ML20217M723
| ML20217M723 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 04/01/1998 |
| From: | Tam P NRC (Affiliation Not Assigned) |
| To: | NRC (Affiliation Not Assigned) |
| References | |
| TAC-MA0355, TAC-MA0356, TAC-MA355, TAC-MA356, NUDOCS 9804080174 | |
| Download: ML20217M723 (2) | |
Text
syMoug 3
t UNITED STATES j
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20 6 0001 s
April 1,1998 e
3. ';
MEMORANDUM FOR:
- Docket File ! --
FROM:
Peter S. Tam, Senior Project Mana r
Project Directorate 11-2 Division of Reactor Projects - 1/II p
Office of Nuclear Reactor Regulation
SUBJECT:
CATAWBA NUCLEAR STATION, UNITS 1 AND 2 -
IMPLEMENTATION OF AMENDMENTS 163 and 155 TO OPERATING LICENSES (TAC MA0355 AND MA0356)
The attached document, transmitted by fax from Duke Energy Corporation, signifies the implementation of operating license Amendment Nos.163 (for Unit 1) and 155 (for Unit 2) on April 1,1998.
Docket Numbers 50-413 and 50-414 Distribution Docket file PUBLIC H. Berkow 990) 1 I
9804080174 980401 PDR ADOCK 05000413 P
)
f
~
duelear Policy Mamal - VAme 2 NSD Appendix D. 221. Implementation Sheet APPENDlX D. 221. FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET FACILITY OPERATING LICENSETTECHNICAL SPECIFICATIONS AMENDMENT IMPtatrATATION SilEET CNS O MNS O ONS UNIT NO.X1 203 b'S I O DATE RECEIVED S /fIS P TS NO.
AMENDMENT. NO. l(o 3/l55 DESCRIPTION bsi G 94.9 += cchee<.,_ waae or ru o q gopes,.3 w a % 1,vga, h w 4 % (q,6
- 1. IMPLEMENTATION DATES 3 3-lW A. NRC ISSUE DATE (Date of NRC Cover Letter):
B. NRC EFFECTIVE DATE (From Text of NRC letter):
3l2 hf C. STATION IMPLEMENTATION 'L L... L NRC Z,Ce Mh IbB
- 2. PLANT NOTIFICATION initiah date A.f%. / hhp Via E Mail Distribution; include Site Techrdcal Contacts BN. M Pre-implementation items (Items 1 5)
- 3. RGC TECHNICAL CONTENT REVIEW CRITERIA k A. All Discrepancies Have Been Remlved Via NRC Interface.
O B. No Inadvertent Changes Were Made To TS Sheets involved.
O C. TS Change Was issued As Requested By DPC.
TECHNICAL REVIEWER:
UM 3
Il i 'llf
) - Di v b l-s aheJ J Date (List Discrepancies tached Mu/N CHECKED BY:
ou
/
rv (List Discrepancies On Attached Page)
Date O-c99 oP95 g 4. PIP NUMBER (If generated):
- 5. O ALL CORRECTIVE ACTIONS, FROM ASSIGNED PIP COMPLETED - M/A VERIFIED BY: b $IM Ilir 8)Y Regulatory CompliaN Date
.tc ew o -es-ens ko, -,,:, s e,, 4 :
es n i
amm e w % to re.n Rowq NM-A L.o c b - m c-2143s (++ - - m - T% <,
m s.w g, A %,.
g,cor re At 4 %.'.,
vao 4 q M,
4,,
y g,,,(,
A__3 g a fe-~4. 3 ao s.
5 4-M *^"
- 3 h'IS 5r u U'
'"~"-8 ' " * " ~' ' 81%
WR t & ~.
(30 JUN 1997)
D-221-27 300 21-33NYrldM03 AHO.I.YInD311 16ICIC8CO8 IYd LT:9I 3.E S6/IC/C0 J