Letter Sequence Approval |
---|
|
|
MONTHYEARRS-23-032, Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location2023-02-0303 February 2023 Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location Project stage: Request RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0808 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b Project stage: Request ML23178A0742023-08-0707 August 2023 Issuance of Amendment Nos. 296 and 292 Adoption of TSTF-416 Low Pressure Coolant Injection (LPCI) Valve Alignment Verification Note Location Project stage: Approval RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-13013 December 2023 Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days Project stage: Request RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request – Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-15015 December 2023 Response to Request for Additional Information for the Emergency License Amendment Request – Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days Project stage: Response to RAI ML23349A1622023-12-17017 December 2023 Issuance of Amendment Nos. 298 and 294 Increase Completion Time in Technical Specification 3.8.1.B.4 (Emergency Circumstances) Project stage: Approval 2023-12-17
[Table View] |
|
---|
Category:Letter
MONTHYEAR05000265/LER-2024-002-01, Turbine Trip and Automatic Scram Due to Digital EHC Power Supply Intermittent Failure2024-10-30030 October 2024 Turbine Trip and Automatic Scram Due to Digital EHC Power Supply Intermittent Failure SVP-24-065, Offsite Dose Calculation Manual (ODCM) Section 12.2.2 Radioactive Gaseous Effluent Monitoring Instrumentation Report Main Chimney High Range Noble Gas Monitor2024-10-29029 October 2024 Offsite Dose Calculation Manual (ODCM) Section 12.2.2 Radioactive Gaseous Effluent Monitoring Instrumentation Report Main Chimney High Range Noble Gas Monitor IR 05000254/20240102024-10-28028 October 2024 Age Related Degradation Inspection Report 05000254/2024010 and 05000265/2024010 and Notice of Violation RS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests SVP-24-059, Correction to Registration of Use of Casks to Store Spent Fuel2024-10-0404 October 2024 Correction to Registration of Use of Casks to Store Spent Fuel ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24247A1642024-09-30030 September 2024 Alternative Request RP-01 IR 05000254/20244022024-09-12012 September 2024 Material Control and Accounting Program Inspection Report 05000254/2024402 and 05000265/2024402 (Public) SVP-24-054, Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines - Inspection of Top Guide Rim Welds2024-09-11011 September 2024 Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines - Inspection of Top Guide Rim Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000254/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Quad Cities Nuclear Power Station (Report 05000254/2024005; 05000265/2024005) RS-24-078, Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval2024-08-20020 August 2024 Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval ML24183A1082024-08-0808 August 2024 – Issuance of Amendment Nos. 302 and 298 Adoption of Tstf-505, Provide Risk Informed Extended Completion Times – RITSTF Initiative 4b SVP-24-049, Owners Activity Report Submittal Sixth 10-Year Interval 2024 Refueling Outage Activities2024-08-0707 August 2024 Owners Activity Report Submittal Sixth 10-Year Interval 2024 Refueling Outage Activities IR 05000254/20243012024-08-0101 August 2024 NRC Initial License Examination Report 05000254/2024301; 05000265/2024301 SVP-24-048, Registration of Use of Casks to Store Spent Fuel2024-07-31031 July 2024 Registration of Use of Casks to Store Spent Fuel 05000265/LER-2024-002, Turbine Trip and Automatic Scram Due to Digital EHC Power Supply Intermittent Failure2024-07-22022 July 2024 Turbine Trip and Automatic Scram Due to Digital EHC Power Supply Intermittent Failure RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions SVP-24-041, Regulatory Commitment Change Summary Report2024-07-0505 July 2024 Regulatory Commitment Change Summary Report SVP-24-043, Registration of Use of Casks to Store Spent Fuel2024-07-0505 July 2024 Registration of Use of Casks to Store Spent Fuel ML24162A0982024-07-0303 July 2024 – Issuance of Amendment Nos. 301 and 297 Adoption of 10 CFR 50.69 Risk Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors SVP-24-040, Registration of Use of Casks to Store Spent Fuel2024-06-25025 June 2024 Registration of Use of Casks to Store Spent Fuel RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations SVP-24-039, Ile Post Exam Package Letter2024-06-12012 June 2024 Ile Post Exam Package Letter RS-24-053, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed2024-06-0606 June 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed ML24110A0492024-05-28028 May 2024 Audit Report Related to the TSTF-505 and 10 CFR 50.59 Amendments ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes ML24141A2102024-05-20020 May 2024 Operator Licensing Examination Approval - Quad Cities Nuclear Power Station, May 2024 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000254/20240012024-05-14014 May 2024 Integrated Inspection Report Nos. 05000254/2024001 and 05000265/2024001 SVP-24-034, Annual Radiological Environmental Operating Report2024-05-10010 May 2024 Annual Radiological Environmental Operating Report 05000265/LER-2024-001, Automatic Actuation of Reactor Protection System During Scram Discharge Volume Leak Rate Testing2024-05-10010 May 2024 Automatic Actuation of Reactor Protection System During Scram Discharge Volume Leak Rate Testing RS-24-042, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-05-10010 May 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-046, 10 CFR 50.46 Annual Report2024-05-0606 May 2024 10 CFR 50.46 Annual Report ML24109A0662024-05-0202 May 2024 – Relief Request I5R-26, Revision 0 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests SVP-24-028, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2024-04-26026 April 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVP-24-029, Radioactive Effluent Release Report for 20232024-04-26026 April 2024 Radioactive Effluent Release Report for 2023 ML24114A1712024-04-23023 April 2024 State of Illinois (IEMA-OHS) Comment Quad Cities HI-STORM Exemption Environmental Assessment IR 05000254/20245012024-04-0505 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000254/2024501 and 05000265/2024501 RS-24-032, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-04-0505 April 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion SVP-24-024, Corrected Radioactive Effluent Release Report for 20222024-04-0505 April 2024 Corrected Radioactive Effluent Release Report for 2022 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report SVP-24-023, Ile Outline Submittal Letter2024-03-29029 March 2024 Ile Outline Submittal Letter RS-24-019, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF2024-03-19019 March 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF ML23340A1552024-03-15015 March 2024 – Issuance of Amendment Nos. 299 and 295 Adoption of TSTF-564, Safety Limit MCPR RS-24-020, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS2024-03-15015 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS SVP-24-018, Ile Proposed Exam Submittal Letter2024-03-13013 March 2024 Ile Proposed Exam Submittal Letter 2024-09-04
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24183A1082024-08-0808 August 2024 – Issuance of Amendment Nos. 302 and 298 Adoption of Tstf-505, Provide Risk Informed Extended Completion Times – RITSTF Initiative 4b ML24162A0982024-07-0303 July 2024 – Issuance of Amendment Nos. 301 and 297 Adoption of 10 CFR 50.69 Risk Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML23340A1552024-03-15015 March 2024 – Issuance of Amendment Nos. 299 and 295 Adoption of TSTF-564, Safety Limit MCPR ML23349A1622023-12-17017 December 2023 Issuance of Amendment Nos. 298 and 294 Increase Completion Time in Technical Specification 3.8.1.B.4 (Emergency Circumstances) ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23178A0742023-08-0707 August 2023 Issuance of Amendment Nos. 296 and 292 Adoption of TSTF-416 Low Pressure Coolant Injection (LPCI) Valve Alignment Verification Note Location ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML22347A2412023-02-0606 February 2023 Issuance of Amendment Nos. 294 and 290 Control Rod Scram Times (Public) - ML22298A0022022-12-15015 December 2022 – Issuance of Amendment Nos. 293 and 289 Transition to GNF3 Fuel (EPID L-2021-LLA-0159) (Public) ML22217A0442022-12-0707 December 2022 Issuance of Amendment Nos. 292 and 288 Control Rod Scram Times ML22308A1602022-12-0202 December 2022 – Issuance of Amendment Nos. 291 and 287 New Fuel Vault and Spent Fuel Storage Pool Criticality Methodologies ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22021B6602022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) ML22031A2762022-02-0101 February 2022 Issuance of Indemnity Agreement