MONTHYEARML24114A1732024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN011, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1762024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013. Rev. 4-CN003, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1782024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1792024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation, XX-E-013, Rev. 4-CN006, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1812024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN010, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1822024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN009, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1842024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN004, Post-Fire Shutdown (PFSSD) Analysis ML24114A1872024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN008, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1902024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN012, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1922024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN002, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A1952023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN006, Post-Fire Safe Shutdown (PFSSD) Analysis WO 23-0006, Calculation XX-E-013, Rev 4, CN005, Post-Fire Safe Shutdown (PFSSD) Analysis2023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN005, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A2062023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN004, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A2032023-05-0808 May 2023 Calculation XX-E-013, Rev. 4, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A2022023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN007, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A2002023-05-0808 May 2023 Calculation XX-E-013, Rev. 4, CN002, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A1982023-05-0808 May 2023 Calculation XX-E-013, Rev. 4, CN008, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A1972023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN009, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A1942023-05-0808 May 2023 Calculation XX-E-013 Rev. 4, CN003, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A2032022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN005, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A1922022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN003, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A1962022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN007, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A1972022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN008, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A1982022-05-18018 May 2022 Calculation No. XX-E-013, Revision 4, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A2012022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN004, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A2062022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN006, Post-Fire Safe Shutdown (PFSSD) Analysis WO 22-0006, Ccn No. XX-E-013, Revision 4, Sequence No. CN002, Post-Fire Safe Shutdown (PFSSD) Analysis2022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN002, Post-Fire Safe Shutdown (PFSSD) Analysis ML21168A1562021-06-0707 June 2021 4 to Updated Safety Analysis Report, E-013, Rev 4_CN008, Post-Fire Safe Shutdown (PFSSD) Analysis ML20290A6132020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Calculation XX-E013, Rev. 4, Post-Fire Safe Shutdown (PFSSD) Analysis ML20290A6142020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Calculation Change Notice XX-E013, Rev. 4, Seq. CN002, Post-Fire Safe Shutdown (PFSSD) Analysis ML20290A6162020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Calculation Change Notice XX-E013, Rev. 4, Seq. CN003, Post-Fire Safe Shutdown (PFSSD) Analysis ML20290A6172020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Calculation Change Notice XX-E013, Rev 4, Seq. CN004, Post-Fire Safe Shutdown (PFSSD) Analysis ML20290A6182020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Calculation Change Notice XX-E013, Rev 4, Seq. CN005, Post-Fire Safe Shutdown (PFSSD) Analysis ML18121A1372018-04-25025 April 2018 Procedure, AP 078-004, Revision 21, Offsite Dose Calculation Manual (Radiological Environmental Monitoring Program). ML18121A1362018-04-25025 April 2018 Procedure, AP 078-003, Revision 8, Offsite Dose Calculation Manual. ML18093B0102018-03-0808 March 2018 Revision 31 to Updated Safety Analysis Report, Post-Fire Safe Shutdown (Pfssd) Analysis, XX-E-013, Rev 