ENS 50815
From kanterella
Revision as of 20:48, 1 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ENS Event | |
---|---|
12:00 Aug 25, 2014 | |
Title | Breakdown in the Quality Assurance Program for V. C. Summer 2 & 3 Construction Project |
Event Description | This is a 10 CFR 50.55 initial notification for a significant breakdown in the Quality Assurance (QA) Program of Chicago Bridge & Iron (CB&I), an agent for the Licensee of the V. C. Summer 2 & 3 Construction Project.
In August 2014, deviations were found in sub-modules CA03-06, -08, and -09 for the Vogtle 3 Construction Project, which initiated the discovery and evaluation processes for both Part 21 and 10 CFR 50.55. The conditions were determined to be not reportable by CB&I under 10 CFR 21, but an evaluation of the root cause analysis results concluded that a significant QA program breakdown had occurred that could have produced a defect. No defect has been identified. This initial notification is being made in accordance with 10 CFR 50.55(e)(4)(iii) and 10 CFR 50.55(e)(5)(i). The NRC Resident Inspector has been notified.". |
Where | |
---|---|
Summer South Carolina (NRC Region 2) | |
Reporting | |
10 CFR 50.55(e) | |
Time - Person (Reporting Time:+4108.32 h171.18 days <br />24.454 weeks <br />5.628 months <br />) | |
Opened: | Matthew Presson 17:19 Feb 12, 2015 |
NRC Officer: | Steve Sandin |
Last Updated: | Feb 12, 2015 |
50815 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 50815\u003C/a\u003E - \u003Ca href=\"/Summer\" title=\"Summer\"\u003ESummer\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EBreakdown in the Quality Assurance Program for V. C. Summer 2 \u0026amp; 3 Construction Project\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 50815 - Summer\n","link":"","lat":34.29653611111111,"lon":-81.31628333333333,"icon":"/w/images/6/6b/South_Carolina_Electric_%26_Gas_Company_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Not Critical |
Scram | No |
Before | Under Construction (0 %) |
After | Under Construction (0 %) |
Unit 3 | |
---|---|
Reactor critical | Not Critical |
Scram | No |
Before | Under Construction (0 %) |
After | Under Construction (0 %) |
WEEKMONTHYEARENS 511582015-02-17T12:00:00017 February 2015 12:00:00
[Table view]10 CFR 50.55(e) Quality Assurance Programmatic Issues ENS 508152014-08-25T12:00:00025 August 2014 12:00:00 10 CFR 50.55(e) Breakdown in the Quality Assurance Program for V. C. Summer 2 & 3 Construction Project ENS 504422014-03-13T12:00:00013 March 2014 12:00:00 10 CFR 50.55(e) Welding Program Deviations During Construction ENS 495822013-09-24T13:00:00024 September 2013 13:00:00 10 CFR 50.55(e) Deficiency Identified in Quality Assurance Program ENS 489102012-12-06T12:00:0006 December 2012 12:00:00 10 CFR 50.55(e) Failure to Comply with Conditions of Construction Permit 2015-02-17T12:00:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_50815&oldid=421771"