Amendments-Enclosure 2 ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21307A3422021-12-0707 December 2021 Issuance of Amendments to Adopt Reactor Pressure Vessel Water Inventory Control Enhancements (EPIDs L-2020-LLA-0253 and L-2020-LLA-0254) ML21301A2192021-11-10010 November 2021 Request for Withholding Information from Public Disclosure for Quad Cities Nuclear Power Station, Units 1 and 2 License Amendment Request Regarding Transition to GNF3 Fuel ML21301A2202021-11-10010 November 2021 Request for Withholding Information from Public Disclosure for Quad Cities Nuclear Power Station, Units 1 and 2 License Amendment Request Regarding Transition to GNF3 Fuel ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20150A3282020-06-26026 June 2020 Issuance of Amendment Nos. 281 and 277 to Increase Allowable Main Steam Isolation Leakage ML20094F8332020-04-0909 April 2020 Issuance of Amendment No. 276, Revise Technical Specification 3.6.1.3 Related to Increased Allowed Main Steam Isolation Valve Leakage (Emergency Circumstances) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20034G5462020-03-12012 March 2020 Issuance of Amendments Revising Instrument Testing and Calibration Definitions ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML19301A3392019-12-0404 December 2019 Issuance of Amendments to Revise Technical Specification 2.1.1, Reactor Core Safety Limits, the Minimum Critical Power Ration Safety Limits ML19266A5272019-10-0808 October 2019 Issuance of Amendments to Eliminate Second Completion Times from Technical Specifications RS-19-017, Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control2019-06-14014 June 2019 Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control ML18353A2292019-01-28028 January 2019 Issuance of Amendment Nos. 273 and 268 Regarding Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18304A3652019-01-16016 January 2019 2. Issuance of Amendments to Revise the Average Power Range Monitor Requirements ML18254A3672018-10-29029 October 2018 County 1 & 2; and Quad Cities 1 & 2 - Issuance of Amendments 220, 259, 252, 231, 217, 271 and 266 to Revise Technical Specification Requirements for Inoperable Snubbers ML18206A2822018-08-0202 August 2018 Issuance of Amendments to Relocate the Staff Qualification Requirements ML17311A1622017-12-0101 December 2017 Issuance of Amendments Regarding Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML17163A3552017-08-31031 August 2017 Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490) ML17073A0672017-05-26026 May 2017 Issuance of Amendments Revising the Technical Specification Requirements for the Inservice Testing Program (CAC Nos. MF8238 - MF8256) ML17037D2122017-02-16016 February 2017 Issuance of Amendments to Revise Surveillance Requirement for Secondary Containment Access Doors ML16218A4852016-10-20020 October 2016 DNPS Unit Nos. 2 and 3, QCNPS Unit Nos. 1 and 2 - Issuance of LAR to Renewed Facility Operating License Nos. DPR-19, 25, 29, 30 TS Revision to Support Areva Atrium 10XM Fuel Transition ML16231A1312016-10-17017 October 2016 Issuance of Amendments Regarding Spent Fuel Pool Criticality Methodology for Fuel Channel Bow/Bulge (Cac. Nos. MF7160 and MF7161) RS-16-133, Certification of Permanent Cessation of Power Operations2016-06-20020 June 2016 Certification of Permanent Cessation of Power Operations ML16111A1042016-05-11011 May 2016 Issuance of Amendments to Revise the Reactor Steam Dome Pressure in Technical Specification 2.1.1, Reactor Core SLs (CAC Nos. MF6640-MF6644) ML15324A4392015-12-17017 December 2015 Issuance of Amendments (CAC Nos. MF5471-MF5476) ML15183A3512015-08-0505 August 2015 Issuance of Amendments Concerning Adding Topical References to Technical Specifications (TAC Nos. MF3359, MF3363, MF3361, and MF3362)(RS-13-288) ML15153A2822015-07-30030 July 2015 Issuance of Amendments Revising the Completion Date for Milestone 8 of the Cyber Security Plan (TAC Nos. MF4728, MF4729, MF4730, MF4731, MF4732, MF4733, MF4734, MF4735, MF4736, MF4737, MF4738, MF4739, MF4740 ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) 2024-08-08
[Table view] Category:Safety Evaluation
