Forwards LER 89-020-01 Which Updates Info Re Fuel Failures Discovered During 1989 Refueling Outage & Identified as Potential Issue in Recent Nrc'S Historical Review Rept. Conclusion from Original LER Remains Unchanged
ML20248M119
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/04/1998
From: Bouchard G
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20248M120 List:
References
CY-98-072, CY-98-72, NUDOCS 9806150028
Download: ML20248M119 (2)


LER-2089-020, Forwards LER 89-020-01 Which Updates Info Re Fuel Failures Discovered During 1989 Refueling Outage & Identified as Potential Issue in Recent Nrc'S Historical Review Rept. Conclusion from Original LER Remains Unchanged
Event date:
Report date:
2132089020R00 - NRC Website

text

__ _ _ - - _ _ _ _ _ _ -

\ .

CONNECTICUT YANKEE ATOMIC POWER COMPANY IIADDAM NECK PLANT 362 INJUN llOLLOW ROAD e EAST liAMPTON, CT 06424-3099 June 4,1998 CY-98-072 Re: 10CFR50.73 (a)(2)(ii)

U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Reference:

Facility Operating License No. DPR-61 Docket No. 50-213 Supplemental LER 50-213/89-20-01 This le;tter forwards Licensee Event Report (LER) 89-20-01. This supplemental LER updates information vertaining to the fuel failures that were discovered during the 1989 refueling) outage and identified as a potential issue in the recent NRC's Historical Review Report . Whereas the original LER(2) presented a snapshot in time, this supplemental LER updates this information, presents the total number of discovered fuel failures based on completion of the fuel recovery program and provides additional detai' on the radiological assessment performed. This update also addresses the waste gas accident described in the Facility Description and Safety Analysis and its use of the 1% failed fuel assumption which is pertinent to the question raised by the NRC in their Historical Review Report.

Much of the new information provided has been extracted from reports prepared following completion of the refueling outage. These reports documented the Cycle 15- k i 16 fuel recovery efforts and provided details of the fuel inspections, the fuel damage k assessment, debris removal campaign and the fuel recovery and reconstitution. The conclusion from the original LER remains unchanged - that the fuel failures resulted in no safety significance and had no impact on the health and safety of the public.

  • Letter, USNRC to R. A. Mellor,"NRC llistorical Review Team Report - Radiological Control f )I and Area Contamination issues at l{addam Neck," dated March 26,1998.
  • Letter, CYAPCO to USNRC, Reportable Occurrence LER 50-213/89-20-00, dated December 15,1989.

9906150028 990604 PDR ADOCK 05000213 S PDR

2 .

U. S. Nuclear Regulatory Commission CY-98-072/Page 2 I

l We trust this information is satisfactory; however, if you need additional information, please contact us.

Ve truly yours,

\

. I. ouchard

. Unit Director GIIB/ reb

Attachment:

LER 50-213/89-20-01 cc: Mr. H. J. Miller Regional Administrator, Region 1 475 Allendale Road King of Prussia, PA 19406 Mr. William J. Raymond Sr. Resident Inspector.