ML20054H057

From kanterella
Revision as of 10:15, 14 November 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards IE Insp Rept 50-395/82-26 on 820330-0402 & Notice of Deviation
ML20054H057
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/26/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20054H041 List:
References
NUDOCS 8206220531
Download: ML20054H057 (2)


See also: IR 05000395/1982026

Text

- - - - - -

. . .

.

.

.

.

.

(dw

APR 261982

South Carolina Electric and Gas Company

ATTN: Mr. T. C. Nichols, Jr. , Vice President

Power Production and System Operations

P. O. Box 764

Columbia, SC 29218

Gentlemen:

Subject: Report No. 50-395/82-26

This refers to the routine safety inspection conducted by Mr. W. H. Miller, Jr.,

of this office on March 30 - April 2,1982, of activities authorized by NRC

Construction Permit No. CPPR-94 for the V. C. Summer facility. Our preliminary

findings were discussed with Mr. W. A. Williams, Jr. , General Manager - Nuclear

Operations, at the conclusion of the inspection.

Areas examined during this inspection included fire protection / prevention.

Within these areas, the inspection consisted of selective examinations of pro-

cedures and representative records, interviews with personnel, and observations

by the inspector.

Within the scope of this inspection, no violations were disclosed.

During the inspection it was found that certain activities under your license

appeared to deviate from commitments to the Commission and have safety signi-

ficance. These items are identified in the Notice of Deviation enclosed herewith

as Appendix A. Please provide us in writing within 30 days of your receipt of

this letter your comments including a description of corrective actions that have

been or will be taken, corrective actions which will be taken to avoid further

deviations, and the date your corrective actions were or will be completed.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed report.

One new unresolved item is identified in the enclosed inspection report. This

item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter. Such application must be consistent with the requirements of

2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

8206220531 820611

PDR

G

ADOCK 05000395

PDR

-.

_ _ _ _ _ _ .

.

-

.

,

South Carolina Electric and 2 APR 2 61982

Gas Company

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

M

H. C. Dance, Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosures:

1. Appendix A, Notice of Deviation

2. Inspection Report No. 50-395/82-26

cc w/ encl:

J. B. Knotts, Jr.

O. S. Bradham, Station Manager

J. P. Harrison, Manager Nuclear

Security

C. A. Price, Manager, Nuclear

Engineering

A. A. Smith, Site QA Coordinator

bec w/ encl:

NRC Resident Inspector

Document Management Branch

State of South Carolina

R. L. Ferguson, CEB

Mail Stop P-302

RII RIIg RII g RII @ RI RII

WHMiller:ht TEConlon ARH r t J lshinski CEAlderson V lee HCDance

4/;)/82 4/g/82 4fp/82 4/g/82 4/g/82 4/ 82 4/d)J'82

,