Forwards LER 96-060-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 960408.Commitment Listed
ML20133B056
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/20/1996
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20133B059 List:
References
B16077, NUDOCS 9701020267
Download: ML20133B056 (4)


LER-2096-060, Forwards LER 96-060-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 960408.Commitment Listed
Event date:
Report date:
2452096060R00 - NRC Website

text

- - - . .- - . _ . . - -. _ -.- - - - . .

, ,. ' N:rtheast Mahume omm . none rerry na., waterrora cr Utilities System P.o+> 128 4 Waterford, CT 06385-0128 (203) 447-1791 DEC 2 0 w Docket No. 50-245 B1607'7 Re: 10CFR50.73(a)(2)(ii)(B)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

{

i This letter forwards Licensee Event Report (LER) 96 060-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No.1 on April 8,1996. This report is I submitted pursuant to 10CFR50.73(a)(2)(ii)(B).

The following is Northeast Nuclear Energy Cunrany's @NECO's) commitment contained within l this letter. All other statements contained within this 'ie.er are for information only.

B16077-1 NNECO commits that in order to ensure that the air compressors properly maiatain the pressure in the air receivers within the required range, the compressor start and stop pressure switches will be arranged such that they directly sense the pressure in the air receivers. This will be completed prior to declaring the diesel generator operable. '

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY P. D. Hinnenkamp >

Director, Unit Operations

Attachment:

LER 96-06400

\

cc: Dr. W. D. Travers, Director, Special Projects H. J. Miller, Region I Administrator iI S. Dembek, NRC Project Manager, Millstone Unit No.1 T. A. Eastick, Senior Resident Inspector, Millstone Unit No. I

_[/h 9701020267 961220 PDR ADOCK 05000245 S PDR msus-, arv. i.es