v t~EnterV Entergy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB PO. Box 249 Buchanan, NY 10511-0249 Tel 914 734 6700 Fred Dacimo Site Vice President Administration May 13, 2004 Indian Point, Unit Nos. 2 and 3 Docket Nos. 50-247 and 50-286 NL-04-053
[1 OCFR50.36]
Document Control Desk U.S. Nuclear Regulatory Commission Mail Stop O-P1-17 Washington, DC 20555-0001
Subject:
Monthly Operating Report for April 2004
Reference:
- 1)
NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report," dated May 15, 1997
Dear Sir:
In accordance with Technical Specification 5.6.4, Entergy Nuclear Operations, Inc. (Entergy) hereby submits the Monthly Operating Report for the month of April 2004 for Indian Point Units 2 and 3. This submittal is in accordance with the new INPO Consolidated Data Entry (CDE) process, which uses the NRC Generic Letter 97-02 reduced data format (Reference 1). There are no new commitments contained in this correspondence.
Should you or your staff have any questions regarding this matter, please contact Mr. Patric W. Conroy, Manager, Licensing, Indian Point Energy Center at (914) 734-6668.
Fred R. Dacimo Site Vice President Indian Point Energy Center tl
-11:1-' q
Docket Nos. 50-247 and 50-286 NL-04-053 Page 2 of 2 : Operating Data Report Indian Point 2 : Operating Data Report Indian Point 3 cc:
Mr. Hubert J. Miller Regional Administrator - Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. Patrick D. Milano, Sr. Project Manager Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555-0001 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point Unit 2 P.O. Box 59 Buchanan, NY 10511-0059 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point Unit 3 P.O. Box 337 Buchanan, NY 10511-0337 Mr. Paul Eddy State of New York Public Service Commission 3 Empire Plaza Albany, NY 12223
OPERATING DATA REPORT NL-04-053 DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIC 50-247 Inidian Point 2 (Unit)
May 04, 2004 Tom Orlando..
(914) 736-8340 0D:
April 2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 993.00 956.00
- 3.
Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On-line
- 5.
Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWHrs)
This Month 719.00 719.00 0.00 709,977.00 Yr-to-Date 2,903.00 2,903.00 0.00 2,876,429.00 Cumulative 186,069.48 182,073.95 0.00 155,026,715.0 UNIT SHUTDOWNS Type Method of No.
Date F: Forced Duration Reasonl Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Comments 1
2 Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
SUMMARY
Indian Point 2 was synchronized to the grid for a total of 719 hours0.00832 days <br />0.2 hours <br />0.00119 weeks <br />2.735795e-4 months <br />, producing a gross generation of 734,719 MWH.
Page 1 of 1
OPERATING DATA REPORT NL-04-053 DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-286 Indian Point 3 (Unit)
May 04,2004 Tom Orlando (914) 736-8340 REPORTING PERIOD:
April 2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 979.00 979.00
- 3.
Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On-line
- 5.
Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWHrs)
This Month 719.00 719.00 0.00 719,226.00 Yr-to-Date 2,903.00 2,903.00 0.00 2,901,927.00 Cumulative 157,007.99 154,060.18 0.00 138,547,239.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments I
2 Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
SUMMARY
Indian Point Unit 3 was synchronized to the grid for a total of 719 hours0.00832 days <br />0.2 hours <br />0.00119 weeks <br />2.735795e-4 months <br />, producing a gross generation of 742,116 MWH.
Page 1 of 1