Forwards Insp Rept 99901323/97-01 for Westlectric Castings, Inc,On 971117-19,notice of Violation & Notice of Nonconformance.Inspectors Found That Certain Avtivities Appeared to Be in Violation of 10CFR21.21
ML20008C250
Person / Time
Issue date: 01/26/1998
From: Black S
NRC (Affiliation Not Assigned)
To: Heine J
AFFILIATION NOT ASSIGNED
Shared Package
ML20008C251 List:
References
REF-QA-99901323 99901323-97-01, 99901323-97-1, NUDOCS 9801290208
Download: ML20008C250 (3)


Text

... -,

M.a q@

p*V%

g.

g 1

UP8.TED STATES i

.g

[

NUCLEAR RESULATORY COMMISSION o

WASHINGTON, D.C. 20555 0001

.....,o January 26, 1998 Mr. John R. Heine, President i

Westlectric Castings, incorporated 2040 Camfield Avenue City of Commerce. Califomia 00040

SUBJECT:

NRC INSPECTION REPORT 99901323/97-01 (NOTICE OF VIOLATION AND NOTICE OF NONCOf50RMANCE)

Dear Mr. Heine:

On November 17-19,1997, the U.S. Nuclear Regulatory Commission (NRr.) completed an inspection at your Westlectric Castings, Incorp6 rated (Westlectnc), facility. The encrosed report

' presents it:e results of that inspection.

During this inspection, the NRC inspectors noted "lat Westlectric personnel were knowledgeab'e and competent 2.n the performance of *heirjob functions. However, the NRC Inspectors found that certain of your activities appeared to be in vietation 0 NRC requirements. Specifically, although 10 CFR 21.21, " Notification of failure to comply or existence of a defect and its i

evaluation," requires that each corporation rubject to Part 21 regulations adopt procedures a enme the evaluation and proper reporting of deviations and failures to comply is performed, i

Westlectric did not establish an adequate procedure. This vio!stion is cited in the enclosec Ncice of Violation (NOV), end the ciretmstances surtounding the violation aie describec m detail in the enclosed report. Plaasa r.ote that you are required to respond to this letter and should follow the instructions specified b the enclosed NOV when preparing your response. The NRC will use your res sonse, in part, to determine whether further enforcement action is necessary to ensure compliance with regulatory requirements.

In addition, the NRC inspectors found that the implementation of your quality assurance prograns failed to meet certain NRC requirernnis imposed on you by your custome s. Specifically, the insr3ctors determined that compliance with 10 CFR Part 50, Appendia: B, " Quality Acsurance Criteria for Nuclear Power Plants and Fuel Reprocesring Plants," was contractually impcsed on Westlectric di approximately 1993 by Prcific Pump (currently ingersoll-Drecser Pump, Inc. (lDP) and Bryon Jackson Pu np Division (BW/IP.i. Although Wefectric unconc'itionally accepted the quality assurance (QA) provisions of 10 CFP Part 50, Appendix B, Wcitlectric did not 1stablish an adequate QA program to specifically identify or address cettain of the Appendix b rite 6ia at were applicable to Westlectric activities affecting the quality of 1.he components suppliso for safety-related ue.

These nonconformances are cited in the enclosed Notice of Nonconformance (NON), ar'd the circumstances surrounding them are described in detailin the encicced report. You are requested in respond to the nonconformances and should follow the instructivcs specified in the encloscd N ON when preparing your response.

v

}

p, a +

n 1.11.19.1.1.11111111lE or W " M m t..

E0 FEf CMTER CbPY

~

l 99901323 PDR

F-Mr. J.R. Heine 2

January 26, 1998 Given the extent of the concerns identihd by the NRC tr.spectors in 'he enclos9d Inspection l

Report, the adequacy of the quality oversight functions for the spectrometer operations is questionable. Therefore, you are also sequested to resp,nd regarding the review that Westlectric has implemented to ideatify (1) whether your chamical analyses of nuclear component castings has been correctly performed, (2) whetner the spectrometer operator training was adequate, (3) whether the spectrometer correction factor practice was appropriate, (4) whether any shipped casting's chemical analyses are questionable, and (5) v>hether appropriate quality vraification activities had been performed to ensure the integrity of the spectronieter operations, in accordance with 10 CFR 2.790 of the NRC's " Rules cf Practice," a copy of this fetter and its enclosures will be placed in the NRC's Public Document Room (PDR).

Sincerely, Onginal signed by Suzanne C Black Suzanne C. Black, Chief Quality Assurance, Vendor inspection and Maintenance Branch Division of F.eactor Controh 'rd Human Facto:

Office of Nuclear Reactor Regulation

Enclosures:

1. Notice of Violation
2. Notice of Nonconformance
3. InSpoction Report 99901320/97-01 DISTRIBUTION:

I HQMB R/F PUBLIC DNaujock JJSullivan JDavis IJLee Bill Rcgers Docket File 99900732 Central Files / RIDS lE:09 Whitebook

' ode PREVIOUS CONCURRENCE DOCUMENT NAME: G:\\ PETRO \\lR-RPT.WES T* receive a copy of this document indicate in ti.e box:

  • C" = Copy without enclosures *E" = copy with enclosures *N* = No copy 10fFICE HOMB:DRCH E

EMCB:DE E

HOMB:DRCH 6

HOMB:DRCH d

' N?.ME Petrosino # Db DGNaujock RAGram fjsfp SCBlackdh J

DATE 12/30/97* 'e@

12/24/97*

01/ c /98 01/Ab /98 0FFICIAL RECORD COPY

9 Mr. J.R. Heine January 26, 1998 Given the extent of the concems identified by the NRC inspectcrs in t% :nciosed Inspection Report, the adequacy of the quality oversight functions for the spectru.. " operations is questionable. Therefore, you are also requested to respond regarding the review that Westlectric has implemented to identify: (1) whether your chemical analyses of nuclear component castings has been correctly performed, (2) whether ti e spectrometer operator training was adequate, (3) whether the spectrometer correction factor practice was appropriate, (4) whether any shipped casting's chemical analyses are questionable, and (6) whether appropriate quality verification activities had been performed to ensure the integrity of the spectrometer operations.

In accordance with 10 CFR 2.790 of the NRC's Rules of Practice," a copy of this letter and its enclosures will be placed in the NRC's Public Document Room (PDR).

Sincerely,

.Ll 5

v Suzanne. Black, Chief Qualny Assurance, Vendor inspection and Maintenance Branch Division of Reactor Controls and Human Factors Office of Nuclear Reactor Regulation Docket No. 99901323

Enclosures:

1. Notice of Violation
2. Notica of Nonconformance
3. Inspection Report,99901323/97-01 l

l