ML24180A084

From kanterella
Revision as of 11:50, 4 October 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
American Centrifuge Operating, LLC – Inspection Schedule for Calendar Year 2025
ML24180A084
Person / Time
Site: 07007004
Issue date: 06/28/2024
From: Robert Williams
NRC/RGN-II/DFFI
To: Karen Fitch
American Centrifuge Operating
References
Download: ML24180A084 (3)


Text

Kelly L. Fitch Regulatory Manager American Centrifuge Operating, LLC 3930 U.S. Route 23 South P. O. Box 628 Mail Stop 7560 Piketon, OH 45661

SUBJECT:

AMERICAN CENTRIFUGE OPERATING, LLC - INSPECTION SCHEDULE FOR CALENDAR YEAR 2025

Dear Kelly Fitch:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at the American Centrifuge Operating, LLC facilities in calendar year 2025. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that any regional initiative or reactive inspections are not included in the schedule.

If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Leonard Pitts at (404) 997-4708 with any questions or concerns you may have regarding this letter or the inspection schedule.

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html, and at the NRC Public Document Room, in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Robert E. Williams, Jr., Chief Projects Branch 1 Division of Fuel Facility Inspection Docket No. 07007004 License No. SNM-2011

Enclosure:

As stated cc w/ encl: Distribution via LISTSERVJune 28, 2024 Signed by Williams, Robert on 06/28/24

ML24180A084 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available

OFFICE RII/DFFI RII/DFFI RII/DFFI

NAME L. Pitts T. Vukovinsky R. Williams DATE 6/28/2024 6/28/2024 6/28/2024

2025 U.S. NUCLEAR REGULATORY COMMISSION INSPECTION/ACTIVITY PLAN FOR American Centrifuge Operating, LLC

American Centrifuge Operating, LLC - Headquarters

Dates Number of Description/Inspection Procedures (IPs)

Inspectors 1 IP 81815, Access Authorization January 27 - 29 IP 81820, Information Security

American Centrifuge Operating, LLC - American Centrifuge Plant

Dates Number of Description/Inspection Procedures (IPs)

Inspectors February 3 - 7 1 Nuclear Criticality Safety 1 (IP 88015)

Transportation (IP 86740)

May 19 - 23 1 Operational Safety (IP 88020)

August 18 - 22 2 IP 81815, Access Authorization IP 81820, Information Security

September 29 - October 3 2 Plant Modifications - Annual (IP 88070)

Radiation Protection (IP 88030)

American Centrifuge Operating, LLC - Oak Ridge

Dates Number of Description/Inspection Procedures (IPs)

Inspectors 2 IP 81815, Access Authorization October 27 - 30 IP 81820, Information Security

Enclosure