IR 05000263-11-408 (Drs), on July 15, 2011, Monticello Nuclear Generating Plant, Triennial Fire Protection Inspection Report
ML11235A906
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/23/2011
From: Daley R C
Engineering Branch 3
To: O'Connor T
Northern States Power Co
References
IR-11-408
Download: ML11235A906 (4)


See also: IR 05000263/2011408

Text

OFFICIAL USE ONL

Y - SECURITY-RELATED INFORMATION

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE ROAD, SUITE 210

LISLE, IL 60532

-4352 OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION

August 23, 2011

Mr. Timothy

J. O'Connor

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362

-9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT

TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000 263/201 1-4 08(DRS) Dear Mr. O'Connor: On July 15, 2011 , the U.S. Nuclear Regulatory Commission (NRC) completed a triennial fire protection inspection at your Monticello Nuclear Generating Plant. The enclosed inspection report documents the inspection results, which were discussed on July 15, 2011, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to your preparedness to handle large fires or explosions by verifying you continue to meet the requirements of your B.5.b license condition and Title

10, Code of Federal Regulations

(CFR) Part 50.54 (hh)(2). The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, one

NRC-identified finding of very low safety significance was identified. The finding involved a violation of NRC requirements. The finding did have a cross

-cutting aspect in the area of Human Performance within the resources component because the licensee did not develop and provide accurate procedures. However, because of the very low safety significance, and because the issue was entered into

your corrective action program, the NRC is treating th

e issue as a Non-Cited Violation

(NCV) in accordance with Section

2.3.2 of the NRC Enforcement Policy.

If you contest the subject or severity of th

is NCV, you should provide a response within 30

days of the date of this inspection report, with the basis for your denial, to the U.S.

Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with

a copy to the Regional Administrator, U.S. Nuclear Regulatory Commission

- Region III, 2443 Warrenville Road, Suite

210, Lisle, IL 60532

-4352; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the Resident Inspector

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled.

OFFICIAL USE

ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONL

Y - SECURITY-RELATED INFORMATION

T. O'Connor -2- Office at the Monticello Nuclear Generating Plant. In addition, if you disagree with the cross

-cutting aspect assigned to any finding in this report, you should provide a response withi n 30 days of the date of this inspection report, with the basis for your disagreement, to the

Regional Administrator, Region

III, and the NRC Resident Inspector at the Monticello Nuclear Generating Plant

. In accordance with 10

CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html

(the Public Electronic Reading Room).

Sincerely, /RA/ Robert C. Daley, Chief

Engineering Branch 3

Division of Reactor Safety

Docket No. 50

-263 License No. DPR-22 Nonpublic Enclosure

Inspection Report 05000263/2011008(DRS)

w/Attachment: Supplemental Information

cc w/encl:

S. Coker, NSIR/DSO/DDSO/ST

C. Johnson, NSIR

J. Trapp, Region I

M. Ernstes, RII

M. Hay, RIV

cc w/o encl: Distribution via ListServ

OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION

OFFICIAL USE ONL

Y - SECURITY-RELATED INFORMATION

T. O'Connor -2- Office at the Monticello Nuclear Generating Plant. In addition, if you disagree with the cross

-cutting aspect assigned to any finding in this report, you should provide a response within 30

days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region

III, and the NRC Resident Inspector at the Monticello Nuclear Generating Plant.

In accordance with 10

CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA/

Robert C. Daley, Chief

Engineering Branch 3

Division of Reactor Safety

Docket No. 50

-263 License No. DPR

-22 Nonpublic Enclosure

Inspection Report 05000263/2011008(DRS)

w/Attachment: Supplemental Information

cc w/encl:

S. Coker, NSIR/DSO/DDSO/ST

C. Johnson, NSIR

J. Trapp, Region I

M. Ernstes, RII

M. Hay, RIV

cc w/o encl:

Distribution via ListServ

DISTRIBUTION

See next page

DOCUMENT NAME:

G:\DRSIII\DRS\Work in Progress

\-MONT 2011 408 OUO

--Cover Letter GMH.docx

-Publicly Available

Sensitive -Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII NAME DSzwarc for GMHausman:ls

RDaley DATE 08/23/11 08/23/11 OFFICIAL RECORD COPY

OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION

Letter to Mr. Timothy J. O'Connor from Mr. Robert C. Daley dated August

23, 2011. SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT

TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000 263/201 1 008(DRS) DISTRIBUTION

Daniel Merzke

RidsNrrDorlLpl3

-1 Resource

RidsNrrPMMonticello

RidsNrrDirsIrib Resource

Cynthia Pederson

Steven Orth

Jared Heck

Allan Barker Carole Ariano

Linda Linn

DRPIII DRSIII Patricia Buckley

Tammy Tomczak

ROPreports Resource