MONTHYEARML23265A1502023-09-22022 September 2023 License Amendment Request – Revise a License Condition and Certain Technical Specifications to Remove Restrictions in Support of Decommissioning Activities Project stage: Request ML24088A3202024-03-28028 March 2024 Beyond 60 Years - Audit Plan Project stage: Other ML24088A3192024-03-28028 March 2024 Audit Plan Associated with Peach Bottom, Unit 1 - 10 CFR 50.82(a)(3) Alternate Decommissioning Schedule Project stage: Other ML24088A3182024-03-28028 March 2024 Audit Plan Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations (EPID L- 2023-LLN-0004) Project stage: Request ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations Project stage: Request ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years Project stage: Other ML24185A1772024-07-0303 July 2024 Request for Additional Information Project stage: RAI ML24185A1782024-07-0303 July 2024 NRC Email Response to Peach Bottoms Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations Project stage: Other ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations Project stage: Response to RAI 2024-05-13
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24185A1772024-07-0303 July 2024 Request for Additional Information IR 05000277/20244012023-10-0505 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000277/2024401 and 05000278/2024401 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC – Fleet Request – License Amendment Request to Adopt TSTF-580, Revision 1 ML22118A3312022-04-28028 April 2022 NRR E-mail Capture - Peach Bottom - Formal RAI for Proposed Alternative I5R-14, Revision 1 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 IR 05000277/20224032022-01-21021 January 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000277/2022403 and 05000278/2022403 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21035A2222021-02-0404 February 2021 Notification of Conduct of a Fire Protection Team Inspection ML21091A1782021-02-0202 February 2021 Ti 2515/194 Inspection Documentation Request ML21012A1302021-01-12012 January 2021 Request for Additional Information - TSTF-505 ML20357A0972020-12-21021 December 2020 Request for Additional Information - TSTF-505 ML20296A3342020-10-21021 October 2020 ISI Remote Inspection - Supplemental Request for Information ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20135H1972020-05-14014 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval ML20070R2282020-03-10010 March 2020 Request for Additional Information - RR ML19303D1662019-10-31031 October 2019 Requests for Additional Information for the Environmental Review of the Peach Bottom Subsequent License Renewal Application - Set 2 (EPID No. L-2018-RNW-0013)- RAIs ML19232A1752019-08-20020 August 2019 Request for Additional Information - TSTF-500 Implementation LAR ML19140A2832019-05-15015 May 2019 Email - Peach Bottom Atomic Power Station, Units 2 and 3 Second Round RAI Request - Set 1 ML19140A2822019-05-15015 May 2019 027 Pb FU RAI Subsequent to Clarification Call - Cu Greater than 15 Zn Holston (Jg) ML19253D2932019-05-0707 May 2019 002 Attachment 4D Confirmation Water Chemistry Chereskin Revised (002) ML19249C7252019-05-0303 May 2019 SLRA Requests for Additional Information - Set 2 May 3, 2019 ML19108A4282019-04-10010 April 2019 RAIs SLRA Set 1_ERO(Rev 1) ML19079A0232019-03-19019 March 2019 Licensed Operator Positive Fitness-For-Duty Test ML19058A2902019-02-27027 February 2019 Request for Additional Information - High Pressure Service Water One Time TS Change ML19037A4832019-02-0606 February 2019 NRR E-mail Capture - Clarification Questions Associated with Staff Assessment of Peach Bottom Seismic Probabilistic Risk Assessment Report Dated August 28, 2018 ML19028A0062019-01-25025 January 2019 Secondary Containment LAR Requests for Additional Information ML19017A0472019-01-16016 January 2019 Request for Additional Information - High Pressure Service Water One Time TS Change ML18348B0292018-12-13013 December 2018 Subsequent License Renewal Severe Accident Mitigation Alternatives Requests for Additional Information ML19010A3832018-12-0707 December 2018 Additional Documents Needed for Peach Bottom SLR Environmental Review ML18324A6742018-11-15015 November 2018 Request for Additional Information (FINAL)- LAR to Allow 2SRV/SVs OOS at High Pressure ML18312A4072018-11-0808 November 2018 Request for Additional Information (Public) - LAR to Allow 2SRV/SVs OOS at High Pressure ML18276A0202018-10-0202 October 2018 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan for Limerick and Peach Bottom ML18240A1742018-08-28028 August 2018 Request for Additional Information (Final) - Adopt TSTF-500 Battery TS Changes LAR ML18239A1322018-08-27027 August 2018 Request for Additional Information Final - Relief Request I5R-04 ML18228A6762018-08-14014 August 2018 Request for Additional Information - Adopt TSTF-500 Battery TS Changes LAR ML18226A2012018-08-14014 August 2018 Request for Additional Information - Relief Request I5R-05 ML18214A2812018-08-0202 August 2018 Request for Additional