January 13, 2010 NOTE TO: File
FROM: Brian K. Harris, Project Manager /RA/ Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation
SUBJECT:
DOCKETING OF DECEMBER 3, 2009 U.S. NUCLEAR REGULATORY COMMISSION TELECONFERENCE NOTES PERTAINING TO THE LICENSE RENEWAL OF THE DUANE ARNOLD ENRGY CENTER This Note to File makes the following enclosed correspondence publicly available: U.S. Nuclear Regulatory Commission License Renewal Teleconference - December 3, 2009
Enclosure:
As stated CONTACT: Brian K. Harris, NRR/DLR 301-415-2277
ML100080009 OFFICE PM:RPB2:DLR LA:RPOB:DLR NAME BHarris SFigueroa DATE 01/13/10 01/11/10 Duane Arnold Energy Center cc: Mr. M. S. Ross Vice President and Associate General Counsel Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
Ms. Marjan Mashhadi Senior Attorney Florida Power & Light Company 801 Pennsylvania Avenue, NW Suite 220 Washington, DC 20004
Mr. Steven R. Catron Manager, Regulatory Affairs Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324
U.S. Nuclear Regulatory Commission Resident Inspector
=s Office Rural Route #1 Palo, IA 52324 Mr. Mano Nazir Senior Vice President and Nuclear Chief Operating Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408 Mr. D. A. Curtland Plant Manager Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785
Abdy Khanpour Vice President, Engineering Support Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408 Ms. Melanie Rasmussen Radiation Control Program Director Bureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th Floor 321 East 12th Street Des Moines, IA 50319-0075
Chairman, Linn County Board of Supervisors 930 1st Street SW Cedar Rapids, IA 52404 Mr. Raj Kundalkar, Vice President Fleet Organizational Support Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
Mr. McHenry Cornell Director, Licensing and Performance Improvement Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Christopher Costanzo Vice President, Nuclear Plant Support Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
ENCLOSURE Summary of Discussion with U.S. Nuclear Regulatory Commission Date: December 23, 2009
Time: 1:00pm CST Location: Telephone Conference Participants
- U.S. Nuclear Regulatory Commission (NRC) Duane Arnold Energy Center (DAEC)
Brian Harris Ken Putnam Emma Wong Curt Bock Thomas Morgan Mike Fairchild Mathew Yoder John VanSickel Robert Taylor Mike Fetzer Wilkins Smith Bob Vincent Abdul Sheikh Seung Min
Topic: Miscellaneous license renewal questions from NRC review of license renewal application (LRA) and request for additional information (RAI) responses
References:
As noted in summary Main Points of Discussion
- Additional RAIs Expected Project Manager indicated that DAEC could expect another set of RAIs in the next couple of weeks. Boral Commitment The content of the proposed commitment for spent fuel rack testing was discussed. NRC indicated a preference for a 10-element description (e.g., plant-specific program) rather than just a commitment. NRC indicated that with the 10-element description, there may not be a need for a separate commitment. DAEC indicated that commitment could just say to implement the new plant-specific program. It was agreed that the new program description could be submitted in January in conjunction with other RAI responses.
ACTION: DAEC to submit plant-specific program for testing of neutron absorbers in spent fuel racks sometime in January.
RAI 3.4-6 Follow-up re: Boiling-Water Reactor Mark 1 Containment Issues NRC questioned whether DAEC had reviewed the issues raised in Information Notice (IN) 2006-01 and IN 92-20. DAEC confirmed that the two INs had been evaluated. The review of IN 2006-01 concluded that fatigue cracking was not an issue for this plant due to the physical configuration. The review of IN 92-20 resulted in changes in the leak test procedure to include monitoring of both ends of two-ply bellows during testing. NRC indicated that this information was sufficient and no further action was needed.
RAI B3.16-1 Follow-up re: Compressed Air Monitoring Program NRC asked for more information regarding RAI B3.16-1 description of service air piping that is in scope. DAEC provided the following clarifications:
DAEC explained that the piping, isolation valve, and test valves on each side of containment penetration X-21 as shown on LR P&ID Bech-M130<9> are in scope for license renewal. Although these components are shown on the "Service Air" drawing, they were evaluated under "Instrument Air."
The short section of safety-related piping and valves which make up the primary containment boundary is connected to, but isolated from, service air outside the primary containment by means of a locked closed manual valve. The other end of this section of piping is blank flanged and is not connected to any components inside primary containment. This is the normal configuration of this penetration. This short section of piping is in scope for license renewal to provide a safety-related primary containment isolation function. This piping is managed by the Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components Program.
Service air originally supplied air to this pipe segment, but it was isolated approximately 25 years ago. The air in this pipe is not monitored. The piping remains isolated today, which means there is no air flow ever between this piping and the other portions of the instrument air system. The Backup Instrument Air Compressor, 1K001, is an active component and is not subject to aging management. The Backup Instrument Air Compressor housing; however, is in scope and subject to an aging management review (AMR), due to cooling water components that penetrate the compressor housing. The compressor housing itself is managed under XI.M38, Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components. Cooling water filled piping outside the compressor housing is in-scope and subject to an AMR for (a)(2).
Backup Instrument Air Compressor, 1K001, when running, discharges into the same receivers as the Instrument Air Compressors, 1K090A, B and C. This air is then supplied to the Instrument Air System, for which air quality is monitored.
Draft RAI B.3.28-2 NRC reviewed a new draft RAI B.3.28-2. This RAI expands the question raised in RAI 3.3.2.2.7-1. NRC will send a revised draft RAI with final wording before it is issued formally.
ACTIONS: DAEC: As noted above NRC: None Summary: N/A Disposition of Summary of Discussion with NRC
- 1) Summary for internal use _____
- 2) Meeting summary with copy provided to NRC __X
- 3) Docketed letter related to meeting