MONTHYEARML24247A1642024-09-30030 September 2024 Alternative Request RP-01 ML24183A1082024-08-0808 August 2024 – Issuance of Amendment Nos. 302 and 298 Adoption of Tstf-505, Provide Risk Informed Extended Completion Times – RITSTF Initiative 4b ML24162A0982024-07-0303 July 2024 – Issuance of Amendment Nos. 301 and 297 Adoption of 10 CFR 50.69 Risk Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24109A0662024-05-0202 May 2024 – Relief Request I5R-26, Revision 0 ML23340A1552024-03-15015 March 2024 – Issuance of Amendment Nos. 299 and 295 Adoption of TSTF-564, Safety Limit MCPR ML23349A1622023-12-17017 December 2023 Issuance of Amendment Nos. 298 and 294 Increase Completion Time in Technical Specification 3.8.1.B.4 (Emergency Circumstances) ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23206A0382023-09-21021 September 2023 – Proposed Alternative to the Requirements of the ASME Code ML23178A0742023-08-0707 August 2023 Issuance of Amendment Nos. 296 and 292 Adoption of TSTF-416 Low Pressure Coolant Injection (LPCI) Valve Alignment Verification Note Location ML23125A0612023-05-0808 May 2023 Proposed Alternative to the Requirements of the ASME Code ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23041A4262023-02-14014 February 2023 – Proposed Alternative to the Requirements of the ASME OM Code ML22347A2412023-02-0606 February 2023 Issuance of Amendment Nos. 294 and 290 Control Rod Scram Times (Public) - ML22332A5492022-12-21021 December 2022 Proposed Alternative to the Requirements of the ASME OM Code ML22298A0022022-12-15015 December 2022 – Issuance of Amendment Nos. 293 and 289 Transition to GNF3 Fuel (EPID L-2021-LLA-0159) (Public) ML22217A0442022-12-0707 December 2022 Issuance of Amendment Nos. 292 and 288 Control Rod Scram Times ML22308A1602022-12-0202 December 2022 – Issuance of Amendment Nos. 291 and 287 New Fuel Vault and Spent Fuel Storage Pool Criticality Methodologies ML22293B8052022-11-30030 November 2022 Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22311A0032022-11-0909 November 2022 – Proposed Alternative to the Requirements of the ASME OM Code ML22256A1152022-09-29029 September 2022 Proposed Alternative to the Requirements of the ASME OM Code ML22265A0862022-09-28028 September 2022 Proposed Alternative to the Requirements of the ASME OM Code ML22264A1752022-09-28028 September 2022 Proposed Alternative to the Requirements of the ASME OM Code ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22094A0012022-04-15015 April 2022 Constellation Energy Generation, LLC - Proposed Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles (Epids L-2021-LLR-0057 and L-2021-LLR-0058) ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21267A3172021-12-13013 December 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting (6th ISI Interval) (Epids L-2021-LLR 0029, 0030) ML21307A3422021-12-0707 December 2021 Issuance of Amendments to Adopt Reactor Pressure Vessel Water Inventory Control Enhancements (EPIDs L-2020-LLA-0253 and L-2020-LLA-0254) ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21166A1682021-06-25025 June 2021 ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML21005A0612021-01-14014 January 2021 Proposed Alternatives to Extend the Safety Relief Valve Testing Interval (EPID L-2020-LLR-0014 Through L-2020-LLR-0018) ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML20169A5842020-07-15015 July 2020 Relief from the Requirements of the ASME Code ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20150A3282020-06-26026 June 2020 Issuance of Amendment Nos. 281 and 277 to Increase Allowable Main Steam Isolation Leakage ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20094F8332020-04-0909 April 2020 Issuance of Amendment No. 276, Revise Technical Specification 3.6.1.3 Related to Increased Allowed Main Steam Isolation Valve Leakage (Emergency Circumstances) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML19301A3392019-12-0404 December 2019 Issuance of Amendments to Revise Technical Specification 2.1.1, Reactor Core Safety Limits, the Minimum Critical Power Ration Safety Limits ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19192A2442019-07-18018 July 2019 Proposed Alternative to Use ASME Code Cases N-878 and N-880 2024-09-30
[Table view] |
Text
August 7, 2023
Mr. David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 - ISSUANCE OF AMENDMENT NOS. 296 AND 292 RE: ADOPTION OF TSTF-416, LOW PRESSURE COOLANT INJECTION (LPCI) VALVE ALIGNMENT VERIFICATION NOTE LOCATION (EPID L-2023-LLA-0017)
Dear Mr. Rhoades:
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 296 to Renewed Facility Oper ating License No. DPR-29 and Amendment No. 292 to Renewed Facility Operating License No. DPR-30 for the Quad Cities Nuclear Power Station, Units 1 and 2, respectively. The amendments consist of changes to the technical specifications (TSs) in response to your application dated February 3, 2023.