Information Draft - Relief Request I5R-02 ML18200A2742018-07-17017 July 2018 Request for Additional Information 2nd Round (Final) - Adopt 50.69 License Amendment ML18192A1192018-07-10010 July 2018 Request for Additional Information 2nd Round (Final) - Adopt 50.69 License Amendment ML18178A4772018-06-27027 June 2018 Request for Additional Information 2nd Round - Adopt 50.69 License Amendment ML18096B5062018-04-0606 April 2018 Request for Additional Information Exelon Generation Company, LLC Requested Amendment to Adopt 10 CFR 50.69 for Risk-informed Categorization and Treatment of Structures, Systems and Components ML18094B0832018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to P. Duke RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for Salem and Hope Creek, and Peach Bottom ISFSIs Docket Nos. 72-48 and 72-29) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17317B5502017-11-0909 November 2017 Licensed Operator Positive Fitness-For-Duty Test 2024-07-03
[Table view] |
Text
REQUEST FOR ADDITIONAL INFORMATION
OFFICE OF OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS
LICENSING REQUEST REGARDING DECOMMISSIONING BEYOND 60 YEARS
CONSTELLATION ENERGY GENERATION, LLC
PEACH BOTTOM ATOMIC POWER STATION, UNIT 1
DOCKET NO. 50-171
By letter dated October 20, 2023, (Agencywide Documents Access and Management System Accession No. ML23293A305), as supplemented by letter dated May 13, 2024 (ML24134A179),
Constellation Energy Generation, LLC (Constellation, the licensee) submitted a request for Peach Bottom Atomic Power Station, Unit 1 (Peach Bottom Unit 1). The proposed request would allow the completion of decommissioning for Peach Bottom Unit 1 beyond 60 years of permanent cessation of operations.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information submitted and determined that additional information is required to complete its review. The specific requests for additional information (RAIs) are listed below.
Requirement
The regulations in Title 10 of the Code of Federal Regulations (10 CFR 50.82 (a)(3) requires licensees to complete decommissioning within 60 years of permanent cessation of operations.
Completion of decommissioning beyond 60 years will be considered by the NRC in evaluating an alternative only when necessary to protect public health and safety. Factors that will be considered include unavailability of waste disposal capacity and other site-specific factors affecting the licensee's capability to carry out decommissioning, including presence of other nuclear facilities at the site.
RAI 1
In the supplement, the licensee indicated that Peach Bottom Unit 1 was not designed to support vessel flooding and requires a unique approach to be developed to accomplish dismantlement.
The staff notes that this position does not involve the presence of other nuclear facilities at the site. Explain why a delay is necessary to protect public health and safety given that the licensee has had since 1974 to plan decommissioning.
RAI 2
In the supplement, the licensee indicated that reasonable mitigation to protect public health and safety that would allow Peach Bottom Unit 1 to safely decommission using available conventional methods could not be identified. Provide a clear, concise justification that indicates how using available mitigation methods poses a significantly increased risk to public health and safety that would necessitate an alternative schedule because the licensee would not be able to maintain compliance with health, safety, and security regulations. Quantify the risks to the extent possible.
RAI 3
In the supplement, the licensee speculates that suitable decommissioning methods will be developed for High-Temperature Gas-Cooled Reactors (HTGRs) in the near future based on global decommissioning efforts but provides no reference to any studies, ongoing work, or agreements with other parties to include the issues at Peach Bottom Unit 1. Explain how Constellation is engaged with research on a global scale to establish suitable decommissioning methods for HTGRs. Provide references and contacts to the establishments and organizations that Constellation is working with on this effort.
RAI 4
In the1996 Decommission Cost Study for Peach Bottom Unit 1, the strategy was to remove the Unit 1 reactor internals by cutting a hole in the containment dome and removing the reactor and internals from the top using a crane. NRC assumes that radiological engineering and administrative controls would be used as needed. Why is the strategy proposed in 1996 not feasible?
RAI 5
If the Peach Bottom Unit 1 reactor cannot be decommissioned using DECON for unrestricted release, other decommissioning methods are available such as restricted release and entombment. Explain why other methods are not being considered.
RAI 6
If the licensee believes that the Peach Bottom Unit 1 reactor cannot be safely decommissioned, then explain why annual decommissioning cost estimates and the Generic Environmental Impact Statement for Decommissioning Reactors, NUREG-0586, Supplement 1 Volume 2 infer otherwise?