4, Sequence CN004 ML18093B0082018-03-0808 March 2018 Revision 31 to Updated Safety Analysis Report, Post-Fire Safe Shutdown (Pfssd) Analysis, XX-E-013, Rev 4, Sequence CN003 ML18093B0042018-03-0808 March 2018 Revision 31 to Updated Safety Analysis Report, Post-Fire Safe Shutdown (Pfssd) Analysis, XX-E-013, Rev 4 ML18093B0062018-03-0808 March 2018 Revision 31 to Updated Safety Analysis Report, Post-Fire Safe Shutdown (Pfssd) Analysis, XX-E-013, Rev 4, Sequence CN002 ML17151B0412015-10-22022 October 2015 Calculation Change Notice XX-E-013-004-CN002, Rev 4, Post-Fire Safe Shutdown Analysis ML17151B0422015-10-22022 October 2015 Calculation Change Notice XX-E-013, Rev 4, CN003, Post-Fire Safe Shutdown Analysis ML17151B0402015-10-22022 October 2015 Calculation No. XX-E-013, Rev 4, Post-Fire Safe Shutdown Analysis ET 13-0035, Fire Protection Program Re Alternative Shutdown Capability2013-11-21021 November 2013 Fire Protection Program Re Alternative Shutdown Capability ML12129A3852011-08-31031 August 2011 Enclosure I, Wolf Creek Nuclear Operating Corporation Administrative Procedure AP 07B-003, Revision 7, Offsite Dose Calculation Manual. ML12129A3862011-06-22022 June 2011 Enclosure II, Wolf Creek Nuclear Operating Corporation Administrative Procedure AP 07B-004, Revision 18, Offsite Dose Calculation Manual (Radiological Environmental Monitoring Program). ML0712700402007-04-27027 April 2007 Administrative Procedure AP 07B-003, Revision 6, Offsite Dose Calculation Manual. ML0512403512005-04-29029 April 2005 Attachment II, Wolf Creek Generating Station, Administrative Procedure AP 07B-004, Revision 8, Offsite Dose Calculation Manual (Radiological Environmental Monitoring Program). ML0512403482004-09-29029 September 2004 Attachment I, Wolf Creek Generating Station, Administrative Procedure AP 07B-003, Revision 5, Offsite Dose Calculation Manual. ML0429500902004-09-29029 September 2004 Attachment I, Administrative Procedure AP 07B-003, Revision 5, Offsite Dose Calculation Manual. ML0429500942003-05-22022 May 2003 Attachment II, Administrative Procedure AP 07B-004, Revision 5, Offsite Dose Calculation Manual (Radiological Environmental Monitoring Program). 2024-04-15
[Table view] Category:Fire Protection Plan
MONTHYEARML24114A1592024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configurations, Rev. 4 ML24114A1602024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Revision W01, Attachment C Through G3C, Fire Protection Evaluations for Unique or Unbounded Fire Wrap Configurations ML24114A1612024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Revision W08, Appendix G3D to H, Structural Steel Fireproofing Data ML24114A1622024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Attachment B7 Through B13, Fire Protection Evaluation for Penetrant Size Exceeding Typical Detail B-1 Limitation ML24114A1722024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9905, Rev. 13, Fire Hazard Analysis ML24114A1742024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Drawing E-1F9900, Rev. 10, Post-Fire Safe Shutdown Operator Manual Actions ML24114A1752024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9910, Rev. 18, Post-Fire Safe Shutdown Area Analysis ML24114A1772024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9915, Rev. 16, Design Basis Document for Ofn RP-017, Control Room Evaluation ML24114A1832024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9905, Rev. 14, Fire Hazard Analysis ML24114A1852024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9905, Rev. 12, Fire Hazard Analysis ML24114A1912024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9910, Rev. 19, Post-Fire Safe Shutdown Area Analysis ML23135A1872023-05-0808 May 2023 Report M-6630-00017A, Revision W08, Fire Protection Evaluation for Unique or Unbounded Fire Barrier Configurations ML23135A1882023-05-0808 May 2023 Report, M-6630-00017A, Revision W08, Fire Protection Evaluation for Unique or Unbounded Fire Wrap Configurations, Attachments C to G3C ML23135A1892023-05-0808 May 2023 Report, M-6630-00017A, Revision W08, Structural Steel Fireproofing Data ML23135A1902023-05-0808 May 2023 Report, M-6630-00017A, Revision W08, Fire Protection Evaluation for Penetrant Size Exceeding Typical Detail FB-1 Limitation ML23135A1922023-05-0808 May 2023 Report, E-1F9910 Rev 17, Post-Fire Shutdown Operator Manual Actions ML23135A1942023-05-0808 May 2023 Calculation XX-E-013 Rev. 4, CN003, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A1952023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN006, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A1962023-05-0808 May 2023 