The amendments adopt Technical Specifications Task Force (TSTF) Traveler 416 (TSTF-416),
Revision 0, Low Pressure Coolant Injection (LPCI) Valve Alignment Verification Note Location.
The adoption of TSTF-416 revises TS 3.5.1, ECCS [Emergency Core Cooling Systems]-
Operating, by moving the LPCI valve alignment note from Surveillance Requirement 3.5.1.2 to Limiting Condition for Operation 3.5.1.
D. Rhoades
A copy of the related safety evaluation is also enclosed. The Notice of Issuance will be included in the Commissions monthly Federal Register notice.
Sincerely,
/RA/
Robert Kuntz, Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Docket Nos. 50-254 and 50-265
Enclosures:
- 1. Amendment No. 296 to DPR-29
- 2. Amendment No. 292 to DPR-30
- 3. Safety Evaluation
cc: Listserv CONSTELLATION ENERGY GENERATION, LLC
AND
MIDAMERICAN ENERGY COMPANY
DOCKET NO. 50-254
QUAD CITIES NUCLEAR POWER STATION, UNIT 1
AMENDMENT TO RENEWED FACI LITY OPERATING LICENSE
Amendment No. 296 Renewed License No. DPR-29
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Constellation Energy Generation, LLC (the licensee) dated February 3, 2023, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I;
B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission;
C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations;
D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and
E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
Enclosure 1
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.B. of Renewed Facility Operating License No. DPR-29 is hereby amended to read as follows:
B. Technical Specifications
The Technical Specifications contained in Appendix A, as revised through Amendment No. 296, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 90 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Jeffrey Whited, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License and Technical Specifications
Date of Issuance: August 7, 2023
CONSTELLATION ENERGY GENERATION, LLC
AND
MIDAMERICAN ENERGY COMPANY
DOCKET NO. 50-265
QUAD CITIES NUCLEAR POWER STATION, UNIT 2
AMENDMENT TO RENEWED FACI LITY OPERATING LICENSE
Amendment No. 292 Renewed License No. DPR-30
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by the Constellation Energy Generation, LLC (the licensee) dated February 3, 2023, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I;
B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission;
C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations;
D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and
E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
Enclosure 2
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.B. of Renewed Facility Operating License No. DPR-30 is hereby amended to read as follows:
B. Technical Specifications
The Technical Specifications contained in Appendix A, as revised through Amendment No. 292, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 90 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Jeffery Whited, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License and Technical Specifications
Date of Issuance: August 7, 2023
ATTACHMENT TO LICENSE AMENDMENT NOS. 296 AND 292
RENEWED FACILITY OPERATING LICENSE NOS. DPR-29 AND DPR-30
QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2
DOCKET NOS. 50-254 AND 50-265
Replace the following pages of the Renewed Facility Operating Licenses and Appendix A, Technical Specifications, with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert
License No. DPR-29 License No. DPR-29 Page 4 Page 4
License No. DPR-30 License No. DPR-30 Page 4 Page 4
TSs TSs 3.5.1-1 3.5.1-1 3.5.1-2 3.5.1-2 3.5.1-3 3.5.1-3 3.5.1-4 3.5.1-4
B. Technical Specifications
The Technical Specifications contained in Appendix A, as revised through Amendment No. 296, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
C. The licensee shall maintain the commitments made in response to the March 14, 1983, NUREG-0737 Order, subject to the following provision:
The licensee may make changes to commitments made in response to the March 14, 1983, NUREG-0737 Order without prior approval of the Commission as long as the change would be permitted without NRC approval, pursuant to the requirements of 10 CFR 50.59. Consistent with this regulation, if the change results in an Unreviewed Safety Question, a license amendment shall be submitt ed to the NRC staff for review and approval prior to implementation of the change.
