MONTHYEARML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval ML24166A0652023-07-27027 July 2023 Final Qa/Related Forms 1.3-1, 2.1-1, 2.3-1, 2.3-2, 2.3-4, 3.4-1 ML23178A0352023-06-27027 June 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML21237A5242023-06-0101 June 2023 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML23005A1062023-01-0505 January 2023 Requalification Program Inspection ML22235A7202022-06-14014 June 2022 Administrative Files ML22250A6832022-06-0202 June 2022 Administered Examination Files - Administered Written Test ML22243A2292022-05-27027 May 2022 Administered Examination Files - Administered Operating Test ML22242A2602022-05-16016 May 2022 Proposed Examination Submittal - Quality Checklists ML22206A2692022-05-11011 May 2022 Final Operating Test ML22299A1002022-05-11011 May 2022 Final Exam Review Checklists; Form 2.3-3, Form 2.3-5, and Form 5.1-1 ML22299A0102022-05-11011 May 2022 Final Qa/Related Forms ML22206A2582022-05-11011 May 2022 Final RO & SRO Written Examination with Answer Key ML22243A1072022-03-28028 March 2022 Proposed Examination Submittal - Proposed Operating Test ML22206A2642022-03-28028 March 2022 Proposed Examination Submittal - Proposed Written Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21348A7372021-12-0303 December 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21348A7522021-12-0303 December 2021 Final Operating Test Outlines (Folder 3) ML21348A7562021-12-0303 December 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21348A7342021-12-0303 December 2021 Final QA Related Forms (Folder 1) ML21348A7512021-12-0303 December 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21348A7452021-12-0303 December 2021 Draft Operating Test Outlines (Folder 2) ML21348A0542021-06-10010 June 2021 Final Qa/Related Forms (Folder 1) ML21348A0652021-06-10010 June 2021 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21237A5182021-06-0101 June 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21237A5142021-06-0101 June 2021 Final Operating Test (Sections a, B, and C (Folder 3) ML21239A0822021-05-18018 May 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21237A5352021-05-10010 May 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21105A6592021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Peach Bottom Atomic Power Station, Units 2 and 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21237A4782021-03-26026 March 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21237A5072021-03-26026 March 2021 Written - Draft Examination and Operating Test Outlines (Folder 2) ML21237A5022021-03-26026 March 2021 Draft - Written Examination (Folder 2) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A0542021-01-12012 January 2021 Requalification Program Inspection ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20261H4032020-09-17017 September 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20260H1632020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20184A2472020-06-30030 June 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML21056A2232020-06-30030 June 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML21056A2212020-06-30030 June 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21056A2202020-06-30030 June 2020 Final Qa/Related Forms (Folder 1) ML20184A2482020-06-30030 June 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20260H1672020-06-30030 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20260H1642020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20260H1662020-06-30030 June 2020 Draft Written Examination (Folder 2), Test Answer Key ML20260H1652020-06-30030 June 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20147A1662020-05-26026 May 2020 Operator Licensing Examination Approval ML20105A1822020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Peach Bottom Atomic Power Station, Units 2 and 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) 2024-04-11
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval ML24166A0652023-07-27027 July 2023 Final Qa/Related Forms 1.3-1, 2.1-1, 2.3-1, 2.3-2, 2.3-4, 3.4-1 ML23178A0352023-06-27027 June 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML21237A5242023-06-0101 June 2023 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML22235A7202022-06-14014 June 2022 Administrative Files ML22250A6832022-06-0202 June 2022 Administered Examination Files - Administered Written Test ML22243A2292022-05-27027 May 2022 Administered Examination Files - Administered Operating Test ML22242A2602022-05-16016 May 2022 Proposed Examination Submittal - Quality Checklists ML22299A1002022-05-11011 May 2022 Final Exam Review Checklists; Form 2.3-3, Form 2.3-5, and Form 5.1-1 ML22299A0102022-05-11011 May 2022 Final Qa/Related Forms ML22206A2582022-05-11011 May 2022 Final RO & SRO Written Examination with Answer Key ML22206A2692022-05-11011 May 2022 Final Operating Test ML22243A1072022-03-28028 March 2022 Proposed Examination Submittal - Proposed Operating Test ML22206A2642022-03-28028 March 2022 Proposed Examination Submittal - Proposed Written Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21348A7342021-12-0303 December 2021 Final QA Related Forms (Folder 