05000245/LER-1996-026, Forwards LER 96-026-01,documenting Event Which Occurred on 960321.Commitments Listed

From kanterella
Jump to navigation Jump to search
Forwards LER 96-026-01,documenting Event Which Occurred on 960321.Commitments Listed
ML20132D084
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/16/1996
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20132D086 List:
References
B16036, NUDOCS 9612190172
Download: ML20132D084 (2)


LER-2096-026, Forwards LER 96-026-01,documenting Event Which Occurred on 960321.Commitments Listed
Event date:
Report date:
2452096026R00 - NRC Website

text

.

. h Northeast whi=, otrm . noiaerry na, woierret er Utilities System ,,.o ,,,,128 Waterford, CT ON-0128 (203) 447-1791 i

l December 16,1996 Docket No. 50-245 l B16036  !

Re: 10CFR50.73(a)(2)(i)  ;

1 U.S. Nuclear Regulatory Commission {

Document Control Desk Washington, DC 20555 i "his letter forwards supplemental Licen.c" ' vent Report (LER) 96-026-01, documenting an event that occurred at Millstone Nuclear ser Station, Unit No.1 on March 21,1996. This LER is submitted pursuant to 10CFR50.73(a)(2)(i).

Uns LER supplement documents that as a result of the Millstone Unit No. I's on-going self-assessment, it has been revealed that the Integrated Leak Rate Tests (ILRTs) performed since 1976 have not included the leakage from the feedwater penetration leakage paths as required by 10CFR50 Appendix J. The failure to vent and drain the feedwater penetrations for the ILRT, and the inability to include valid Local Leak Rate Test (LLRT) penalty factors for these penetrations due to invalid LLRT results has caused the assessment of overall containmect integrity based on )

ILRT results from 1976 to 1980 to be invalid. Since there is no method available to assess ILRT results prior to 1980, all ILRTs performed prior to 1980 are considered invalid. The five ILRTs performed after 1980 are suspect pending an assessment of feedwater penetrations LLRTs.

This supplemental report includes administrative and editorial changes through out the entire LER. The Commitments have been moved from the LER form to this letter. The Commitment B15675-2 has also been modified to complete the Type C testing and provide supplemental report prior to startup for operating cycle 16. Lastly, there are three new commitments. I j l l

The following are Northeast Nuc! -ar Energy Company's (NNECO's) commitments made within this letter. All other statements made within this letter are for information only. 1 1P

/ l B15675-1 NNECO commits to implement modifications to penetrations X-8, X-9A, and X-9B to allow the system lines to be drained for an acceptable Appendix J Type C test.  !

These modifications will completed prior to startup for operating cycle 16. l B15675-2 NNECO commits to perform an Appendix J Type C test for penetrations X-8, X-9A, l and X-9B prior to startup for operating cycle 16. NNECO will supplement this LER j with the results of those Type C tests prior to startup for operating cycle 16.

9612190172 961216 PDR ADOCK G5000245 S PDR l

~ - . - -

l

U.S. Nuclear Regulatory Commission
B16036\Page 2 of 2 i
B15675-3 NNECO commits to review all Appendix J system configurations and procedures to j identify other piping configurations which preclude the ability to conduct an adequate I Appendix J Type C test. This review and any required modifications will be j completed prior to startup for operating cycle 16.

l B16036-1 NNECO commits to determine if the penetrations have resulted in two consecutive r

ILRT failures and, if required, develop and submit a Corrective Action Plan (CAP) in ,

accordance with IN 85-71 to propose an alternative leakage test program to monitor l 4 the Type C test performance for penetrations X-8, X-9A and X-9B in lieu of two

, consecutive ILRTs prior to startup for operating cycle 16. The CAP will address the l penetration discrepancies associated with penetrations X-9A and X-9B by i l implementing modifications to properly vent, drain, and perform Type C test on these l penetrations. '

(

B16036-2 NNECO commits to conduct a Type A test subsequent to the modifications to these l penetrations prior to startup for operating cycle 16.

l i

L 6036-3 NNECO commits to modify the Type A test procedure to specify those systems i which are not vented and drained during the Type A test. Systems that are not vented or drained during the Type A test which could become exposed to the  ;

i '

containment atmosphere during a design basis accident shall be Type C tested and the Type C "as-left" minimum pathway leakage rate shall be added to the Type A test (

leakage rate. A valid minimum pathway leakage rate from the Type C test shall be l applied to the Type A test per the requirements of 10 CFR 50 Appendix J. l 2

Very trulv yours,  !

4 NORTHEAST NUCLEAR ENERGY COMPANY i

OMM U

' i P. D/ Hinnenkamp  !

Director, Unit Operations l

. s

Attachment:

LER %-026-01 l

cc: Dr. W. D. Travers, Director, Special Projects l

[ H. J. Miller, Region I Administrator S. Dembek, NRC Project Manager, Millstone Unit No.1 T. A. Eastick, Senior Resident Inspector, Millstone Unit No. I  ;