ML25086A042

From kanterella
Jump to navigation Jump to search
Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000334/2025403 and 05000412/2025403
ML25086A042
Person / Time
Site: Beaver Valley
Issue date: 03/27/2025
From: Glenn Dentel
Division of Operating Reactors
To: Blair B
Vistra Operations Company
References
IR 2025403
Download: ML25086A042 (1)


See also: IR 05000334/2025403

Text

March 27, 2025

Barry Blair

Site Vice President

Vistra Operations Company, LLC

Beaver Valley Power Station

P.O. Box 4 - Route 168

Shippingport, PA 15077-0004

SUBJECT:

BEAVER VALLEY POWER STATION, UNITS 1 AND 2 - INFORMATION

REQUEST FOR THE CYBERSECURITY BASELINE INSPECTION,

NOTIFICATION TO PERFORM INSPECTION 05000334/2025403 AND

05000412/2025403

Dear Barry Blair:

On August 18, 2025, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

inspection in accordance with Inspection Procedure (IP) 71130.10, Cybersecurity, dated

December 14, 2021, at Beaver Valley Power Sation, Units 1 and 2. The inspection will be

performed to evaluate and verify your ability to meet the requirements of the NRCs

Cybersecurity Rule, Title 10 of the Code of Federal Regulations (10 CFR) Part 73, Section 54,

Protection of Digital Computer and Communication Systems and Networks. The onsite

portions of the inspection will take place from August 18-22, 2025.

Experience has shown that baseline inspections are extremely resource intensive, both for the

NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site

and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the

focus areas (i.e., sample set) to be inspected by IP 71130.10. This information should be

made available either on an online repository (preferred) or digital media (CD/DVD) no later

than May 16, 2025. The inspection team will review this information and, by June 13, 2025, will

request the specific items that should be provided for review.

The second group of additional requested documents will assist the inspection team in the

evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture,

and the areas of the licensees cybersecurity program selected for the cybersecurity inspection.

This information will be requested for review in the regional office prior to the inspection by

July 11, 2025, as identified above.

The third group of requested documents consists of those items that the inspection team will

review, or need access to, during the inspection. Please have this information available by the

first day of the onsite inspection, August 18, 2025.

B. Blair

2

The fourth group of information is necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection.

It is important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection. If any of the provided information changes between the time of submittal and the

inspection, please inform the inspection team lead.

The lead inspector for this inspection is Louis Dumont. We understand that our regulatory

contact for this inspection is Hope Gilliam of your organization. If there are any questions about

the inspection or the material requested, please contact the lead inspector at (610) 337-5183 or

via email at Louis.Dumont@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available

electronically for public inspection in the NRCs Public Document Room or from the Publicly

Available Records component of the NRC's Agencywide Documents Access and Management

System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Glenn T. Dentel, Chief

Engineering Branch 2

Division of Operating Reactor Safety

Docket Nos. 05000334 and 05000412

License Nos. DPR-66 and NPF-73

Enclosure:

Cybersecurity Inspection Document Request

cc: Distribution via ListServ

GLENN

DENTEL

Digitally signed by

GLENN DENTEL

Date: 2025.03.27

11:27:58 -04'00'

ML25086A042

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE

RI/DORS

RI/DORS

NAME

LDumont

GDentel

DATE

3/26/2025

3/26/2025

BEAVER VALLEY POWER STATION UNITS 1 AND 2

CYBERSECURITY INSPECTION DOCUMENT REQUEST

Enclosure

Inspection Report: 05000334/2025403 and 05000412/2025403

Inspection Dates:

August 18, 2025 to August 22, 2025

Inspection Procedure:

IP 71130.10, Cybersecurity, dated December 14, 2021

(ADAMS Accession Number: ML21271A106)

Reference:

Guidance Document for Development of the Request for

Information (RFI) and Notification Letter for IP 71130.10,

Cybersecurity (ML21330A088)

NRC Inspectors:

Louis Dumont, Lead

Brandon Pinson

(610) 337-5183

(610) 337-5091

Louis.Dumont@nrc.gov

Brandon.Pinson@nrc.gov

NRC Contractors:

Alan Konkal

James Hendricks

Alan.Konkal@nrc.gov James.Hendricks@nrc.gov

I.

