ENS 40547
From kanterella
Revision as of 17:43, 24 September 2017 by StriderTol (talk | contribs) (Created page by program invented by Mark Hawes)
ENS Event | |
---|---|
06:05 Feb 26, 2004 | |
Title | Control Power Fuse Failure In Hpci System |
Event Description | The High Pressure Coolant Injection (HPCI) system had been removed from service to perform planned maintenance and testing. During post-maintenance testing, the HPCI gland seal condensate pump tripped due to a blown control power fuse. The maintenance scope did not include the pump or its power supply. The fuse was replaced and the surveillance completed satisfactorily. Investigation into the cause of the failure is ongoing. HPCI remains inoperable in support of additional pre-planned testing.
The licensee notified the State and the NRC Resident Inspector. |
Where | |
---|---|
Pilgrim Massachusetts (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor | |
Time - Person (Reporting Time:+2.55 h0.106 days <br />0.0152 weeks <br />0.00349 months <br />) | |
Opened: | Brian Louis 08:38 Feb 26, 2004 |
NRC Officer: | Arlon Costa |
Last Updated: | Feb 26, 2004 |
40547 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 40547\u003C/a\u003E - \u003Ca href=\"/Pilgrim\" title=\"Pilgrim\"\u003EPilgrim\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EControl Power Fuse Failure in Hpci System\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 40547 - Pilgrim\n","link":"","lat":41.942861111111114,"lon":-70.57673055555556,"icon":""}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Pilgrim with 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor | |
WEEKMONTHYEARENS 538152019-01-05T15:40:0005 January 2019 15:40:00
[Table view]10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor En Revision Imported Date 2/12/2019 ENS 417992005-06-26T14:55:00026 June 2005 14:55:00 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Emergency Diesel Generators Inoperable Due to High Ambient Temperature ENS 405472004-02-26T06:05:00026 February 2004 06:05:00 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor Control Power Fuse Failure in Hpci System 2019-01-05T15:40:00 | |