Pages that link to "05000275/LER-1981-006, Forwards LER 81-006/03L-0"
Jump to navigation
Jump to search
The following pages link to 05000275/LER-1981-006, Forwards LER 81-006/03L-0:
Displayed 23 items.
- ML20038B932 (redirect page) (← links)
- 05000275/LER-1981-003-03, Liquid Radwaste Effluent Line Radiation Monitor RM-18 Found Inoperable.Caused by Separated Ctr Wire in Coax Connector Cable at Junction Between Connector Pin & Wire.Design Revised (← links)
- 05000275/LER-1981-002-01, Error Discovered in Diagram Used to Locate Vertical Seismic Floor Response Spectra for Equipment & Sys Seismic Design.Caused by Erroneous Use of Unit 2 Diagram for Unit 1 (← links)
- 05000275/LER-1981-002, Forwards Updated LER 81-002/01X-6 (← links)
- 05000323/LER-1981-002, Interim Deficiency Rept Re Inadequate Design of Sys Contained in Annulus Area of Containment Bldg,Initially Reported 811105.Further Info of Progress Is Identified in Suppls to LER 81-002 (← links)
- 05000275/LER-1981-010-03, /03L-0:on 811217,prior to Fuel Load,Documentation for Gross Gamma Analysis of Weekly Composite Sample for Oily Water Separator Discovered Missing for 811029-1119.Sheets Apparently Misplaced.Procedure Revised (← links)
- 05000275/LER-1981-010, Forwards LER 81-010/03L-0 (← links)
- 05000275/LER-1981-005-01, During Insp,Battery Cell Case Found Weeping.Further Insp Revealed 17 Cells W/Cracks Near Molded Support Ribs on Bottom of Cases.Caused by Inadequate Support of Cells.Racks Modified & Cells Replaced (← links)
- 05000275/LER-1981-005, Forwards Updated LER 81-005/01X-1 (← links)
- 05000275/LER-1981-009-03, /03L-0:on 811211,operator Failed to Perform Daily Channel Check on Iodine Sampler Flow Rate Monitor.Caused by Inadequate Instructions for Verifying Annunciator Window Operability.Procedure Change Issued (← links)
- 05000275/LER-1981-009, Forwards LER 81-009/03L-0 (← links)
- 05000275/LER-1981-007-03, /03L-0:on 811125,discovered That Tech Specs Surveillance Requirement 4.11.2.4.1 Re Project Doses Due to Gaseous Releases from Plant Not Performed within Required Time Interval.Caused by Personnel Oversight (← links)
- 05000275/LER-1981-007, Forwards LER 81-007/03L-0 (← links)
- 05000275/LER-1981-008-03, /03L-0:on 811130,discovered That Gross Alpha Activity Analysis Had Not Been Performed within Required Time Interval.Caused by Personnel Oversight.Sample Counted on 811130 (← links)
- 05000275/LER-1981-008, Forwards LER 81-008/03L-0 (← links)
- 05000275/LER-1981-006-03, /03L-0:on 811103,daily Channel Check on Plant Vent Flow Recorder Not Performed.Caused by Operator & Reviewer Failure to Note Step on Checklist.Operators Instructed & Procedure Simplified (← links)
- 05000275/LER-1981-006 (redirect page) (← links)
- 05000275/LER-1981-005-03, /03L-0:on 811015,prior to Fuel Load,During Insp in Conjunction W/Surveillance Testing,Battery Cell Case Found Weeping.Apparently Caused by Inadequate Support Leading to Cracking.Investigation Underway Re Mods (← links)
- 05000275/LER-1981-003, Forwards LER 81-003/03L-0 (← links)
- 05000275/LER-1981-004-03, /03L-0:on 810922,during Core Load Status Review, Oily Water Separator Effluent Line Radiation Monitor Found Invalidated.Caused by Unauthorized Readjustment of Monitor Controls.Monitor to Be Recalibr & Personnel Trained (← links)
- 05000275/LER-1981-004, Forwards LER 81-004/03L-0 (← links)
- 05000275/LER-1981-001-01, /01T-0:on 810922,prior to Fuel Load,Review of Reportability of Inoperable Plant Vent Rod Monitoring Channels RM-14A & B Revealed That Required STS 3.3.3.10 Action Statements 52 & 53 Had Not Been Entered (← links)
- 05000275/LER-1981-001, Forwards LER 81-001/01T-0 (← links)