Pages that link to "Buschbaum D"
Jump to navigation
Jump to search
The following pages link to Buschbaum D:
Displayed 50 items.
- TSTF-08-12, Submittal of Technical Specification Branch Positions Inconsistent with the Improved Standard Technical Specifications (← links)
- ML062560258 (← links)
- TSTF-04-10, TSTF-476, Revision 0, Improved BPWS Control Rod Insertion Process (NEDO-33091) (← links)
- TSTF-04-09, TSTF-426, Revision 0, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c (← links)
- TSTF-04-11, TSTF-477, Revision 0, Add Action for Two Inoperable Control Room AC Subsystems (← links)
- ML20012B972 (← links)
- ML20043E205 (← links)
- ML20042G712 (← links)
- ML20055G199 (← links)
- ML042670312 (← links)
- ML041770176 (← links)
- ML040770152 (← links)
- ML040770147 (← links)
- ML040770122 (← links)
- ML033440352 (← links)
- ML20065R395 (← links)
- ML20059J109 (← links)
- ML20059A877 (← links)
- ML20070R764 (← links)
- ML20066G634 (← links)
- ML20077C597 (← links)
- ML20204F331 (← links)
- ML20204F147 (← links)
- CPSES-199901700, Forwards Rev 15 to CPSES Fire Protection Rept & Description of Changes (← links)
- TXX-9010, Monthly Operating Rept for Oct 1990 for Comanche Peak Steam Electric Station Unit 1 (← links)
- TXX-9101, Monthly Operating Rept for Dec 1990 for Comanche Peak Steam Electric Station Unit 1 (← links)
- ML20058A251 (← links)
- 05000445/LER-1990-035, :on 901011,potential common-mode Failure of HPSI Pumps Discovered Due to Incorrect Suction Vent Valve Application (← links)
- 05000445/LER-1992-024, :on 921022,determined That Surveillance for Containment post-accident Water Level Instrumentation Did Not Include Check of Level Sensors.Caused by Personnel Error.Vendor Manual Will Be Amended (← links)
- 05000445/LER-1992-023, :on 921021,security Officer Appeared to Be Unconscious & Exhibited Abrasions Indicative of an Assault. Caused by Personal Relationships Among Security Personnel. Investigation Still in Progress (← links)
- 05000445/LER-1996-005, :on 960310,entry Into TS 3.0.3 Occurred Due to Cracked Weld in SI Sys Piping.Removed & Replaced Cracked Weldment W/New Weld (← links)
- 05000445/LER-1992-025, :on 921023,equipment Failure Resulted in Drop of Four Control Bank B Group 1 Control Rods & Manual Reactor Trip.Caused by Inadequate Interior Cooling of Affected Rod Control Cabinet (← links)
- 05000445/LER-1992-002-01, :on 921012,manual Reactor Trip Due to Feedwater Flow Control Valve Failure.Pressure Regulators in Other Three Unit 1 FCVs & Four Unit 2 FCVs Were Verified to Be 0-125 Psig Regulators,As Required (← links)
- 05000445/LER-1992-021, :on 920516,electric Low Vacuum Trip Device Did Not Respond During Turbine Overspeed Surveillance Test & Several Faults Annunicated at Automatic Turbine Tester. Caused by Loose Wire.Wire Tightened (← links)
- 05000445/LER-1992-019, :on 920720,loss of Main Feedwater Resulted in Manual Reactor Trip Due to Rapidly Lowering SG Levels.Cause Unknown.Temporary Mod Installed to Bypass anti-water Hammer Interlock Circuits in Ssps (← links)
- 05000445/LER-1992-018, :on 920713,Westinghouse Informed Util of Significant Change in Evaluation Model,Resulting in Calculated Performance Outide Peak Temp Cladding Criteria. Licensing Document Change Initiated (← links)
- 05000445/LER-1992-017, :on 920626,main Steam Supply Valves to AFW Turbine Not Quarterly Close stroke-time Tested.Caused by Procedure Error.Review of Inservice Test Valve Data Will Be Conducted (← links)
- 05000445/LER-1992-016, :on 920623,phase B Line Between Unit 1 Station Transformer (1ST) & 1ST MOD Switch Broke Causing ESF Actuation.Caused by Design Deficiency in Lines Between 1ST & 1ST MOD switch.1ST Phase B Connector Repaired (← links)
- 05000445/LER-1992-015, :on 920610,time Delay Relay Associated W/ Blackout Sequencing Circuit Inoperable.Caused by Faulty Design to Allow Plant to Transfer Offsite Electrical Power to Alternate Source.Mod Process Revised (← links)
- 05000445/LER-1992-014, :on 920611,loss of Main Feedwater Resulted in Manual Reactor Trip Due to Rapidly Lowering Steam Generator Levels.Replaced Circuit Cards Were Sent to Ssps Vendor for Further Testing (← links)
- 05000445/LER-1992-011, :on 920618,failure of thermo-lag Fire Barrier Endurance Tests Results in Some Raceways Declared Inoperable.Caused by Inadequate Vendor Installation Specs. Fire Watch Routes Adjusted (← links)
- 05000445/LER-1992-013, :on 920511,loss of Cooling Water Flow to Fuel Pool Heat Exchanger Occurred After Realignment.Caused by Personnel Error.Personnel Retrained & Reevaluated & Heat Exchanger X-02 Has Restricted Use (← links)
- 05000445/LER-1992-012, :on 920603,reactor Shutdown Initiated Per Procedure.Caused by Less than Adequate Procedure Control of Oil Return Valve.Repositioned Valve,Procedure Change Stating Required Position of Valve & Controls Applied (← links)
- 05000445/LER-1992-005, :on 920218,operator Misinterpreted Procedure Step & Inadvertently Unblocked Actuation Signal Causing ESF Actuation.Caused by Personnel Error.Event Reviewed.Personnel Trained (← links)
- 05000445/LER-1992-020, :on 920720,output of motor-driven Auxiliary Feedwater Pump 1-02 Was Higher than Combined Flow to SG 03 & 04.Caused by Design Not Permitting Operator to Verify That Valve Closed.Procedures to Be Revised (← links)
- 05000445/LER-1992-010, :on 920509,analog Channel Operational Test Not Performed Prior to Startup to Verify power-range Neutron Flux Low Setpoint.Caused by Personnel Error.Task Team Formed to Review Surveillance Test Process (← links)
- 05000445/LER-1992-009, :on 920508,reactor Tripped.Caused by Personnel Error During Testing.Appropriate Level of Positive Discipline Program Implemented for Individuals Involved & Cabinet Locking Scheme Modified (← links)
- 05000445/LER-1992-008, :on 920406,control Room Heating Ventilation & Air Conditioning (HVAC) Sys Realigned to Emergency Recirculation Mode.Caused by Personnel Error.Electrical Control Building AO Has Been Counselled (← links)
- 05000445/LER-1992-007, :on 920401,train B Diesel Generator Declared Inoperable to Perform Scheduled Preventive Maint.Caused by Personnel Error.Individual Counseled,Procedure Enhanced & Standardized Tracking Device Developed (← links)
- 05000445/LER-1991-010, :on 910322,discovered That Train B motor-driven Auxiliary Feedwater Pump Recirculation Test Line Isolation Valve Was One Quarter Turn Open.Possibly Caused by Personnel Error.Addl Guidance Was Provided to Operators (← links)