Report, E-1F9900 Rev 10, Redacted, Post-Fire Shutdown Operator Manual Actions ML23135A1972023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN009, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A1982023-05-0808 May 2023 Calculation XX-E-013, Rev. 4, CN008, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A1992023-05-0808 May 2023 Fire Hazard Analysis Report, E-1F9905 Rev 11, Post-Fire Shutdown Operator Manual Actions ML23135A2002023-05-0808 May 2023 Calculation XX-E-013, Rev. 4, CN002, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A2022023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN007, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A2032023-05-0808 May 2023 Calculation XX-E-013, Rev. 4, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A2062023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN004, Post-Fire Safe Shutdown (PFSSD) Analysis WO 23-0006, Calculation XX-E-013, Rev 4, CN005, Post-Fire Safe Shutdown (PFSSD) Analysis2023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN005, Post-Fire Safe Shutdown (PFSSD) Analysis ET 23-0004, Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements2023-01-26026 January 2023 Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23135A2042022-11-0909 November 2022 E-1F9915, Rev. 16, Design Basis Document for Ofn RP-017, Control Room Evacuation ML22152A1812022-05-18018 May 2022 M-6630-00017A, Revision W08, Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configurations, Cover Through Appendix B6 ML22152A1822022-05-18018 May 2022 M-6630-00017A, Attachments C to Appendix G3C, Fire Protection Evaluations for Unique or Unbounded Fire Wrap Configurations ML22152A1832022-05-18018 May 2022 M-6630-00017A, Appendix G3D to Attachment H, Structural Steel Fireproofing Data, Page G3D-1 of G3D-50 to G5A-63 of G5A-63 ML22152A1852022-05-18018 May 2022 M-6630-00017A, Revision W08, Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configurations, Appendices B7 Though B13 ML22152A1922022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN003, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A1932022-05-18018 May 2022 E-1F9905, Revision 11, Fire Hazard Analysis ML22152A1962022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN007, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A1972022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN008, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A1982022-05-18018 May 2022 Calculation No. XX-E-013, Revision 4, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A2002022-05-18018 May 2022 E-1F9915, Revision 15, Design Basis Document for Ofn RP-017, Control Room Evacuation ML22152A2012022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN004, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A2022022-05-18018 May 2022 E-IF9900, Post-Fire Safe Shutdown Operator Manual Actions, Rev. 10 ML22152A2032022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN005, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A2062022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN006, Post-Fire Safe Shutdown (PFSSD) Analysis WO 22-0006, Ccn No. XX-E-013, Revision 4, Sequence No. CN002, Post-Fire Safe Shutdown (PFSSD) Analysis2022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN002, Post-Fire Safe Shutdown (PFSSD) Analysis ML21168A1592021-06-0707 June 2021 Fire Hazards Analysis, XX-E013, Rev 4, Post-Fire Safe Shutdown (PFSSD) Analysis ML21168A1532021-06-0707 June 2021 Fire Hazards Analysis E-1F9900, Rev 9 - Redacted, Post Fire Safe Shutdown Operator Manual Actions ML21168A1542021-06-0707 June 2021 XX-E013,Rev 4, CN002, Post-Fire Safe Shutdown (PFSSD) Analysis ML21168A1552021-06-0707 June 2021 XX-E-013, Rev 4, CN007, Post-Fire Safe Shutdown (PFSSD) Analysis ML21168A1612021-06-0707 June 2021 Fire Hazards Analysis, XX-E013, Rev 4, CN003, Post-Fire Safe Shutdown (PFSSD) Analysis ML21168A1622021-06-0707 June 2021 Fire Hazards Analysis, XX-E-013, Rev 4_CN006, Post-Fire Safe Shutdown (PFSSD) Analysis 2024-04-15
[Table view] |
Text
FORM APF-05D-001 -0'-* REV 10 Page 1 o,t;o;z._
CALCULATION CHANGE NOTICE CCN NO. XX - E-013 - .~ - *-eN00 ~
/Oft Base Ca.le No . Rev No . Sequence No.
CALCULATION TITLE - Enter this item in CALCULATION TITLE field in EIS :
Post-Fire Safe Shutdown (PFSSD) Analysis COMPUTER CODE: N/A VERSION: N/A Administrative?
I 0 YES [8) NO I
ASSOCIATED CHANGE
- = I DCP 14209 ON/A - only i f Administrative REGULATORY REVIEWS: Attached DCP 14209 Evaluation#
[8l Attached to:
USAR STATEMENT : Requires a change to the USAR:
t8:l Does not require a change to the USAR ANY DOCUMENTS YES If yes, Condition Report#
IMPACTED?