D. Equalizer Valve Restriction
Three of the four valves in the equalizer piping between the recirculation loops shall be closed at all times during reactor operation with one bypass valve open to allow for thermal expansion of water.
E. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined sets of plans 1, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: Quad Cities Nuclear Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 2, submitted by letter dated May 17, 2006.
Constellation Energy Generation, LLC shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The CSP was approved by License Amendment No. 249 as modified by License Amendment No. 259.
1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.
Renewed License No. DPR-29 Amendment No. 296
B. Technical Specifications
The Technical Specifications contained in Appendix A, as revised through Amendment No. 292, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.
C. The licensee shall maintain the commitments made in response to the March 14, 1983, NUREG-0737 Order, subject to the following provision:
The licensee may make changes to commitments made in response to the March 14, 1983, NUREG-0737 Order without prior approval of the Commission as long as the change would be permitted without NRC approval, pursuant to the requirements of 10 CFR 50.59. Consistent with this regulation, if the change results in an Unreviewed Safety Question, a license amendment shall be submitted to the NRC staff for review and approval prior to implementation of the change.
D. Equalizer Valve Restriction
Three of the four valves in the equalizer piping between the recirculation loops shall be closed at all times during reactor operation with one bypass valve open to allow for thermal expansion of water.
E. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans1, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: Quad Cities Nuclear Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 2, submitted by letter dated May 17, 2006.
Constellation Energy Generation, LLC shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The CSP was approved by License Amendment No. 244 and modified by License Amendment No. 254.
1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.
Renewed License No. DPR-30 Amendment No. 292 ECCSOperating 3.5.1
3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS), REACTOR PRESSURE VESSEL (RPV)
WATER INVENTORY CONTROL, AND REACTOR CORE ISOLATION COOLING (RCIC)
SYSTEM
3.5.1 ECCSOperating
Depressurization Sy
considered OPERABLE during alignment and operation for decay heat removal with Residual -
MODE 3, if capable of being manually realigned and not otherwise inoperable.
MODE MODES 2 and 3, except high pressure coolant injection (HPCI) 150 psig.
ACTIONS no applicable o HPCI.
CONDITION REQUIRED ACTION COMPLETION TIME
A.1 Resore LPCI pump o 30 ays ion (LPCI) pump inoperable.
B.1 Resore low pressure ECCS injecion/spray saus.
subsysem inoperable.
One LPCI pump in each C.1 Resore one LPCI pump subsysem inoperable. o OPERABLE saus.
(coninue)
Quad Cities 1 and 2 3.5.1-1 Amendment No. 296/292273/268 ECCSOperating 3.5.1
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME
D. Required Action and --------------NOTE-----------
associated Completion LCO 3.0.4.a is not applicable Time of Condition A, when entering MODE 3.
B, or C not met. -----------------------------
D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
E. Two LPCI subsystems E.1 Restore one LPCI 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable for reasons subsystem to OPERABLE other than Condition status.
C.
F. Required Action and F.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition E AND not met. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> F.2 Be in MODE 4.
G. HPCI System G.1 Verify by Immediately inoperable. administrative means RCIC System is OPERABLE.
AND
G.2 Restore HPCI System 14 days to OPERABLE status.
H. One ADS valve H.1 Restore ADS valve to 14 days inoperable. OPERABLE status.
I. Required Action and --------------NOTE-----------
associated Completion LCO 3.0.4.a is not applicable Time of Condition G or when entering MODE 3.
H not met. -----------------------------
I.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
(continued)
Quad Cities 1 and 2 3.5.1-2 Amendment No. 296/292245/240 ECCSOperating 3.5.1
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME
J. Two or more ADS valves J.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> inoperable.
AND
J.2 Reduce reactor steam 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> dome pressure to
< 150 psig.
K. Two or more low K.1 Enter LCO 3.0.3 Immediately pressure ECCS injection/spray subsystems inoperable for reasons other than Condition C or E.
