IR 05000321/2022011

From kanterella
Revision as of 08:55, 16 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Fire Protection Team Inspection Report 05000321/2022011 and 05000366/2022011
ML22194A182
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/13/2022
From: Gerald Mccoy
NRC/RGN-II
To: Gayheart C
Southern Nuclear Operating Co
References
IR 2022011
Preceding documents:
Download: ML22194A182 (9)


Text

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT - FIRE PROTECTION TEAM INSPECTION REPORT 05000321/2022011 AND 05000366/2022011

Dear Mr. Dean:

On June 2, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Edwin I. Hatch Nuclear Plant and discussed the results of this inspection with Mr. Johnny Weissinger and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Gerald J. McCoy, Chief Engineering Br 2 Division of Reactor Safety Docket Nos. 05000321 and 05000366 License Nos. DPR-57 and NPF-5

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000321 and 05000366

License Numbers: DPR-57 and NPF-5

Report Numbers: 05000321/2022011 and 05000366/2022011

Enterprise Identifier: I-2022-011-0016

Licensee: Southern Nuclear Operating Co., Inc.

Facility: Edwin I. Hatch Nuclear Plant

Location: Baxley, GA

Inspection Dates: May 16, 2022 to June 02, 2022

Inspectors: P. Braaten, Senior Reactor Inspector L. Jones, Senior Reactor Inspector W. Monk, Senior Reactor Inspector M. Singletary, Team Lead, Reactor Inspector

Approved By: Gerald J. McCoy, Chief Engineering Br 2 Division of Reactor Safety

Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Fire Protection Team Inspection at Edwin I. Hatch Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

===71111.21N.05 - Fire Protection Team Inspection (FPTI)

Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)===

The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).

(1) U2 HPCI System E41
(2) Remote Shutdown Panel 2203F
(3) E DC Switchgear Room 1B Fire Detection System
(4) RHR Service Water Pump Intake Structure FA Fire Suppression System

Fire Protection Program Administrative Controls (IP Section 03.02) (1 Sample)

The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the licensees FPP contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.

(1) Hot Work Control Program

Fire Protection Program Changes/Modifications (IP Section 03.03) (1 Sample)

The inspectors verified the following:

a. Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.

b. The adequacy of the design modification, if applicable.

c. Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.

d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.

e. Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated.

(1) DECP SNC895929 1E11-F068 MOV Breaker Mod

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On June 2, 2022, the inspectors presented the Fire Protection Team Inspection results at the Exit Meeting to Plant Manager, Johnny Weissinger and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.21N.05 Calculations NMP-ES-050-F01 Hydraulic Model of Fire Protection Piping Network Ver. 4

SENH-16-007 Recovery Action Feasibility Assessment Rev. 5

SMNH-16-037 NFPA 72E Code Compliance Review Ver. 2

SMNH-16-044 Engineering Evaluation of Smoke Detector Locations Ver. 1

SMNH-16-063 Engineering Evaluation of Sprinkler System Restraint Ver. 1

Configurations

SMNH-16-064 Engineering Evaluation of Sprinkler Location and Spray Ver. 2

Pattern Configurations

SMNH-16-086 NFPA 805 Chapter 3 Fundamental Fire Protection Ver. 1

Program and Design Elements

SMNH-16-092 NFPA 805 Effects of Fire Suppression Activities Review Ver. 2

Corrective Action CR 10751486 NFPA 805 Study - Breaker Coordination Issues 11/4/2020

Documents CR 10766792 Breaker/Wire sizing issue found during NFPA 805 01/14/2021

breaker coordination modification

CR 10785119 NFPA 805 Breaker Coordination (Broadness Review) 03/25/2021

CR 10790835 Expected Alarm not received 04/15/21

CR 10865147 2022 NRC Fire Protection FASA - Breaker Coordination 03/9/2022

Issues

CR 10869282 NFPA 805 Breaker Coordination Refined FPRA 03/25/2022

Evaluation Results

CR 10875233 Leak From DIV 2 RHRSW Strainer Piping Connecting to 04/21/2022

1E11F907A Root Valve

Corrective Action CR 10881563 2022 NRC Fire Protection Team Inspection (FPTI) - Typo 05/17/2022

Documents

Resulting from CR 10881741 2022 NRC Fire Protection Team Inspection (FPTI) - 05/18/22

Inspection Procedure update

CR 10882170 During the 2022 TFPI the team identified an addition error 05/19/2022

in SENH-16-007

CR 10885073 2022 TFPI Protectowire System Wire Frayed 06/01/2022

CR 10885074 2022 TFPI Non-FP Covering Deficiency 06/01/2022

CR 10885136 Housekeeping - Unit 1 Condensate Demin Panel 06/02/2022

CR 10885296 FPTI 2022: Evaluation of Communication Methods Used 06/02/2022

Inspection Type Designation Description or Title Revision or

Procedure Date

for Alt. Shutdown

Drawings H-58236 U2 RHR System 2E11-F047B Elementary Diagram Rev. 1

Engineering SNC895929DECP Design Change Package for "Bucket Mod" 8/18/2020

Changes

Miscellaneous HNP Fire Protection Health Report 01/26/2022

HNP Fire Protection Health Report 07/14/2021

NFPA-805 Mods NFPA-805 Mods Schedule 5/19/22

Schedule

1097182 Fire Protection Program NRC Inspection FASA 04/20/2022

H-LT-SG-50213 Bomb Threat/Shutdown From Outside the MCR Rev. 12

HNP-2-FSAR-9 Plant Hatch U2 FSAR, Section 9.5.1, FIRE Rev. 39

PROTECTION SYSTEM

Procedures 34AB-X43-001-2 Fire Procedure 23.2

34IT-EOP-001-0 EOP Equipment Checks VERSION

18.3

2SV-FPX-037-0 Fire Detection Instrumentation Surveillance Ver. 8

2SV-FPX-016-1 Sprinkler System Surveillance - Safety Related Areas Ver. 4.7

2SV-FPX-017-1 Surveillance of Water Fire Suppression Systems VERSION

1.0

NMP-ES-035 Fire Protection Program 7

NMP-ES-035-001 Fire Protection Program Implementation 14

NMP-ES-035-003 Fleet Hot Work Instruction 07/20/2021

NMP-ES-039 Engineering Analysis VERSION

4.1

NMP-OS-007-001 Conduct of Operations Standards and Expectations VERSION

19.0

NMP-OS-014-002 HNP Time Critical Operator Action Program 4

Work Orders SNC1101351 42SV-FPX-037-0 Fire Detection Instrumentation 08/15/2021

Surveillance

SNC1338887 Hot Work Permit Yard, Fire Pump HS 05/17/2022

SNC990383 42SV-FPX-037-0 Fire Detection Instrumentation 04/09/20

Surveillance

WO SNC1024402 57SV-C82-003-2 ## REMOTE SHUTDOWN REACTOR 02/14/2021

Inspection Type Designation Description or Title Revision or

Procedure Date

VESSEL WATER LEVEL LOOP CALIBRATION

WO SNC1168028 Recoat 1Y43111W01 Fire Protection Piping 07/15/2021

7