Pages that link to "05000366/LER-1979-005, Forwards LER 79-005/03L-0"
Jump to navigation
Jump to search
The following pages link to 05000366/LER-1979-005, Forwards LER 79-005/03L-0:
Displayed 50 items.
- 05000366/LER-1979-088, Forwards Updated LER 79-088/03X-1 (← links)
- ML20083K751 (redirect page) (← links)
- 05000366/LER-1979-005 (redirect page) (← links)
- 05000366/LER-1979-008, Forwards LER 79-008/03L-0 (← links)
- 05000321/LER-1979-001, Forwards LER 79-001/03L-0 (← links)
- 05000321/LER-1979-021, Forwards Supplemental Narrative Summary to LER-79-021/03L-0, Rev 5 Re Tritium Levels in Groundwater for Second Quarter 1983 Exceeding ETS Levels (← links)
- 05000321/LER-1979-010, Forwards LER 79-010/03L-0 (← links)
- 05000366/LER-1979-048, Forwards Updated LER 79-048/03X-1 (← links)
- 05000321/LER-1979-076, Forwards Updated LER 79-076/01X-1 (← links)
- 05000321/LER-1979-103, Forwards Updated LER 79-103/03X-2 (← links)
- 05000366/LER-1979-124, Forwards Updated LER 79-124/03X-1 (← links)
- 05000366/LER-1979-106, Forwards LER 79-106/03L-0 (← links)
- 05000321/LER-1979-102, Forwards LER 79-102/03L-0 (← links)
- 05000366/LER-1979-084, Forwards LER 79-084/03L-0 (← links)
- 05000366/LER-1979-089, Forwards LER 79-089/03L-0 (← links)
- 05000366/LER-1979-078, Forwards LER 79-078/03L-1 (← links)
- 05000366/LER-1979-047, Forwards Updated LER 79-047/03X-1 (← links)
- 05000321/LER-1979-105, Forwards LER 79-105/01T-0 (← links)
- 05000366/LER-1979-137, Forwards LER 79-137/03L-0 (← links)
- 05000366/LER-1979-131, Forwards LER 79-131/03L-0 (← links)
- 05000366/LER-1979-138, Forwards LER 79-138/01T-0 (← links)
- 05000366/LER-1979-134, Forwards LER 79-134/03L-0 (← links)
- 05000366/LER-1979-133, Forwards LER 79-133/03L-0 (← links)
- 05000366/LER-1979-090, Forwards LER 79-090/03L-0 (← links)
- 05000321/LER-1979-054, Forwards LER 79-054/06T-0 (← links)
- 05000321/LER-1979-056, Forwards LER 79-056/01T-0 (← links)
- 05000321/LER-1979-051, Forwards LER 79-051/03L-0 (← links)
- 05000321/LER-1979-073, Forwards LER 79-073/031-0 (← links)
- 05000366/LER-1979-015, Forwards Updated LER 79-015/03X-1 (← links)
- 05000366/LER-1979-098, Forwards Updated LER 79-098/01X-1 (← links)
- 05000366/LER-1979-135, Forwards Updated LER 79-135/03X-1 (← links)
- 05000366/LER-1979-085, Forwards Updated LER 79-085/03L-1 (← links)
- 05000321/LER-1979-073-03, /03L-0:on 790827,water Supply for Control Room Charcoal Filter Fire Protection Deluge Sys Did Not Meet Seismic & Redundancy Requirements.Caused by Low Plant Svc Water Pressure Leading to Trips & Leakage (← links)
- 05000321/LER-1979-102-03, /03L-0:on 791226,during Shutdown & While Performing Normal Surveillance,Hpci Steam Line Differential Pressure Switch Found at 241 Inches of Water.Caused by Instrument Drift.Instrument Recalibr (← links)
- 05000366/LER-1979-106-03, /03L-0:on 790919,several Operational Cycle & Other Surveillances Were Overdue.Caused by Misinterpretation of Tech Specs Re Starting Time for Surveillances.Exemption Requested & Granted (← links)
- 05000366/LER-1979-084-03, /03L-0 on 790729:during Maint,Hpci Pump Suction Low Pressure Switch 2E41-N010 Found Inoperative.Caused by Ruptured Instrument Diaphragm.Instrument Replaced & Switch Tested Satisfactorily (← links)