OR
HPCI System and one or more ADS valves inoperable.
OR
One or more low pressure ECCS injection/spray subsystems inoperable and one or more ADS valves inoperable.
OR
HPCI System inoperable and either one low pressure ECCS injection/spray subsystem is inoperable or Condition C entered.
Quad Cities 1 and 2 3.5.1-3 Amendment No. 296/292245/240 ECCSOperating 3.5.1
SURVEILLANCE REQUIREMENTS
SURVEILLANCE FREQUENCY
SR 3.5.1.1 Verify, for each ECCS injection/spray In accordance subsystem, locations susceptible to gas with the accumulation are sufficiently filled with Surveillance water. Frequency Control Program
SR 3.5.1.2 -------------------NOTE-------------------
Not required to be met for system vent flow paths opened under administrative control.
Verify each ECCS injection/spray subsystem In accordance manual, power operated, and automatic valve with the in the flow path, that is not locked, Surveillance sealed, or otherwise secured in position, Frequency is in the correct position. Control Program
SR 3.5.1.3 Verify correct breaker alignment to the In accordance LPCI swing bus. with the Surveillance Frequency Control Program
SR 3.5.1.4 Verify each recirculation pump discharge In accordance valve cycles through one complete cycle of with the full travel or is de-energized in the INSERVICE closed position. TESTING PROGRAM
(continued)
Quad Cities 1 and 2 3.5.1-4 Amendment No. 296/292266/2615 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION
RELATED TO AMENDMENT NO. 296
TO RENEWED FACILITY OPERATING LICENSE NO. DPR-29 AND
AMENDMENT NO. 292 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-30
CONSTELLATION ENERGY GENERATION, LLC
AND
MIDAMERICAN ENERGY COMPANY
QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2
DOCKET NOS. 50-254 AND 50-265
1.0 INTRODUCTION
By letter to the U.S. Nuclear Regulatory Commission (NRC, the Commission) dated February 3, 2023 (Agencywide Documents A ccess and Management System Accession No. ML23034A219), Constellation Energy Generation, LLC (the licensee) submitted a license amendment request (LAR) to change the technical specifications (TSs) for the Quad Cities Nuclear Power Station, Units 1 and 2 (Quad Cities).
The proposed change would revise the emergency core cooling systems (ECCS) TSs based upon NRC-approved Technical Specifications Task Force (TSTF) Traveler TSTF-416, Revision 0, Low Pressure Coolant Injection (LPCI) Valve Alignment Verification Note Location (ML012390252), and the associated NRC staff safety evaluation (SE) (ML022240526).
2.0 REGULATORY EVALUATION
2.1 Description of Proposed Change
The LAR proposed to revise Quad Cities TS 3.5.1, ECCS-Operating, by moving the LPCI valve alignment note located in Surveillance Requir ement (SR) 3.5.1.2 to Limiting Condition for Operation (LCO) 3.5.1. The LPCI valve alignment note states:
Low pressure coolant injection (LPCI) subsystems may be considered OPERABLE during alignment and operation for decay heat removal with reactor steam dome pressure less than the Residual Heat Removal (RHR) cut in permissive pressure in MODE 3, if capable of being manually realigned and not otherwise inoperable.
Enclosure 3
2.2 Variations
The LAR identified one variation from TSTF-416. Section 3.0 of this SE provides a description of the variation and the NRC staffs evaluation.
2.3 Applicable Regulatory Requirements
Title 10 of the Code of Federal Regulations (10 CFR) section 50.36, Technical specifications, paragraph (c)(2), Limiting conditions for operati on, requires that TSs include LCOs. According to 10 CFR 50.36(c)(2)(i), LCOs are the lowest functional capability or performance levels of equipment required for safe operation of the facility. This regulation also requires that when an LCO of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the TSs until the LCO can be met.
The regulation at 10 CFR 50.36(c)(3), Surveillance requirements, requires that TSs include SRs and states that SRs are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the [LCOs] will be met.
