Pages that link to "05000339/LER-1981-005, Forwards LER 81-005/03L-0"
Jump to navigation
Jump to search
The following pages link to 05000339/LER-1981-005, Forwards LER 81-005/03L-0:
Displayed 50 items.
- ML20003A380 (redirect page) (← links)
- ML20003A381 (← links)
- 05000338/LER-1981-050, Forwards LER 81-050/03L-0 (← links)
- 05000339/LER-1981-007, Forwards LER 81-007/03L-0 (← links)
- 05000338/LER-1981-062-03, Util Notified That 15 Block Walls in Fuel Bldg Did Not Meet Design Requirements of IE Bulletin 80-11.Caused by Refinement in Masonry Wall Design.Block Walls to Be Replaced (← links)
- 05000338/LER-1981-063-03, Reactor Trip Breaker B Failed to Open When High Pressurizer Pressure Signal Simulated.Caused by Failure of Metal Latch in Undervoltage Trip Attachment.Attachment Replaced (← links)
- 05000338/LER-1981-076-03, /03L-0:on 811117,two Valves on Train B Low Head Safety Injection Sys Found to Be Closed,Thereby Rendering Single ECCS Subsystem Inoperable.Caused by Operator Error. Valves Reopened (← links)
- 05000338/LER-1981-050-03, /03L-0:on 810615,individual Rod Position Indication for Rod J13 in Shutdown Bank a Deviated from Group Demand Position by Greater than 12 Steps.Caused by Instrument Drift.Channel for Rod J13 Properly Recalibr (← links)
- 05000339/LER-1981-007-03, /03L-0:on 801230,boron Concentration in Boron Acid Storage Tank C & Boron Injection Tank Below Tech Spec. Probably Caused by Inleakage of Unknown Source.Boric Acid Transferred to Tank C.Investigation of Leak Underway (← links)
- 05000338/LER-1981-090, Forwards Updated LER 81-090/99X-1 (← links)
- 05000339/LER-1981-089, Forwards LER 81-089/03L-0 (← links)
- 05000338/LER-1981-089-03, /03L-0:on 811217,during 99% Power,Turbine Driven Auxiliary Feedwater Pump Removed from Svc for Insp of Three Upsteam Check Valves.One Valve Found Missing Disc Nut,Washer & Retaining Pin.Parts Replaced on All Three Valves (← links)
- 05000338/LER-1981-089, Forwards LER 81-089/03L-0 (← links)
- 05000338/LER-1981-077-03, Boron Concentration in 1A & 1B Safety Injection Accumulators Exceeded Max Tech Specs Limit for Third Time in 1 Wk.Caused by Spent Fuel Pit Leakage Into Makeup Supply Header.Accumulator Drained (← links)
- 05000338/LER-1981-077, Forwards Updated LER 81-077/03X-1 (← links)
- 05000339/LER-1981-071-03, /03X-1:on 810911,hydraulic Snubber on Main Steam Line Inoperable Due to Loss of Oil from Reservoir.Caused by Leak Due to Scored Brass Bushing on Piston Shaft Extending Through Cylinder End.Snubbers Purged & Refilled (← links)
- 05000339/LER-1981-071, Forwards LER 81-071/03X-1 (← links)
- 05000339/LER-1981-066-03, Boron Concentration in 1C Safety Injection Accumulator Exceeded Max Tech Specs Limit. Caused by Inleakage Into Makeup Supply Header from Spent Fuel Pit.Concentration Restored by Draining Accumulator (← links)
- 05000338/LER-1981-084-03, /03L-0:on 811203,while in Mode 1 Operation,Doors Between Rod Drive Room & Auxiliary Bldg Failed to Close & Latch Automatically.Caused by Closure & Latching Mechanism Failure or by Door Misalignment.Doors Repaired (← links)
- 05000339/LER-1981-066, Forwards Updated LER 81-066/03X-1 (← links)
- 05000338/LER-1981-084, Forwards LER 81-084/03L-0 (← links)
- 05000339/LER-1981-070-03, Boron Concentration in Safety Injection Accumulators Exceeded Tech Specs.Caused by Leakage Into Makeup Supply Header from Spent Fuel Pit. Accumulator Refilled W/Borated Water (← links)
- 05000339/LER-1981-087-03, /03L-0:on 811203,while in Mode 1 Operation,Fire Doors from Cable Vault to Auxiliary Bldg & Rod Drive Room Would Not Close Automatically.Caused by Failure of Automatic Closure Mechanism.Closure Mechanism Replaced (← links)
- 05000339/LER-1981-087, Forwards LER 81-087/03L-0 (← links)
- 05000339/LER-1981-070, Forwards Updated LER 81-070/03X-1 (← links)
