ML17275A512

From kanterella
Revision as of 10:31, 7 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Engineering Evaluation of Unit 2 Sacrificial Shield Wall.
ML17275A512
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/01/1980
From: RENBERGER D L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: YOUNGBLOOD B J
Office of Nuclear Reactor Regulation
Shared Package
ML17275A513 List:
References
GO2-80-167, NUDOCS 8008050196
Download: ML17275A512 (7)


Text

REGULATORY NFORMATION DISTRIBUTION SY EM (RIDS)ACCESSION NBR:8008050196 DOC~DATE: 80/08/01 NOTARI2EDi YES DOCKET FACIL:50 397 NPPSS Nuclear Projecti Unit 2E Nashington Public Powe 05000397 AUTHBNAME AUTHOR AFFILIATION RENBERGERiD.L, Hashington Pub'Iic Power Supply System RECIP~NAME RECIPIENT AFFILIATION YOUNGBLOODiB.J.

Licensing Branch 1 SUBJKCT: Forwards"En'gineering Evaluation of Unit 2 Sacrificial Shield Hall," SiU fCC,@or+.DISTRIBUTION CODE: BOOTS COPIES RECEIVED:LTR g ENCL gg SIZEl~AIZ TITLE: PSAR/FSAR AMDTS.and Related Correspondence NOTES:PM: 2 copies of all material.:

05000397 ACTION'@TERNAL:

RECIPIENT ID CODE/NAME A/D LICKNSNG RUSHBROOKIM>>

ACCID EVALI BR CHEM KNG BR CORE PERF BR 17 EFF TR SYS BR EQUIP QUAL" BR HYD/GEO BR f 1 IEE, 06 MECH ENG BR NRC PDR 02 POWER SYS BR QA BR 10 RKAC SYS BR SIT ANAL, BR 27 COPIES I.TTR ENCL 1 0 1 0 1 I 1 1: 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT'D CODE/NAME, YOUNGBLOODpB LYNCHED'5 AUX SYS BR 18 CONT SYS BR DIRi SFTY TECH EMERG PREP'2 GEOSCIENCES Inc SYS BR 20 MATL ENG BR MPA OELD PROC/TST REV BR RAD ASSESS BR12 G FIL Of ENG BR COPIES LTTR ENCL, 1 0 i 1 1 1 1 1 f.0 1 1 1 1 1 0 1 0 1 1 i 1 1.1 1 EXTERNAL: ACRS NSIC 04 16 16 1 1 LPDR 03 1 1 AUG 7 lg80 Q-ft'OTAL NUMBER OF COPIES REQUIRED!LTTR M ENCL

~I~~rr f a Washington Public Power Supply System A JOINT OPERATING AGENCY P.O.BOX 988 3000 GEO.WASHINCEON WAY RICHLAND.WASHINCEON 99352 PHONE (509)315 5000 August 1, 1980 G02-80-167 Docket No.50-397 Director, Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555 Attention:

Nr.B.J.Youngblood, Chief Licensing Branch No.1 Division of Licensing

Dear Nr.Youngblood:

Subject:

WPPSS Nuclear Project No.2 Engineering Evaluation of the Sacrificial Shield Wall

Reference:

(1)WPPSS to NRC letter, HNRR Approval of WNP-2 Sacrificial Shield Wall Weld Preparation", G02-80-95, April 25, 1980.(2)WPPSS to NRC letter, same subject as (1), G02-80-131, June 20, 1980.(3)Nemorandum from RH Engelken, Director, Region V, to HD Thornburg, Director of Reactor Construction Inspection, IE, HWNP-2 Sacrificial Shield Wall, Pipe Whip Restraints, and Related Structures", dated December 6, 1979.The NRC's Office of Inspection and Enforcement has, based on our under-standing, requested approval from NRR of the WPPSS corrective action plan for replacement of the slot welds on the Sacrificial Shield Wall (SSW)by a circumferential, partial penetration weld.References (1)and (2}provided information on the weld replacement to NRR.This letter transmits to you thirty (30')copies of the topical report,"Engineering Evaluation of the WNP-2 Sacrificial Shield Wall".goal 5 I/~O C Nr.BJ Youngblood Page 2 This report, References 1 and 2, and clarifications to be made at the forthcoming meeting, will provide sufficient information to NRR on the WNP-2 docket to accomplish the following:

o Obtain NRR approval of the proposed replacement weld, and o Update previous licensing documents on the loads and design of the SSW to document the technical adequacy of the as-built condition of the SSW.This report also provides WPPSS responses to the itemized concerns generated by I and E Region V (Reference 3)on the SSW.As such, this report is considered by WPPSS to be a comprehensive document, which in conjunction with identified actions in the report closes the technical aspects of the SSW issue on WNP-2 and will be referenced in the FSAR.It is WPPSS intent to request, at the August 6, Bethesda meeting, technical release from NRR by August 1S, 1980, for the limited scope of the slot'eld substitution on the basis of past submittals, and clarifications in the presentation and attached report.The enclosed report with References 1 and'2 provides background information.

Jr Very truly yours, D.L.Renberger Assistant Director Technology DLR:OKE/DCT:asm

Enclosure:

Engineering Evaluation Report on Sac Shield Wall (30)cc: V Stello, NRC RH Engelken, NRC ND Lewis, EFSEC, Olympia JR Lewis, BPA JJ Verderber, BSR-New York RC Root, B&R Si te GT Harper, B8R Site WNP-2 Files AD Toth-NRC, Region V

~~)'l'L/

"STATE OF WASHINGTON)

)ss COUNTY OF BENTON D.L.RENBERGER, Being first duly sworn, deposes and says: That he is the Assistant Director, Technology, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein;that he is authorized to submit the fore-going on behalf of said applicant; that he has read the foregoing and knows the contents thereof;and believes the same to be true to the best of his knowledge.

DATED , 1980 D.L.RENBERGER On this day personally appeared before me D.L.RENBERGER to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes therein mentioned.

GIYEN under my hand and seal this 3 I day of , 1980 Notary Pub sc in and for the tate of Washington Residing at a I 4 l'L gggli II I I 4 IIII'Ig r i 4 0 P