05000213/LER-1996-016, Forwards LER 96-016-01 & LER 96-027-01,retracting Originally Proposed Corrective Actions That Will No Longer Be Implemented as Result of CYAPCO Decision to Cease Operations at Haddam Neck Plant

From kanterella
Jump to navigation Jump to search
Forwards LER 96-016-01 & LER 96-027-01,retracting Originally Proposed Corrective Actions That Will No Longer Be Implemented as Result of CYAPCO Decision to Cease Operations at Haddam Neck Plant
ML20217A749
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 09/15/1997
From: Bouchard G
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217A754 List:
References
CY-97-102, NUDOCS 9709220115
Download: ML20217A749 (1)


LER-2096-016, Forwards LER 96-016-01 & LER 96-027-01,retracting Originally Proposed Corrective Actions That Will No Longer Be Implemented as Result of CYAPCO Decision to Cease Operations at Haddam Neck Plant
Event date:
Report date:
2132096016R00 - NRC Website

text

_.

. l

\

ONNECTICUT YANKEE ATOMIC POWER COMPANY l HADDAM NECK PLANT l 362 INJUN HOLLOW ROAD e EAST HAMPToN. CT 06424-3099 l 1

September 15,1997 Docket No. 50-213 )

CY-97-102 Re: 10CFR50.73 U, S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Haddam Neck Plant Facility Operating License No. DPR-61 Reoortable Occurrence Licensee _ Event Reports The Connecticut Yankee Atomic Power Company (CYAPCO) hereby forwards the following Haddam Neck Plant (HNP) Supplemental Licensee Event Reports (LERs):

96-016-01 96-027-01 These LERs have been revised to retract the originally proposed corrective actions that will no longer be implemented as a result of the CYAPCO decision to cease operations at the Haddam Neck Plant. This fact was communicated to the NRC in a letter dated December 5,1996.W Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY

/

. Yh A .M souc6arY ,

Unit Director ,

I Enclosures cc: H. J. Miller, NRC Region i Administrator M. B. Fairtile, NRC Senior Project Manager, Haddam Neck Plant W. J. Raymond, NRC Senior Resident inspector, Haddam Neck Plant (1) T. C. Feigenbaum letter to the U. S. Nuclear Regulatory Commission,

" Certifications Of Permanent Cessation Of Power Operation And That Fuel Has Been Permanently Removed From The Reactor," dated December 5,1996.

9709220115 970915 PDR ADOCK 05000213 S PDR llk

, .