- 05000366/LER-1979-089-03, /03L-0 on 790718:battery Pilot Cell Surveillance Not Performed on 790712 Per Tech Specs.Caused by Personnel Oversight.Satisfactory Cell Surveillance Performed on 790718 & Personnel Informed of Surveillance Schedule (← links)
- 05000366/LER-1979-079-03, /03L-0 on 790718:reactor Feedwater Flow Transmitters Were Incorrectly Calibrated,Resulting in Errors in Reactor Power Calculations.Caused by Use of Unrevised Procedures.Procedures & Data Sheets Reviewed & Corrected (← links)
- 05000366/LER-1979-091-03, /03L-0 on 790727:on 17 Occasions from 790103-0723,procedures Were Released W/O Obtaining Plant Manager Approval within 14 Days.Caused by Inadequate Tracking Method.Methods Will Be Revised (← links)
- 05000366/LER-1979-078-03, /03L-1 on 790622:hydrogen Gas Concentration Downstream of Recombiners Exceeded Tech Specs.Caused by Improper Operation of Preheater Which Resulted in Insufficient Gas & Droplet Temp.Investigation Underway (← links)
- 05000366/LER-1979-047-03, During Surveillance, Discovered Strainers Isolated on Standby Psw Pump.Diesel Generator B Rendered Inoperable.Caused by Improperly Installed Valve.Valve to Be Reinstalled (← links)
- 05000366/LER-1979-137-03, /03L-0:on 791224,during HNP-2-1050 Surveillance Checks,Drywell & Torus Temp Recorder Found Printing Erratic Temps.Caused by Cold Solder Joint on Transistor Lead Making Pen Respond Erratically.Transister Pins Resoldered to Ca (← links)
- 05000366/LER-1979-131-03, /03L-0:on 791206,during Normal Operation,Torus Narrow Range Level Recorder Failed Upscale,Indicating High Water Level.Caused by Leaking Vent Plug on Manifold Block Valve.Leak Corrected.Plugs Will Be Checked Regularly (← links)
- 05000366/LER-1979-138-01, /01T-0:on 791228,during HPCI Delta Pressure Functional Test,Instruments 2E41-NOO4 & 2E41-NOO5 Found Out of Tech Spec Limits.Caused by Instrument Drift.Instruments Recalibr & Successfully Tested (← links)
- 05000366/LER-1979-134-03, /03L-0:on 791214,during Fission Product Instrument Functional test,2D11-K633 Failed to Give Inoperative Response W/Mode Switch Taken Out of Operation.Caused by Bad Wiring Connection.Instrument Replaced & Tested (← links)
- 05000366/LER-1979-133-03, /03L-0:on 791211,during Normal Operation,Hpci Sys Isolated.Caused by Cold Weather & Sys Design Due to Vent Air Inlet/Outlet Temp Difference.Plant Operator Turned on HPCI Room Equipment Coolers & Sys Returned to Normal (← links)
- 05000366/LER-1979-090-03, /03L-0 on 790802:while Performing Calibr Procedure 2E41-NO12C,setpoint Exceeded Tech Specs.Caused by Instrument Drift.Instrument Recalibr & Surveillance Procedure Performed Successfully (← links)
- 05000321/LER-1979-054-06, /06T-0 on 790802:during Monthly Inventory of Onsite Snm,Discovered Three Detectors Had Been Mistakenly Shipped Off Site for Disposal W/O Authorization.Caused by Improper Tagging.Procedure Changes Submitted (← links)
- 05000321/LER-1979-056-01, /01T-0 on 790803:during Performance of Hanger Rework Project,Discovered Section of Piping Crossfied Not Supported Per Seismic Class I Requirements.Caused by Design Error.Piping Upgraded (← links)
- 05000321/LER-1979-051-03, /03L-0 on 790726:during Cold Shutdown,While Performing Design Change Request 78-201,control Power Cables to E11-F008 Valve Were Disconnected & Cut W/Valve in Open Position.Caused by Personnel Error.Valve Reconnected (← links)