Monthly Operating Rept for Aug 1995 for WNP-2.W/950911 Ltr
ML17291B013
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/31/1995
From: EMBREE D G, PARRISH J V
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-95-174, NUDOCS 9509180179
Download: ML17291B013 (6)


Text

RZ0RXTY 1 (ACCELERATED RZDS PROCESSING)

REGULATORY INFORMATXON DXSTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9509180179 DOC.DATE: 95/08/31 NOTARIZED:

NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 P AUTH.NAME AUTHOR AFFILXATXON EMBREE,D.G.

Washington Public Power Supply System PARRISH,J.V.

Washington Public Power Supply System RECIP.NAME RECXPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Aug 1995 for WNP-2.W/950911 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR J ENCL i SIZE TITLE: Monthly Operating Report (per Tech Specs)NOTES: 0 RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: AC LE CEN 1 DRPM/PECB EXTERNAL: LITCO BRYCE, J H NRC PDR COPIES LTTR ENCL 1 1 10 10 1 1 1 1 5 1 1 1 1 RECIPIENT ID CODE/NAME CLIFFORD,J AEOD/SPD/RRAB NRR/DISP/PIPB RGN4 NOAC COPIES LTTR ENCL 1~1 1 1 1 1 1 1 1 1 D 0 C N NOTE,TO ALL"RIDS" RECZPZENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D8 (415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR.DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20 c'

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 September 11, 1995 G02-95-174 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT AUGUST 1995 Transmitted herewith is the Monthly Operating Report for the month of August 1995 as required by Technical Specification 6.9.1.6.cerely,~~~y J.'.ail Drop 1023)Vice President, Nuclear Operations JVP:DGE CC: LJ Callan, NRC RIV NRC Sr.Resident Inspector (927N)INPO ANI Library Utility Data Institute BPA (399)~pm~3~~r 950'st180179 950831 PDR ADOCK 050003'P7.,R PDR OPERATING STATUS REPORT for WNP-2 Date: September 1, 1995 2.3.4 5.6.7.8.9.10.11.Power to which restricted, if any (Net MW,): Reasons for restrictions, if any: Docket: 50-397 Reporting Period: AUGUST 1995 Outage+On-line Hours: 744.0 Utility Contact: David G.Embree (509)377-8448 Licensed Thermal Power (MW,): 3486 Nameplate Rating (Gross MW,): 1199*Design Electrical Rating (Net MW,): 1153" Maximum Dependable Capacity (Gross MW,): 1145"'aximum Dependable Capacity (Net MW,): 1099*If changes occur above since last report, give reasons:*Electrical ratings have been revised due to the reactor power uprate.None 12.13.14, 15.16.17.18.19.20.21.22.23.24.25.Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)Gross Electrical Energy (MwH)Net Electrical Energy (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (MDC Net)Unit Capacity Factor (DER Net)Unit Forced Outage Rate Forced Outage Hours MONTH 744.0 744.0 0.0 744.0 0.0 2,342,128 802,900 772,644 100.0%100.0%94.5%90.0%0.0%0.0 YEAR 5,831.0 4,006.2 404.5 3,753.9 577.1 11,900,778 4,078,240 3,902,056 64.4%74.3%61.5%59.5%8.5%348.6 CUMULATIVE 93,919.2 66,706.8 744.9 64,321.5 958.8 191,163,618 64,431,740 61,727,190 68.5%69.5%60.2%59.5%11.5%8,319.7 26.Shutdowns scheduled over the next 6 months (type, date, duration):

None 27.If currently shutdown, estimated startup date: NA Note: Cumulative Unit Capacity Factors (MDC&DER)are calculated with weighted averages.

t t AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:

50-397 WNP-2 September 1, 1995 D.G.Embree (509)377-8448 REPORT PERIOD: AUGUST 1995 DAY AVERAGE DAILY POWER LEVEL (Net MWe)AVERAGE DAILY POWER LEVEL DAY (Net MWe)10 12 13 14 15 1145 1144 1146 1143 1142 938 1032 1157 1155 1150 988 1033 1039 891 754 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 756 751 748 748 851 1125 1154 1149 1082 1057 1153 1152 1154 1152 1155 1152 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net)for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

REPORT PERIOD: AUGUST 1995 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

50-397 WNP-2 September 1, 1995 D.G.Embree (509)3774448-4 ,~No.Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 95-07 8/6/95 17.6 A NA INSTRU Limit turbine throttle valve position switches were possibly adjusted too close to the reset point during calibration (during R10).It is possible that during this calibration, which was performed with the plant shutdown, the limit switches were set in a position that did not leave sufficient margin for thermal expansion.

Adjusted.95%8 8/11/95 F 236.0 A NA CH INSTRU 1)Mechanical linkage loose/out of adjustment on feedwater pump turbine speed control.Adjusted.2)Wiring/coil degradation within the actuator of the governor control system.Replaced with refurbished unit.

SUMMARY

At the beginning of the month, the plant was operating at full power.While conducting monthly turbine valve testing, the plant experienced main turbine throttle valve position indication problems.The plant returned to full power operation following repairs and re-calibration of position indication.

Later, the plant reduced power to trouble shoot reactor feedwater pump speed control problems.Following repairs to speed control linkage and governor valve actuator system, the plant returned to full power operation.

TYPE F-Forced S-Scheduled REASON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other METHOD 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM&COMPONENT NUREGA161 Exhibits F&H