ML22269A390

From kanterella
Revision as of 15:41, 27 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Response to July 5, 2022 Request for Additional Information for Class 1 Excavation and Basement Survey Units
ML22269A390
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 09/07/2022
From: Sauger J
LaCrosseSolutions
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
Shared Package
ML22269A395 List:
References
LS-2022-0019
Download: ML22269A390 (5)


Text

S4601 State Highway 35, Genoa, WI 54632 September 7, 2022 LS-2022-0019 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 La Crosse Boiling Water Reactor Facility Operating License No. DPR-45 NRC Docket Nos. 50-409 and 72-046

Subject:

Response to July 5, 2022 Request for Additional Information for Class 1 Excavation and Basement Survey Units

Reference:

1) Marlayna Doell, U. S. Nuclear Regulatory Commission, E-mail to Gerard van Noordennen, EnergySolutions, Questions for La Crosse Solutions - July 7, 2022 Call, dated July 5, 2022 As a follow-up action to a conference call held on July 7, 2022 with the NRC Staff, and in response to a request for additional information (RAI) in Reference 1, LaCrosseSolutions is providing the enclosed additional information. The conference call was initiated to resolve any remaining questions on the NRC review of the Class 1 final status survey (FSS) area reports for the La Crosse Boiling Water Reactor site.

As a result of discussions on June 7, July 7, and August 24, 2022, with the NRC staff on the ongoing LACBWR FSS report review, an error was identified in the release record for the Waste Treatment Building (WTB) Excavation (Survey Unit L1-010-101C related to judgmental sample L1-010-101-FJ-GS-C16-SB). The sample result shows a concentration of 154 pCi/g of Cesium-137, which was determined to be a typographical error based on LaCrosseSolutionss determination that scans of the excavation slopes performed on September 12, 2017, identified no elevated areas.

The response to the RAI is provided in the attachment. The enclosed CD contains the supplemental information discussed in the RAI response and requested by the NRC Staff.

There are no regulatory commitments made in this submittal. If you should have any questions regarding this submittal, please contact Gerry van Noordennen at (860) 462-9707.

Respectfully, John Sauger President Reactor D&D and Chief Nuclear Officer Digitally signed by John Sauger Date: 2022.09.07 16:06:03 -04'00'

LaCrosseSolutions, LLC LS-2022-0019 Page 2 of 4

Attachment:

Responses to NRC July 5 Questions and July 7, 2022 Call

Enclosure:

CD containing supplemental information cc:

Marlayna Doell, U.S. NRC Project Manager (letter, attachment and enclosure)

Regional Administrator, U.S. NRC, Region III (letter, attachment and enclosure)

La Crosse Boiling Water Reactor Service List (letter and attachment only)

La Crosse Boiling Water Reactor Service List cc:

Ken Robuck President and CEO EnergySolutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 John Sauger President and Chief Nuclear Officer Reactor D&D EnergySolutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Joseph Nowak Project Manager LaCrosseSolutions S4601 State Highway 35 Genoa, WI 54632-8846 Russ Workman General Counsel EnergySolutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 Jerome Pedretti, Clerk Town of Genoa E860 Mundsack Road Genoa, WI 54632 Jeffery Kitsembel Division of Energy Regulation Wisconsin Public Service Commission P.O. Box 7854 Madison, WI 53707-7854 Paul Schmidt, Manager Radiation Protection Section Bureau of Environmental and Occupational Health Division of Public Health Wisconsin Department of Health Services P.O. Box 2659 Madison, WI 53701-2659 Brent Ridge President and CEO Dairyland Power Cooperative 3200 East Avenue South La Crosse, WI 54602-0817 Cheryl Olson, ISFSI Manager La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 P.O. Box 817 Genoa, WI 54632-8846 John Henkelman La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 Genoa, WI 54632-8846 Andrew J. Parrish Wheeler, Van Sickle & Anderson, S.C.

44 E. Mifflin Street, Suite 1000 Madison, WI 53703

LaCrosseSolutions LC-2022-0019 ATTACHMENT Responses to NRC July 5 Questions and July 7, 2022 Call

LaCrosseSolutions LC-2022-0019 ENCLOSURE CD Containing the following supplemental information:

1. Gamma Spectroscopy of Concrete Pucks
2. Release Record for Survey Unit L1-SUB-CDR - Stack, Pipe Tunnel, RPGPA Excavation, Revision 2
3. Release Record for L1-SUB-TDS B - RPGPA, Revision 2
4. LACBWR Gamma Spec Typo
5. NRC Sample #4 Gamma Spectrum Analysis