1) ML21348A7512021-12-0303 December 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21348A7562021-12-0303 December 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21348A7372021-12-0303 December 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21348A7452021-12-0303 December 2021 Draft Operating Test Outlines (Folder 2) ML21348A7522021-12-0303 December 2021 Final Operating Test Outlines (Folder 3) ML21348A0542021-06-10010 June 2021 Final Qa/Related Forms (Folder 1) ML21348A0652021-06-10010 June 2021 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21237A5182021-06-0101 June 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21237A5142021-06-0101 June 2021 Final Operating Test (Sections a, B, and C (Folder 3) ML21239A0822021-05-18018 May 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21237A5352021-05-10010 May 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21237A4782021-03-26026 March 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21237A5072021-03-26026 March 2021 Written - Draft Examination and Operating Test Outlines (Folder 2) ML21237A5022021-03-26026 March 2021 Draft - Written Examination (Folder 2) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20261H4032020-09-17017 September 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20260H1632020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20260H1662020-06-30030 June 2020 Draft Written Examination (Folder 2), Test Answer Key ML20260H1652020-06-30030 June 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20184A2472020-06-30030 June 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML21056A2232020-06-30030 June 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML21056A2202020-06-30030 June 2020 Final Qa/Related Forms (Folder 1) ML20260H1672020-06-30030 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21056A2212020-06-30030 June 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20260H1642020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20184A2482020-06-30030 June 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20147A1662020-05-26026 May 2020 Operator Licensing Examination Approval ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19275E4622019-09-30030 September 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18128A0062018-05-0707 May 2018 Senior Reactor and Reactor Operator Initial License Examinations 2024-04-11
[Table view] |
Text
ES-401 Written Examination Qualify Checklist Form ES-401-6.
.* Facility: PBAPS Date of Exam:. 6/01/21. Examlevel:
. Item Description I Initial
- 1.. Questions and answers are technically accurate and applicable,to the facility[
- 2..a.* NRC K/As are referen~d for all questions.
. b.. Facility learning objecwes ar~ referenced as available..
.**.. :-.............. **. '1..
Correct answer explanation.and dlstractor analysjs provided (ES-401, Q.2.g)
3.. SRO quesiions a.re appr~priate in accordance withSection D.2.d of ES-401
4 The sampling process was random and system<1lic. (If more. than four RO oitwo SRO.
- questions were repe_ated from the I.ast two. NRC licensing exams, consult lhe!NRR/NRO OL program office)... '. '... i.
- 5.. Question duplication from the. iicensee screening/audit exain was ccintro.lled as i!idi~ted
. below (check the item that applies) arid appears appropriate;..,...
.. *. -... I
.. ~ The audit exam Was systein~iically and randomly developed' cir
- :_*the*... a~dit exam was completed before the license exam W<IS started, or.
I
.:_ the e~minations were* developed indepen.dently, *or I.*
.:_ the licensee certifies that there i~ nci dupUcation, 0~.
~*other (explain)...... '
- 6. Bank use meets limits (no more than 75% from ttie bank, Bank Modified
- at least.10°/4 new, and the re.st new or modifie'd); enter.the ' New actual RO/SRO-0nly question distribution(s) at right.. 13/6
- 1. BEltween.38 and 45 questions of.the questions on the RO. CIA
. exam arid at leasi 13 questions of the questions ori the.. Memory
- SRO-only portion of the exam are written at the... 1-'------'->-~----+-"-----+----'---+--'------;i comprehension/analysis level (see ES~401, D.2.c); enter 33/1 42/24
'the actual RO/SRO-oniy question distribution(s) afright. *
- 8. References/handouts provided dlstractors......... '.. do not give away* answers or aid in the elimin~tion <if
- 9.. Question content'conforrns to specific KIA statements iri the previously.approted ex~mination. *
- outline and is appropriate fo.r ihe tier to which they are afisigned; deviations are justified. *.
10... Que.stron psychometric quality and format meet the guidelines iri Appefidix B. 1.
- 11. Th~ exam: contains the required number ofone-poirit, im.illiple-chciice items; the total !ii.
- correct and agrees with the value on the cover sheet * * *
.
- Prin.ted Name/Signature,..... Date.
..... * *. *...... *.... *... i........ *
- /) *** * * * ** ***,, * * *
- a. : Author.S/l'i/tl
_b. *
- Facility Reviewer(*) <;1,/z,(
- c. NRC Chief Examiner(#) !I{+D/J-1.**
.d. NRC Regional Supervisor
No.le: The facility reviewer's initial~ or signature are not applicable for N~C-de~eloped examinations.
Independent NRC reviewer initials items in Col~mn "c": chief examiner dcincurrence is required.