t8:l NO I Status: ~ CGMWI!r'T'~ Q ~ FINAL 0 VOID 0 SUPERSEDED f.8, fiil If DigsigOrg 2. 8, o.7
/0/2-1/!S' BFiaR ~1.>x i{/,/(41.,pt /4. Wi'Lh11.,s_
ORIG Printed Name ll ,ql,*~ (H'3-Date ORIG Printed Name d(/J- Date
/2)o.:., ~- i¥-~G4_b Signature Signature ES9280479 QUALIFICATION REQUIRED: ES9280479 QUALIFICATION REQUIRED:
DigsigVer 2.8, 0.7 I r;/,"t.czjJ 5
~~
VERF ~- VERF ' {JName /J;f/M//f?altl!J
~
Date Date 4 / 2 ¥ ( t
~
Signature Signature ES9280479 QUALIFICATION REQUIRED: ES9280479 QUALIFICATION REQUIRED: I I\
APP DigsigApp 2.8, 0.7
.Jeff SYtlir Printed Name
.seff 5'""-i-e6 10/,:z,/ ~.:>Jf' 691'2::t2GB APP r/2.v___ v ~, J
- / /' f
__,.£,_/_/ ) - , - / - _
.././../ )\~
Date Prirt7;1~
Signature v~ l__J Date ~ l a 4 ~
Signature / / /
~\\\\\llllll/lll/lf//lJ/
~~,,~ NR lft11l
~
- ~~~------:to~
.* ,cENss: *- ~
Digitally signed f ,6;2~\ by Brian R Fox
~
\ ~~. /ff_J 2013.09.25
' i-~*'?:!-=~F:.~--
~41 1, IONAL ~,,,,,,~
-&'l 18:27:31 -05'00' 11
"1r1111111111111111111\
RPE Certification (For ASME Section Ill Stress Reports/Design Reports, refer to AP 05D-001 for qualification requirements)
FORM APF-05D 001 -02 REV 10 Page 2 CALCULATION CHANGE NOTICE CCN NO. XX-E-013 -~r - doD2-.
~ i Base Cale No. Rev No. Sequence No.
CALCULATION SUBJECT (Statement Of Problem) - Enter this in SUBJECT field in EIS:
DCP 14209 removes the HMCP breakers from MCC cubicles NG03DBF6 and NG04DBF6, which were added as PFSSD components in CCN XX-E-013-003-CN004 per DCP 13800. These breaker cubicles provide power and control functions for Train A and B Emergency Diesel Generator Room supply fan motors DCGM01A and DCGM01 B, respectively. Due to breaker coordination issues, DCP 14209 will modify the power supply to supply 480 VAC power to the diesel generator room supply fan motors DCGM01A and DCGM01 B directly from new Load Center breakers NG0308 and NG0408, respectively. Breakers NG0308 and NG0408 will supply power to the fan control functions within NG03DBF6 and NG04DBF6, respectively. Therefore, MCC cubicles NG03DBF6 and NG04DBF6 will remain as PFSSD components.
FORM APF-05D-001-02 REV 10 Page 3
~
C,M:l:?2._
CALCULATION DATABASE INPUT CCN NO. XX-E-01 3 - - , C~ OOli ~
Base Cal e No . Sequence No . /~~
Rev No .
Link systems to the calculation/CCN in EIS .
Systems NG Affected:
Develop relationships between interdependent calculations in EIS .
Additional Calculations None Providing Input to this calculation:
Additional Calculations None Impacted by this calculation:
Develop relationships between t he calculation/CCN and controlled reference documents in EIS .
Additional Controlled None Documents Inputs to this calculation:
Additional Controlled None Documents Impacted by this calculation:
The reference documents listed below are those that cannot be l i nked to t he calculation/CCN and shall be entered in the INDUSTRY REFERENCE field in EIS , e . g . ' ASME Codes , ANSI Standards , letters , etc.
Add i t ional Other DCP 14209 , Rev . 0 Reference Documents:
Li nk components to the cal culation/CCN i n EIS .
Additio nal Components: None REFER TO DESKTOP GUIDE FOR PROCESSING CALCULATIONS IN EIS
FORM APF-05D-001-0?- , REV 10 Page 4 LIST OF EFFECTIVE PAGES <fol ~2... ,.,,,,.,,,,,n, CCN NO. XX- E- 013 - - iiQ91i *y Base Cale No . Rev No . Sequence No.
IOft/t_
CCN Cale. CCN Cale . CCN Cale. CCN Cale.
Page No. Page Page Page Page Page Page Page Affected No. Affected No . Affected No. Affected DVR/SCRN/ /DVR/SCRN /DVR/SCRN /DVR/ SCRN Other /Other /Other /Other 1 N/A 2 N/A 3 N/A 4 N/A 5 N/A 6 App . 3 ,
pgs 62 ,
86 , 87 ,
88 a nd 90 DVR DVR Design Verification Report (if applicable)
SCRN Regulatory Screening (if applicable)
AD Applicability Determination
FORM APF. 05D. 001. 02 REV 10 Page 5 W-1 OV,::;ul_
~
CALCULATION SHEET CCN NO. XX-E-013 - ~ - ,6H885
.A Base Cale . No . Rev . No . Sequence No Changes to XX-E-013 are described in the following pages.
