ML17333A879

From kanterella
Revision as of 06:51, 6 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Requests That Proprietary Rept Core Uncovery Due to Loop Seal Re-Plugging During Post-LOCA Recovery, Dtd Mar 1997,be Withheld (Ref 10CFR2.790)
ML17333A879
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/28/1997
From: LIPARULO N J
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To:
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17333A878 List:
References
NSD-NRC-97-5092, NUDOCS 9705070284
Download: ML17333A879 (5)


Text

ATTACHMENT 2 TO AEP:NRC: 1223B WESTINGHOUSE CORPORATION APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE Westinghouse Electric Corporation Energy Systems Nuclear Services Oivision Box 355 Pittsburgh Pennsylvania 15230 0355 April 28, 1997 NSD-NRC-97-5092 Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 Attention:

Document Control Desk

Subject:

"Core Uncovery Due to Loop Seal Re-Plugging During Post-LOCA Recovery," March 1997 Attached is one copy of letter report"Core Uncovery Due to Loop Seal Re-Plugging During Post-LOCA Recovery," March 1997.This report contains information which is proprietary to Westinghouse Electric Corporation.

Accordingly, we request that this information be withheld from public disclosure.

We will comply with the requirements of 10 CFR 2.790 to provide proprietary and non-proprietary version of the above material together with an affidavit as soon as the proprietary and non-proprietary versions have been prepared.We will submit the total required number of copies of the proprietary and non-proprietary versions of the information and the required affidavit at that time.We expect to be able to fully comply with the requirements of the proprietary and non-proprietary versions of the information and an accompanying affidavit within eight weeks.Very truly yours, Nicholas J.Li arulo, Manager Equipment Design and Regulatory Engineering DP/bbp Attachment cc: Kevin Bohrer/NRC(12H5)

NRC$092:April 28, t 997:ESQ52"The mission of HSD is to prouide our customers with people, equipment and services that set the standards of excellence in the nuclear industry." 9705070284 970430 PDR ADQCK 050003i5 P PDR

/(t, 4 ATTACHMENT 1 TO AEP:NRC:1223B CORE UNCOVERY DUE TO LOOP SEAL RE-PLUGGING DURING POST-LOCA RECOVERY 0>>II