Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/86-05. Appreciation Expressed for Clarification of Nuclear Review Board Review of Complete Mod Packages
ML20202C150
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/25/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
References
NUDOCS 8607110113
Download: ML20202C150 (2)


See also: IR 05000213/1986005

Text

,

.

4

s

JUN 85 19eg

.

Docket No. 50-213

Connecticut Yankee Atomic Power Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject: Inspection No. 50-213/86-05

This refers to your letter dated May 19, 1986, in response to our letter

dated February 24, 1986.

Thank you for clarifying that the Nuclear Review Board review of a complete

modification package is not necessarily performed prior to declaring a system

or component operational. Our inspector noted that for one modification the

Nuclear Review Board reviewed the complete modification package prior to de-

claring the system operational. He perceived this as a positive attribute.

The statement in the inspection report was made to this intent.

Your cooperation with us is appreciated.

Sincerely,

Original Signed By:

Lee H. Bettenhausen

1

Stewart D. Ebneter, Director

Division of Reactor Safety

cc:

R. Graves, Plant Superintendent

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

E. J. Mroczka, Vice President, Nuclear Operations

Gerald Garfield, Esquire

Public Document Room (PDR)

.

Local Public Document Room (LPDR)

i

!

Nuclear Safety Information Center (NSIC)

z0

NRC Resident Inspector

L

State of Connecticut

j

,

\\

8607110113 860625

gDR

ADOCK 05000213!

PDR

OFFICIAL RECORD COPY

RL HN 86-05 - 0001.0.0

06/24/86

O

Connecticut Yankee Atomic

2

,

Power Company

bec w/ enc 1:

Pegion I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

Section Chief, DRP

M. McBride, RI, Pilgrim

J. Shedlosky, SRI, Millstone 1&2

T. Rebelowski, SRI, Millstone 3

J. Akstulewicz, LPM, NRR

,

.

DRS:RI

D

.I

RS:RI

Napuda/pj

Eapen

Bettenhausen

6/13/86

6/y86

6/2;f/86

k/['k

0FFICIAL RECORD COPY

RL HN 86-05 - 0002.0.0

/

06/24/86

.

CONNECTICUT YANKEE ATOMIC POWER COMPANY

,

B E R L I N.

CONNECTICUT

P o DOX 270

HARTFoRo CONNECTICUT 06141-0270

TELEPHONE

203-665-5000

May 19,1986

Docket No. 50-213

A05700

Mr. Steward D. Ebneter, Director

Division of Reactor Safety

Region i

U. S. Nuclear Regulatory Commission

631 Park Avenue

King of Prussia, PA 19406

Reference:

(1)

S. D. Ebneter letter to 3. F. Opeka, dated April 14, 1986.

Gentlemen:

Haddam Neck Plant

Inspection Report No. 50-213/86-05

During the period February 24-28, 1986 an inspection was conducted at

Northeast Utilities' corporate offices in Berlin, Connecticut and at the Haddam

Neck Plant in Haddam, Connecticut by members of your office. Reference (1)

transmitted the report of this inspection. One of the findings stated in this

report is not entirely correct. Connecticut Yankee Atomic Power Company is

-

taking this opportunity to correct an apparent m,isunderstanding documented in

the inspection report.

Specifically, section 2.4, Findings, on page 4 of Inspection Report No. 50-213/86-

05 states:

" Complete modification packages rather than the safety evaluations are

reviewed by the committee prior to declaring the modified system or

component operational."

The Committeee referred to in the above excerpt is the Haddam Neck Plant

Nuclear Review Board (NRB).

'

The NRB does indeed review complete modification packages; however, this

function of the NRB is ng necessarily performed prior to declaring the modified

system or component operational. Performance of this function is in accordance

with Techn; cal Specification 6.5.2.

We note that the above excerpt is correct with respect to the Plant Operations

Review Committee (PORC). The PORC has the responsibility for reviewing

modification packages prior to declaring the system operational.

e

f*

. _ .

_

.

<

-2-

We hope this obviates any possibility of a misunderstanding of the respective

duties of the two review committees. Please feel f ree to contact us if any

questions arise.

Very truly yours,

CONNECTICUT YANKEE ATOMIC POWER COMPANY

% FAL

J. F. Opeka

O

Senior Vice President

I