2)(ii) l U.S. Nuclear Regulatory Commission Document Control Desk l

Washington, DC 20555 This letter forwards Licensee Event Report (LER) 96-062-00, documenting an event that i occurred at Millstone Nuclear Power Station, Unit No.1 on December 3,1996. This LER is l submitted pursuant to 10CFR50.73(r.)(2)(ii).

The following are Northeast Nuclear Energy Company's (NNECO's) commitments made within this letter. All other statements made within this letter are for information only.

l B16079-1 NNECO commits to perform an engineering calculations to quantify the l consequences of a failure of 1-AC-10 during a fuel handling accident coincident with  :

l venting of primary containment. This will be completed prior to movement of fuel.

B16079-2 This event is being investigated via a root cause evaluation. The results of the investigation and the engineering calculation will be provided in a supplement to this report prior to movement of fuel. The supplemental report will provide a cause and i description of any required long term corrective actions.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY J

\

Al ML _) X l P. D.Tiinnenk'ainp Q Director, Unit Operations

Attachment:

LER 96-062-00 CG0049 y g3 '

l cc: Dr. W. D. Travers, Director, Special Projects l H. J. Miller, Region I Administrator l S. Dembek, NRC Project Manager, Millstone Unit No. I j T. A. Eastick, Senior Resident Inspector, Millstone Unit No. I 9701060306 970102 l PDR ADOCK 05000245

S PDR 1

l_ . _ _ __

,