Information Requested for In-Office Preparation

The initial request for information (i.e., first RFI) concentrates on providing the inspection

team with the general information necessary to select appropriate components and

Cybersecurity Program (CSP) elements to develop a site-specific inspection plan. The

first RFI is used to identify the list of critical systems and critical digital assets

(CSs/CDAs) plus operational and management security control portions of the CSP to

be chosen as the sample set required to be inspected by the cybersecurity inspection

procedure. The first RFIs requested information is specified below in Table RFI #1. The

Table RFI #1 information is requested to be provided to the regional office by

May 16, 2025, or sooner, to facilitate the selection of the specific items that will be

reviewed during the onsite inspection weeks.

The inspection team will examine the returned documentation from the first RFI and

identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more

focused follow-up request to develop the second RFI. The inspection team will submit

the specific systems and equipment list to your staff by June 13, 2025, which will identify

the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,

defensive architecture, and the areas of the licensees CSP selected for the

cybersecurity inspection. We request that the additional information provided from the

second RFI be made available to the regional office prior to the inspection by

July 11, 2025.

BEAVER VALLEY POWER STATION UNITS 1 AND 2

CYBERSECURITY INSPECTION DOCUMENT REQUEST

2

The required Table RFI 1 information shall be provided on an online repository

(preferred) or digital media (CD/DVD) to the lead inspector by May 16, 2025. The

preferred file format for all lists is a searchable Excel spreadsheet file. The information

should be indexed and hyperlinked to facilitate ease of use. If you have any questions

regarding this information, please call the inspection team leader as soon as possible.

Table RFI #1

Section 3,

Paragraph Number / Title:

IP Ref

1

A list of all Identified Critical Systems and Critical Digital Assets - highlight /

note any additions, deletions, or reclassifications due to new guidance from

white papers, changes to NEI 10-04, 13-10, etc. since the last cybersecurity

inspection.

Overall

2

A list of emergency preparedness and Security onsite and offsite digital

communication systems.

Overall

3

Network Topology Diagrams to include information and data flow for

critical systems in levels 2, 3 and 4 (If available).

Overall

4

Ongoing Monitoring and Assessment program documentation.

03.01(a)

5

The most recent effectiveness analysis of the Cybersecurity Program.

03.01(b)

6

Vulnerability screening / assessment and scan program documentation.

03.01(c)

7

Cybersecurity incident response documentation, including incident

detection, response, and recovery documentation as well as contingency

plan development and implementation, including any program

documentation that requires testing of security boundary device

functionality.

03.02(a)

and

03.04(b)

8 Device Access and Key Control program documentation.

03.02(c)

9

Password / Authenticator program documentation.

03.02(c)

10

User Account / Credential program documentation.

03.02(d)

11 Portable Media and Mobile Device control program documentation,

including kiosk security control assessment / documentation.

03.02(e)

12

Design change / modification program documentation and a list of all

design changes completed (field complete) since the last cybersecurity

inspection, including either a summary of the design change or the 50.59

documentation for the change.

03.03(a)

13

Supply Chain Management documentation.

03.03(a),

(b) and

(c)

14

Configuration Management program documentation.

03.03(a)

and (b)

15

Cybersecurity Plan and any 50.54(p) analysis to support changes to the plan

since the last inspection.

03.04(a)

16

Cybersecurity Metrics tracked (if applicable).

03.06 (b)

17

Provide documentation describing any cybersecurity changes to the access

authorization program since the last cybersecurity inspection.

Overall

BEAVER VALLEY POWER STATION UNITS 1 AND 2

CYBERSECURITY INSPECTION DOCUMENT REQUEST

3

Table RFI #1

Section 3,

Paragraph Number / Title:

IP Ref

18

Provide a list of all procedures and policies provided to the NRC as part of

this RFI with their descriptive name and associated procedure number (if

available).

Overall

19

Performance testing report (if applicable).

03.06 (a)

20

List of Condition Reports (or similar) associated with cybersecurity issues

written since the last inspection. Please include CR #, date written, and a

short description / title.

Overall

In addition to the above information please provide the following:

(1) Electronic copy of the updated final safety analysis report and technical

specifications.

(2) Name(s) and phone numbers for the regulatory and technical contacts.

(3) Current management and engineering organizational charts.

Based on this information, the inspection team will identify and select specific systems

and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and

submit a list of specific systems and equipment to your staff by June 13, 2025, for the

second RFI (i.e., RFI #2).

