Pages that link to "ML20236F407"
Jump to navigation
Jump to search
The following pages link to ML20236F407:
Displayed 23 items.
- PNO-II-86-004, on 851203,util Discovered That Individual Cleaning Sludge Out of Steam Generator Received Higher than Expected Exposure in Late Nov/Early Dec.Caused by Lack of whole-body TLD Other than TLD on Upper Arm (← links)
- PNO-II-85-088, on 850910,reactor Manually Tripped from 100% Power.Caused by Excessive Vibration in Reactor Coolant Pump & Loose Parts Monitor Alarm in Same Cooling Loop.Unit in Cold Shutdown for Investigation of Problem & Repairs (← links)
- PNO-II-85-085, on 850824,leaking Oil from Reactor Coolant Pump Lower Motor Reservoir Contacted Pump Casing & Caught Fire.Caused by Failure of Lower Bearing & Oil Seal.Pump & Motor Vendors Contacted for Technical Assistance (← links)
- PNO-II-85-076, on 850808,reactor Tripped from 99% Power. Caused by Two Blown Fuses.Unit Proceeding to Cold Shutdown & Will Be Out of Svc for 10 Days While Cause Investigated & Reactor Coolant Pumps Inspected (← links)
- ML20151U665 (← links)
- ML20151U484 (← links)
- ML20151U452 (← links)
- PNO-II-99-023, on 990601,one CEA Descended Into Reactor Core for Unknown Reasons,With Unit 2 Rated Power.Licensee Noted Voltage Fluctuations on CEA Power Supplies.Licensee Is Continuing to Investigate CEA Problems (← links)
- PNO-II-83-058, on 830809,St Lucie Unit 2 Completed 100-hour Test Run at Full Power.Test Was Culmination of Power Ascension Testing Which Began After Full Power License Was Issued on 830610.Placed Into Commercial Operation on 830808 (← links)
- PNO-II-85-105, on 851106,while Removing Core Internals Upper Guide Structure,One Lifting Rig Attachment Failed.Refueling Operations Halted W/Structure in Apparently Stable Position. NSSS Vendor Being Contacted (← links)
- PNO-II-87-019, Region II Will Dispatch Augmented Insp Team on 870319 to Review Circumstances Associated W/Problem Re Possible Corrosion Caused by Deposits of Crystalline Boric Acid on Reactor Head & Surrounding Areas (← links)
- PNO-II-80-031, on 800219,18 Gallons of Extraneous Liquid & Resin Found in Radwaste Shipment.Source of Liquid & Resin at Bottom of Shipping Cask Not Confirmed.Shipment Loaded in Rain & Overfilled (← links)
- PNO-II-93-001, on 930112,plant Commenced Shutdown Due to RCP Vibration.Unit 2 Being Placed in Cold Shutdown,Mode 5.State of Fl Notified (← links)
- ML20207G431 (← links)
- ML20249B526 (← links)
- ML20249B317 (← links)
- ML20249A654 (← links)
- PNO-II-87-066, on 871008,licensee Calculated Leakage Above Required Tech Spec Limits.Cause Could Not Be Identified. Reactor Shut Down Based on Leakage & Results of Containment Insp (← links)
- ML20216K132 (← links)
- PNO-II-86-066, on 860920,leaking Relief Valve on Storage Tube on Hydrogen Trailer Discovered.Other Tubes Isolated from Leak,Area Roped Off & Smoking Prohibited.Event Terminated on 860921 (← links)
- PNO-II-86-040, on 860606,util Took Facility Out of Svc to Begin Plugging 17 Degraded Steam Generator Tubes.Unit Will Be Shut Down Approx 2 Wks.Tube Degradation Discovered on 860523 in Eddy Current Data Taken During Oct-Dec 1985 (← links)
- PNO-II-86-032, on 860428,iron Workers Employed by Util Contractor Walked Off Job & Set Up Picket Lines at All Four Entrances to Facility.Union Workers Refusing to Cross Picket Lines.Security Forces & Senior Reactor Operators on Job (← links)
- PNO-II-85-105A, on 851109,minor Damage to Regular Lifting Rig Identified Following Lifting of Core Internals Upper Guide Structure Free of Reactor Vessel.Unusual Event Declared on 851106 Terminated (← links)