Pages that link to "IR 07100026/2012006"
Jump to navigation
Jump to search
The following pages link to IR 07100026/2012006:
Displayed 6 items.
- IR 05000625/2009003 (← links)
- IR 05000483/1997020 (← links)
- ML20197H004 (← links)
- ML20203H159 (redirect page) (← links)
- ML20137H280 (← links)
- ML20137E815 (← links)
- PNO-III-86-001, on 860108,fire Destroyed Warehouse Bldg Outside Protected Area at Facility.Cause of Fire Undetermined.No Injuries Reported.No Radioactive Matl Involved.State of Mo & Region III Notified (← links)
- ML20136H061 (← links)
- ML20135D940 (← links)
- ML20135D931 (← links)
- ML20135D728 (← links)
- PNO-III-86-022, on 860312,unidentified Male Made Announcement Over PA Sys to Evacuate Containment.On 860313,sabotage Threat Received Via Telcon.Security Contingency Plan Measures for Communicated Threat Implemented (← links)
- ML20141E479 (← links)
- ML20141E453 (← links)
- ML20134M824 (← links)
- ML20133P925 (← links)
- ML20133M832 (← links)
- ML20133L664 (← links)
- ML20133K962 (← links)
- ML20132A984 (← links)
- ML20132A964 (← links)
- ML20129J377 (← links)
- ML20129J372 (← links)
- ML20128P789 (← links)
- ML20128D665 (← links)
- ML20128A518 (← links)
- ML20127N022 (← links)
- ML20127A679 (← links)
- ML20127A670 (← links)
- ML20125D895 (← links)
- ML20125D878 (← links)
- ML20151Y022 (← links)
- ML20150C818 (← links)
- ML20149M835 (← links)
- ML20149J383 (← links)
- PNO-III-88-011, on 880213,reactor Tripped from 100% Power Due to Main Turbine Trip.Safety Injection Sys Actuated Due to Low Steamline Pressure Signal.Relief Valve on Seal Leakoff Replaced W/Spare & Other Two Relief Valves Repaired (← links)
- ML20149D504 (← links)
- ML20196G347 (← links)
- PNO-IV-98-059, on 981129,licensee Commenced Plant Shutdown from 100% Power to Mode 3 to Replace Fan Motor.Resident Inspector Monitored Portion of Plant Shutdown from Cr.Info Has Been Discussed with Licensee (← links)
- ML20155D410 (← links)
- ML20199F233 (← links)
- ML20199F216 (← links)
- PNO-IV-97-069, on 971120,plant Received Security Threat. Licensee Implemented Interim Contigency Measures & Notified CPS as That Plant Was Also Mentioned in Threat.State of Mo Notified (← links)
- ML20199D926 (← links)
- ML20199A524 (← links)
- PNO-III-86-047, on 860518,unit Shut Down to Repair Leaking Steam Generator C Feedwater Check Valve.Return to Svc Expected on 860522.State of Mo Informed (← links)
- ML20198A123 (← links)
- PNO-III-84-049, on 840611,OL Issued to Util for Callaway Nuclear Power Station.License Limited to Fuel Loading & Operation Up to 5% Power (← links)
- ML20204G081 (← links)
- ML20204E405 (← links)
- PNO-III-86-038, on 860423,nonvital Dc Circuit Breaker Found Tripped in Turbine Bldg.Caused by Equipment Operator Inadvertently Tripping Circuit Breaker.Security Surveillance Increased (← links)
- ML20203H143 (← links)
- PNO-III-86-036, on 860314,sabotage Threats Prompted Upgrade of Security Measures.Security Actions Reviewed by Region Iii.Plant Resumed Operations on 860415 After First Refueling Outage Which Began on 860228 (← links)
- ML20207G647 (← links)
- ML20207F608 (← links)
- ML20206T571 (← links)
- ML20206J495 (← links)
- ML20209D699 (← links)
- ML20207T877 (← links)
- ML20214R012 (← links)
- ML20213A670 (← links)
- ML20212B711 (← links)
- ML20238F439 (← links)
- ML20237B893 (← links)
- ML20249A750 (← links)
- ML20248L262 (← links)
- ML20248L253 (← links)
- ML20247M224 (← links)
- ML20236V325 (← links)
- ML20236V131 (← links)
- ML20236T419 (← links)
- ML20236S922 (← links)
- ML20236N637 (← links)
- ML20236N622 (← links)
- ML20236M242 (← links)
- ML20236G463 (← links)
- ML20236E908 (← links)
- ML20236B624 (← links)
- ML20235W712 (← links)
- ML20235U154 (← links)
- ML20235J798 (← links)
- ML20235H595 (← links)
- ML20235C035 (← links)
- ML20217F488 (← links)
- ML20217F449 (← links)
- ML20217F192 (← links)
- ML20216A797 (← links)
- ML20215H210 (← links)
- PNO-III-86-060, on 860621,reactor Tripped on lo-lo Water Level Signal from Steam Generator D.Caused by Closing of Feedwater Isolation Valve Due to Failure of Control Logic Card (← links)
- PNO-IV-99-035A, on 990810,heater Drain Line Pipe Rupture Occurred.Caused by Flow Accelerated Corrosion in Conjunction with Moisture Impingement.Licensee Has Completed Replacement of Damage Heater Drain Piping & Conducted Insps of Piping (← links)
- PNO-IV-99-035, on 990810,operators Initiated Manual Rt When High Pressure Heater Drain Line Ruptured in Turbine Bldg. Licensee Is Evaluating Options for Facilitating Repair & Restarting Plant.Region IV Will Conduct Special Insp (← links)
- ML20210G966 (← links)
- ML20209J056 (← links)
- ML20209F198 (← links)
- ML20209E958 (← links)
- PNO-III-86-022A, on 860314,unidentified Male Telephoned & Stated Some Tags from Mechanical Equipment Removed.Util Added Security Personnel & Checked Plant.No Abnormal Conditions Observed.Investigation Continuing (← links)
- PNO-III-85-065A, on 850729,containment Spray Pump 1B Failed to Start Due to Incorrect Overcurrent Setpoint.Caused by Personnel Error.Licensee Investigation Complete.Erroneous Setpoint Could Have Existed Since 1984 W/No Pump Failures (← links)
- PNO-III-85-065, on 850729,licensee Reported Possible Tampering Incident Involving Overcurrent Relay for Containment Spray Pump 1B.Relay Reset.Security Intensified. Investigation Underway (← links)
- ML20059E256 (← links)
- IR 07100026/2011005 (← links)
- IR 07100026/2011029 (← links)