Pages that link to "CNS-16-080, Submittal of Emergency Plan Implementing Procedure"
Jump to navigation
Jump to search
The following pages link to CNS-16-080, Submittal of Emergency Plan Implementing Procedure:
Displayed 50 items.
- ML16362A216 (redirect page) (← links)
- ML12311A028 (← links)
- CNS-18-017, Catawba, Units 1 and 2, Submittal of Emergency Plan, Revision 18-1 and 18-2 (← links)
- CNS-17-056, Catawba Nuclear Station Units 1 and 2, Submittal of Emergency Plan, Revision 17-2 (← links)
- CNS-17-056, Catawba Nuclear Station Units 1 and 2, Resubmittal of Emergency Plan, Revision 17-2 (← links)
- CNS-17-030, Catawba, Unit 1, Submittal of Core Operating Limits Report (Colr) for Cycle 24 Reload Core (← links)
- CNS-17-015, Catawba Nuclear Station, Units 1 and 2 - Submittal of 2016 Annual Radioactive Effluent Release Report (← links)
- CNS-17-028, 10 CFR 50.54 Evaluation for Catawba, Units 1 and 2 Emergency Plan Implementing Procedure, Technical Support Center (TSC) Activation Procedure, Revision 043 (← links)
- CNS-16-080, Catawba, Units 1 and 2 - Submittal of Emergency Plan Implementing Procedure (redirect page) (← links)
- CNS-16-080 (redirect page) (← links)
- CNS-16-004, Catawba, Units 1 and 2 - Emergency Plan, Revision 146 Correction (← links)
- RA-15-0019, Duke Energy Carolina LLC Submits Epips, Rev 5 to SR/0/A/2000/003, Activation of the Emergency Operations Facility and Rev 4 to SR/0/A/2000/004, Notification to States and Counties from the Emergency Operations Facility for Catawba, McGuir (← links)
- ML040860113 (← links)
- ML032890052 (← links)
- ML030710367 (← links)
- CNS-16-051, License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, Response to NRC Request for Additional Information (RAI) an (← links)
- CNS-16-043, Additional Information Regarding Flood Hazard Reevaluation Report, Response to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Forc (← links)
- CNS-16-022, Supplemental Information to the Final Notification of Full Compliance with Order EA-12-049,Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and with Order EA-12-051, Et (← links)
- CNS-14-127, Proposed Technical Specifications (TS) Amendment TS 3.1.3, Moderator Temperature Coefficient (Mtc) TS 5.6.5, Core Operating Limits Report (Colr), License Amendment Request for Conditional Exemption of the End of Cycle (EOC) Mtc Measuremen (← links)
- CNS-14-081, License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology (Proprietary) Response to NRC Request for Additional Information (RAI) (← links)
- CNS-14-020, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- CNS-14-025, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- CNS-18-031, Notice of Enforcement Discretion (NOED) Request (← links)
- CNS-18-006, Submittal of Special Report 2018-01 for the Loose Parts Monitoring System Non-Functional for Greater than 30 Days (← links)
- CNS-17-040, Withdrawal of Inservice Testing Relief Request 17-CN-002 Regarding an Alternative Method to Establish New Reference Values for Testing Chemical and Volume Control Pump (← links)
- CNS-17-039, Relief Request 17-CN-002, Request for Alternative Method to Establish New Inservice Testing Values for a Chemical and Volume Control Pump (← links)
- CNS-17-036, Mid-Cycle Power Uprate Ascension Startup Report (← links)
- CNS-17-031, Response to NRC Requests for Additional Information End of Cycle 21 Refueling Outage Inservice Inspection Report and Steam Generator Inservice Inspection Summary Report (← links)
- CNS-17-002, End of Cycle 21 Refueling Outage, Lnservice Inspection Report and Steam Generator Lnservice Inspection Summary Report (← links)
- CNS-16-020, Inservice Inspection Report for End of Cycle 22 Refueling Outage (← links)
- CNS-15-079, Relief Request Serial Number 15-CN-001, Proposed Alternative Repair for Main Steam System Braided Flex-Hose -Submitted Pursuant to 10 Cer 50.55a(z)(2) (← links)
- CNS-15-062, Relief Request Serial Number 15-CN-001, Proposed Alternative Repair for Main Steam System Braided Flex-Hose - Submitted Pursuant to 10 CFR 50.55a(z)(2) (← links)
- CNS-15-061, Inservice Inspection Report and Steam Generator Inservice Inspection Summary Report for End of Cycle 20 Refueling Outage (← links)
- CNS-15-047, Steam Generator Inservice Inspection Summary Report for End of Cycle 21 Refueling Outage, Response to NRC Requests for Additional Information (Rais) (← links)
- CNS-15-035, Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and with Order EA-12-051, Order to Modify with Regard. (← links)
- CNS-14-133, Relief Request Serial Number 14-CN-003, Relief Request to Use Alternative Depth Sizing Criteria (← links)
- CNS-14-105, Inservice Inspection Report and Steam Generator Inservice Inspection Summary Report for End of Cycle 21 Refueling Outage (← links)
- CNS-14-035, Submittal of Post Accident Monitoring (PAM) Report (← links)
- CNS-14-032, Request for Notice of Enforcement Discretion (NOED) Regarding Technical Specifications (← links)
- CNS-14-001, Inservice Inspection Report and Steam Generator Inservice Inspection Summary Report for End of Cycle 19 Refueling Outage (← links)
- CNS-18-008, License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing (← links)
- CNS-18-028, 2017 Annual Radiological Environmental Operating Report (← links)
- CNS-18-026, Transmittal of 2017/2018 10 CFR 50.59 Evaluation Summary Report (← links)
- CNS-18-025, Submittal of 2017 Annual Radioactive Effluent Release Report (← links)
- CNS-18-022, Submittal of Emergency Plan Implementing Procedure (← links)
- CNS-18-017, Emergency Plan, Revision 18-1 and 18-2 (← links)
- CNS-18-015, Commitment Change Evaluation Report for 2017 (← links)
- CNS-17-061, Third Ten-Year Inservice Inspection Plan, Limited Volumetric Examinations Response to NRC Requests for Additional Information (← links)
- CNS-17-053, Transmittal of 2016 Annual Radioactive Effluent Release Report - Supplement (← links)
- CNS-17-049, Submittal of Ufsar/Selected Licensee Commitment Changes Manual (← links)