- 05000339/LER-1981-005, Forwards Updated LER 81-005/03X-1 (redirect page) (← links)
- ML20039F266 (redirect page) (← links)
- 05000339/LER-1981-005 (redirect page) (← links)
- 05000339/LER-1981-078, Updated LER 81-078/03X-1:on 811008-29,boron Concentration in Safety Injection Accumulators,Exceeded Tech Specs.Caused by Leakage Into Makeup Supply Header from Spent Fuel Pit. Accumulator Refilled W/Borated Water (← links)
- 05000338/LER-1981-073, Updated LER 81-073/03X-1:during 810827-0908,boron Concentration in Safety Injection Accumulators Exceeded Tech Specs.Caused by Leakage Into Make Up Supply Header from Spent Fuel Pit.Accumulator Refilled W/Borated Water (← links)
- 05000339/LER-1981-088-01, /01T-0:on 811209,reactor Was Taken Critical from Mode 3 to Mode 2 W/Solid State Protection Train B Trip Functions Defeated.Caused by Apparent Auxiliary Contact Failure (← links)
- 05000339/LER-1981-088, Forwards LER 81-088/01T-0 (← links)
- 05000339/LER-1981-086-03, /03L-0:on 811126,axial Flux Difference Deviated from Target During Performance of Moderator Temp Coefficient Test.Caused When Tave Was Reduced by Boration for Measurement of Moderator Coefficient Causing Oscillation (← links)
- 05000339/LER-1981-086, Forwards LER 81-086/03L-0 (← links)
- 05000338/LER-1981-079-03, /03L-0:on 811201,while Operating in Mode 1 at 100% Power,Emergency Diesel Generator 1J Was Declared Inoperable. Caused by Specific Gravity of One Battery Cell Falling Below Tech Spec.Cell Replaced (← links)
- 05000338/LER-1981-079, Forwards LER 81-079/03L-0 (← links)
- 05000338/LER-1981-083-03, /03L-0:on 811202,svc Water Supply Header B to Charging Pumps Was Isolated to Repair Pinhole Leak in Line.Caused by Aggressive Water & Bacterial Reduction of Mild Steel Piping.Section of Piping Replaced (← links)
- 05000338/LER-1981-083, Forwards LER 81-083/03L-0 (← links)
- 05000339/LER-1981-085-03, /03L-0:on 811112,boron Concentration in Casing Cooling Tank Found Out of Spec High.Caused by Use of Better Method for Analyzing Boron Samples.Tank Partially Drained, Filled W/Unboronated Water & Placed on Recirculation (← links)
- 05000339/LER-1981-085, Forwards LER 81-085/03L-0 (← links)
- 05000339/LER-1981-083-03, /03L-0:on 811106,fire Boundary Door to Emergency Diesel Generator Room 2H Found Inoperable.Caused by Failure of Door Latching Mechanism Due to Excessive Wear.Fire Watch Posted & Mechanism Repaired (← links)
- 05000339/LER-1981-072-03, Rod Position Indication for Rod B-8 in Bank D Indicated Greater That in 12 Steps Below Group Demand Position for That Bank.Caused by Instrument Drift.Channel Adjusted (← links)
- 05000339/LER-1981-083, Forwards LER 81-083/03L-0 (← links)
- 05000339/LER-1981-072, Forwards Updated LER 81-072/03X-1 (← links)
- 05000338/LER-1981-086-03, /03L-0:on 811112,boron Concentration in Casing Cooling Tank Found Out of Spec High.Caused by Use of Better Method for Analyzing Boron Samples.Tank Partially Drained, Filled W/Unboronated Water & Placed on Recirculation (← links)
- 05000338/LER-1981-086, Forwards LER 81-086/03L-0 (← links)
- 05000339/LER-1981-084-03, /03L-0:on 811112,card Reader Latch on Fire Door from Emergency Diesel Generator Room 2J Into Turbine Bldg Failed Open.Cause Not Given.Latch Repaired (← links)
- 05000339/LER-1981-084, Forwards LER 81-084/03L-0 (← links)
- 05000338/LER-1981-085-03, /03L-0:on 811116,emergency Diesel Generator Room 1H Fire Door Removed & Fire Watch Established.Caused by Need to Replace Door Damaged When Closed During Generator Operation.Design Mod Underway (← links)
- 05000338/LER-1981-085, Forwards LER 81-085/03L-0 (← links)
- 05000338/LER-1981-082-03, /03L-0:on 811103,loop B Channel II Delta T Indication Was More than Average of 3 Channels Measuring Parameter.Caused by Instrument Drift in Amplifier Card.Card Recalibr & Later Replaced (← links)
- 05000338/LER-1981-082, Forwards LER 81-082/03L-0 (← links)