Final Rule: Congressional Review Act Summary, American Society of Mechanical Engineers Code Cases RG 1.84 Rev 40, RG 1.147 Rev 21, RG 1.192 Rev 5, and Revision of Inservice Inspection and Inservice Testing Code of Record Frequency Update
ML23291A339
Person / Time
Issue date: 08/15/2024
From:
Office of Nuclear Material Safety and Safeguards
To:
References
NRC-2018-0291, RIN 3150-AK23
Download: ML23291A339 (2)


Text

Congressional Review Act Summary AGENCY:

U.S. Nuclear Regulatory Commission TITLE OF ACTION:

American Society of Mechanical Engineers Code Cases and Update Frequency TYPE OF ACTION:

Final Rule LEVEL OF SIGNIFICANCE:

Non-Major AGENCY IDENTIFICATION:

3150 RIN AND/OR DOCKET ID:

3150-AK23 / NRC-2018-0291 DATE OF ISSUANCE:

June 2024 STATUTORY OR JUDICIAL DEADLINE:

None DESCRIPTION OF ACTION:

The U.S. Nuclear Regulatory Commission (NRC) is amending its regulations in 10 CFR 50.55a to provide the NRCs approval of recent American Society of Mechanical Engineers (ASME)

Code cases. Specifically, the final rule will incorporate the latest revision of three NRC regulatory guides containing the recent NRC-approved ASME code cases related to the ASME Boiler & Pressure Vessel (BPV) Code, Sections III and XI, Division 1, and the ASME Operation and Maintenance of Nuclear Power Plants (OM) Code, Division 1, Section IST. The final rule will also amend its regulations in 10 CFR 50.55a that require licensees to update at specified intervals the Inservice Inspection (ISI) and Inservice Testing (IST) Programs to recent editions and addenda of the ASME BPV and OM Codes, as incorporated by reference in 10 CFR 50.55a, to allow extended update intervals with specific conditions.

ASME periodically revises and updates its codes for nuclear power plants by issuing new editions and supplements containing code cases; this final rule is in accordance with the NRCs practice to incorporate those new code cases into the NRCs regulations. This rule maintains the safety of nuclear power plants, makes NRC activities more effective and efficient, and allows nuclear power plant licensees and applicants to take advantage of the latest ASME Code Cases. ASME is a voluntary consensus standards organization, and ASME Codes are voluntary consensus standards and ASME Code Cases are voluntary alternatives to portions of the ASME Codes. The NRCs use of the ASME Codes and the ASME code cases is consistent with applicable requirements of the National Technology Transfer and Advancement Act (NTTAA).

2 ANALYSIS Is there an annual effect on the economy of $100 million or more?

No. The NRCs analysis shows that the final rule would result in a net averted cost for industry of between $39.0 million (using a 7-percent discount rate) and $48.1 million (using a 3-percent discount rate). The NRC would realize a net averted cost of between

$6.6 million (using a 7-percent discount rate) and $8.1 million (using a 3-percent discount rate). The NRC and the industry benefit from the final rule because fewer Code alternative requests would be submitted to the NRC for staff review and approval on a plant specific basis under 10 CFR 50.55a(z).

Is there a major increase (typically 10% - 20%) in costs for consumers, individual industries, Federal, State, or local government agencies, or geographical regions?

There is no major increase in costs for consumers, individual industries, Federal, State, or local government agencies, or geographical regions as a result of the approval of the American Society of Mechanical Engineers Code Cases and Update Frequency rule.

Is there a significant adverse effect on competition, employment, investment, productivity, innovation, or on the ability of U.S.-based enterprises to compete with foreign-based enterprises in domestic and export markets?

There is no significant adverse effect on competition, employment, investment, productivity, innovation, or on the ability of U.S.-based enterprises to compete with foreign-based enterprises in domestic and export markets.

SUMMARY

The NRC believes that this final rule is not a major rule under the Congressional Review Act.