2.4 Applicable Regulatory Guidance
The NRC staffs guidance for the review of TSs is in chapter 16.0, Technical Specifications, of NUREG-0800, Revision 3, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR [Light-Water Reactor] Edition (SRP), dated March 2010 (ML100351425). As described therein, as part of the regulatory standardization effort, the NRC staff has prepared standard technical specifications (STSs) for each of the LWR nuclear designs. Accordingly, the NRC staffs review includes consideration of whether the proposed changes are consistent with the applicable STSs, NUREG-1433, 1 as modified by NRC-approved travelers.
3.0 TECHNICAL EVALUATION
Traveler TSTF-416 revised STS 3.5.1, ECCS - Operating, by moving the LPCI valve alignment note for SR 3.5.1.2 to LCO 3.5.1.
The NRC staff compared the proposed TS change described in section 2.1 of this SE against the change in NRC-approved TSTF-416. In accordance with SRP chapter 16.0, the NRC staff determined that the change in NRC-approved TSTF-416 is applicable to the Quad Cities TSs because the Quad Cities units are boiling-water reactors (BWRs) and the NRC approved the TSTF-416 change for BWR designs. The NRC staff also determined that the proposed change to the Quad Cities TSs described in section 2.1 of this SE conforms to the change made to the STSs by NRC-approved TSTF-416.
In its SE for TSTF-416, the NRC staff concluded that the TSTF-416 change to STS 3.5.1 is acceptable because the SR 3.5.1.2 LPCI valve alignment note applies to all LPCI/RHR subsystem shared components; however, the note is located in the SRs that only address valve operability. The NRC staffs SE also stated that the preferred location for this note is in the LCO
1 U.S. Nuclear Regulatory Commission, Standard Technical Specifications, General Electric BWR/4 Plants, NUREG-1433, Volume 1, Specifications, and Volume 2, Bases, Revision 5.0, dated September 2021 (ML21272A357 and ML21272A358, respectively).
because the LCO applies to the components of the shared portions of the LPCI/RHR subsystem. TSTF-416 did not change the design or function of any safety-or nonsafety-related systems or components previously reviewed by the NRC staff and found acceptable. The NRC staffs SE for TSTF-416 concluded that moving the note is an administrative change.
Based on the above discussion, the NRC staff concludes that the proposed change to Quad Cities TS 3.5.1 to move the LPCI valve alignment note from the SR to the LCO is consistent with NRC-approved TSTF-416 and conforms to the applicable STS. The NRC staff also concludes that the proposed change clarifies the lowest functional capability or performance levels of equipment required for safe operation of the facility and continues to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the LCO will be met. Therefore, the NRC staff finds that the proposed change continues to meet the requirements of 10 CFR 50.36(c)(2) and 10 CFR 50.36(c)(3).
The LAR identified one variation from the NRC-approved TSTF-416. Specifically, TSTF-416 includes moving LPCI valve alignment notes located in SRs 3.5.1.2 and 3.5.2.4 to LCOs 3.5.1 and 3.5.2, respectively. However, the licensee has already incorporated the relocation of the SR 3.5.2.4 LPCI valve alignment note into TS 3.5.2 as part of Amendment Nos. 273 and 268 for Quad Cities, Units 1 and 2, respectively, related to the adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control (ML18353A229). As a result, the LAR only requested relocation of the LPCI valve alignment note from SR 3.5.1.2 to LCO 3.5.1. Based on the above discussion, the NRC staff concludes that this variation is acceptable because the TSTF-416 proposed changes to SR 3.5.2.4 and LCO 3.5.2 have already been incorporated.
4.0 STATE CONSULTATION
In accordance with the Commissions regulations, the Illinois State official was notified of the proposed issuance of the amendments on June 27, 2023. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments change requirements with respect to the installation or use of facility components located within the restricted area as defined in 10 CFR part 20 and change surveillance requirements. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (88 FR 31282; dated May 16, 2023). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: Clint Ashley, NRR
Date of Issuance: August 7, 2023
ML23178A074 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR//DSS/STSB/BC NAME RKuntz SRohrer VCusumano DATE 6/27/2023 6/28/23 4/26/2023 OFFICE OGC NLO NRR/DORL/LPL3/BC NRR/DORL/LPL3/PM NAME JWachuka JWhited RKuntz DATE 7/7/2023 8/7/2023 8/7/2023