Pages that link to "2CV-5648-2"
Jump to navigation
Jump to search
The following pages link to 2CV-5648-2:
Displayed 43 items.
- IR 05000313/2005002 (← links)
- ML15265A313 (← links)
- ML15264A681 (← links)
- ML14237A215 (← links)
- ML12278A253 (← links)
- ML021560244 (← links)
- ML020940838 (← links)
- ML020940833 (← links)
- ML020940829 (← links)
- 2CAN031006, Inservice Testing Plan for the Fourth 10-Year Interval (← links)
- CNRO-2007-00015, Request for Alternative ANO2-R&R-004, Revision 1, Response to NRC Request for Additional Information (← links)
- CNRO-2007-00044, Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing Plan (← links)
- ML17080A196 (← links)
- ML17080A187 (← links)
- 2CAN060504, Unit 2, Submittal of Report to Provide Information Re Replacement Valve Disc Manufactured by Crane-Aloyco (← links)
- ML19345F153 (← links)
- ML19344F438 (← links)
- ML19331C618 (← links)
- ML20052B748 (← links)
- ML20050C145 (← links)
- ML20056E282 (← links)
- ML20063B445 (← links)
- ML20084E465 (← links)
- ML20082H175 (← links)
- ML20112B780 (← links)
- IR 05000313/2020002 (← links)
- ML20205G727 (← links)
- 2CAN112005, Unit 2 - Inservice Testing Plan for the Fifth 10-Year Interval (← links)
- ML20217E950 (← links)
- 0CAN089903, Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves (← links)
- 0CAN049910, Forwards Response to NRC 990401 Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Gate Valves (← links)
- 0CAN058603, Forwards Response to Items A-E of IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings (← links)
- 2CAN109801, Forwards Addl Info in Support of risk-informed Inservice Insp Pilot Application Submitted in Licensee 970930 & s.Pilot Plant Application Is to Be Used as Alternative, Per 10CFR50.55(a)(3)(i),to Certain ASME Requirements (← links)
- 0CAN028806, Forwards Written Rept Describing Approach to Each Action Items from IE Bulletin 85-003 & Summary of Data for Each motor-operated Valve Compiled in Response to Bulletin.Rept Completes Response to IE Bulletin 85-003 (← links)
- 2CAN099202, Forwards Response to NRC 920618 Request for Addl Info Re Compliance W/Electrical Circuitry Isolation Requirements,As Followup to Edsfi,Per 920825 Telcon W/Nrc.Plans & Schedules for Resolution of Circuitry Isolation Issues Encl (← links)
- 0CAN029605, Forwards Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves (← links)
- 2CAN088402, Documents Resolution of Environ Qualification Deficiencies Identified in SER & Discussed at 840426 Meeting.Matrix of Qualification Deficiencies & Proposed Resolution & Justification for Continued Operation Encl (← links)
- 0CAN948407, Forwards Proposed Resolution of Deficiencies Re Environ Qualification of safety-related Equipment,To Be Discussed at 840426 Meeting W/Nrc in Bethesda,Md (← links)
- 0CAN089111, Suppls 910415 Response to NRC SERs for Station Blackout. Alternate Ac Power Source Will Be Available within 10 Minutes of Onset of Station Blackout Event (← links)
- 2CAN088307, Forwards Analysis of Spurious Actuation of ESF Sys. Consequences of Spurious Actuations of ESF Actuation Sys Combinations Would Be No More Severe than Scenarios Previously Analyzed (← links)
- 2CAN019402, Forwards One Yr Response to NRC Safety Evaluation for Second Ten Yr IST Program & Description of Program Development Process (← links)
- 2CAN068203, Forwards Corrections to 820416 Response to IE Bulletin 80-06 Re Two Components Inadvertently Listed Incorrectly. Components Are Radiation Elements 2RE-8231-1 & 2RE-8271-2 (← links)
- ML21134A241 (← links)