II.

Additional Information Requested to be Available Prior to Inspection.

As stated in Section I above, the inspection team will examine the returned

documentation requested from Table RFI #1 and submit the list of specific systems and

equipment to your staff by June 13, 2025, for the second RFI (i.e., RFI #2). The second

RFI will request additional information required to evaluate the CSs/CDAs, defensive

architecture, and the areas of the licensees CSP selected for the cybersecurity

inspection. The additional information requested for the specific systems and equipment

is identified in Table RFI #2.

The Table RFI 2 information shall be provided to the lead inspector by July 11, 2025.

The preferred file format for all lists is a searchable Excel spreadsheet. The information

should be indexed and hyperlinked to facilitate ease of use. If you have any questions

regarding this information, please call the inspection team leader as soon as possible.

Table RFI #2

Section 3,

Paragraph Number / Title:

Items

For the systems and CDAs chosen for inspection provide:

1 Ongoing Monitoring and Assessment activity performed on the system(s).

03.01(a)

2 All Security Control Assessments for the selected CDAs.

03.01(a)

3

All vulnerability screenings / assessments associated with or scans

performed on the selected system(s) since the last cybersecurity

inspection.

03.01(c)

BEAVER VALLEY POWER STATION UNITS 1 AND 2

CYBERSECURITY INSPECTION DOCUMENT REQUEST

4

Table RFI #2

Section 3,

Paragraph Number / Title:

Items

4

Documentation (including configuration files and rules sets) for Network-

based Intrusion Detection/Protection Systems (NIDS/NIPS), Host-based

Intrusion Detection Systems (HIDS), and Security Information and Event

Management (SIEM) systems for system(s) chosen for inspection.

03.02(b)

5

Documentation (including configuration files and rule sets) for intra-

security level firewalls and boundary devices used to protect the selected

system(s).

03.02(c)

6 Copies of all periodic reviews of the access authorization list for the

selected systems since the last inspection.

03.02(d)

7 Baseline configuration data sheets for the selected CDAs.

03.03(a)

8 Documentation on any changes, including Security Impact Analyses,

performed on the selected system(s) since the last inspection.

03.03(b)

9 Copies of the purchase order documentation for any new equipment

purchased for the selected systems since the last inspection.

03.03(c)

10 Copies of any reports / assessment for cybersecurity drills performed since

the last inspection.

03.02(a)

03.04(b)

11 Copy of the individual recovery plan(s) for the selected system(s) including

documentation of the results the last time the backups were executed.

03.02(a)

03.04(b)

12

Corrective actions taken as a result of cybersecurity incidents / issues to

include previous NRC violations and Licensee Identified Violations since

the last cybersecurity inspection.

03.05

13 For the selected systems, provide design change / modification packages

including completed work orders since the last cybersecurity inspection.

03.03(a)

III.

Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in Section II above, provide the

following RFI (i.e., Table 1ST Week Onsite) to the team by August 18, 2025, the first day

of the inspection.

Table 1ST Week Onsite

Section 3,

Paragraph Number / Title:

Items

1 Any cybersecurity event reports submitted in accordance with 10 CFR

73.77 since the last cybersecurity inspection.

03.04(b)

2

Updated copies of corrective actions taken as a result of cybersecurity

incidents / issues, to include previous NRC violations and Licensee

Identified Violations since the last cybersecurity inspection, as well as

vulnerability-related corrective actions.

03.05

In addition to the above information please provide the following:

(1) Copies of the following documents do not need to be specifically available to the

inspection team as long as the inspectors have easy and unrestrained access

to them.

BEAVER VALLEY POWER STATION UNITS 1 AND 2

CYBERSECURITY INSPECTION DOCUMENT REQUEST

5

a. Updated Final Safety Analysis Report, if not previously provided;

b. Original Cybersecurity Safety Evaluation Report and Supplements;

c. Quality Assurance (QA) Plan;

d. Technical Specifications, if not previously provided; and

e. Latest individual plant examination/probabilistic risk assessment report.

(2) Vendor Manuals, Assessment and Corrective Actions:

a. The most recent Cybersecurity QA audit and/or self-assessment; and

b. Corrective action documents (e.g., condition reports, including status of

corrective actions) generated as a result of the most recent Cybersecurity QA

audit and/or self-assessment.

IV.

Information Requested to be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provided daily during the

inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection

team leader.