The Calculation Main Body is not affected by this change.
Appendix 1 is not affected by this change.
Appendix 2 is not affected by this change.
Changes to Appendix 3 are shown on the following pages.
Appendix 4 is not affected by this change.
Attachment 1 is not affected by this change.
r~,~ IJ~(
~£'2-i t s not affected by this change.
1 ,Anaet:u:;:iei:it .J...is not affected by this change.
FORM APF-050-001-02_,_REV. 10 Page 61 CALCULATION SHEET CCN NO. _ _ _XX ..:..:..:...-....:::...~.::._
E - 013 _ _ - OY( -
--9-e da:.l2-.
H095 ~
-',t/f2-Y/S Base Cale . No . Re v . No . Sequence No Revise Appendix 3 as follows (Changes shown in boldface). Also refer to CCN XX-E-013-003-CN004.
R System Component Fire Instrument SSD Sprtd Hot Cold Normal Alt Schematic I SIG Description Room P&ID Other Drawings Power Source Notes E ID ID Area Location Fun Fun Stdby Shdwn Shdwn Shdwn One Line V
GM DCGM01A 1 Train A Diesel Generator 5203 D-1 --- s R,M, H X X X --- M-12GM01 E-13GM01 --- NG0308 --- 3 Ventilation Supply Fan NG03G8J:6 GM DCGM01B 4 Train B Diesel Generator 5201 D-2 --* s R, M, H X X X X M-12GM01 E-13GM01A --* NG0408 --- 3 Ventilation Supply Fan NG04Q8~6 GM GMHIS0001A 1 Train A Diesel Generator 3601 C-27 RL020 s R, M, H X X X -- M-12GM01 E-13GM01 --- NG0308 *-* 3 Ventilation Supply Fan HIS NG03DBF6 GM GMHIS0011A 4 Train B Diesel Generator 3601 C-27 RL020 s R,M, H X X X X M-12GM01 E-13GM01A --- NG0408 --- 3 Ventilation Supply Fan HIS NG04DBF6 GM GMHS00118 4 Train B Diesel Generator 5201 D-2 -- s R,M, H --- --- --- X M-12GM01 E-13GM01A --- NG0408 --- 3 Room Supply Fan HS NG04DBF6 NG NG0308 1 Train A Diesel Generator 3301 C-9 -*- s R,M, H X X X X M-12GM01 E-11NG01 --- NG03 ... 3 Room Ventilation Supply E-13NG01A Fan (DCGM01 A)
NG NG0408 4 Train B Diesel Generator 3302 C-10 ... s R, M, H X X X X M-12GM01 E-11NG02 --- NG03 ... 3 Room Ventilation Supply E-13NG01A Fan (DCGM01 B)
NG NG03DBF6 1 Train A Diesel Generator 5203 D-1 -- s R,M,H X X X -- *-- E-13GM01 --- NG0308 --- 3 Ventilation Supply Fan E-11NG20 NG NG04DBF6 4 Train B Diesel Generator 5201 D-2 --- s R,M,H X X X X --- E-13GM01A --- NG0408 --- 3 Ventilation Supply Fan
FORM APF 05F-001 -01 , REV. 04 PAGE I OF 5
- CA):XY.l._
DESIGN VERIFICATIO N REPORT DOCUMENT NO. XX-E-013-00J ~ $/"~>> REV. NIA DOCUMENT TITLE: Post-Fire Safe Shutdown (PFSSD) Analysis ORIGINATOR: Brian R. Fox
.DESIGN VERIFIED.: SAFETY CLASSIFICATION.: .VERIFICATION METHOD.:
PRELIMINARY SAFETY-RE LATED ~ DESIGN REVIEW
~ FINAL ~ SPECIAL SCOPE ALTERNATE CALCULATION REVISION NON-SAFETY RELATED TESTING
~ INDIVIDUAL VERIFICATION SIGNATURE: DATE: 9/24/13 QUALIFICATION
~~MttJ REQUIRED---
ES9280465 OR ES9280479 TEAM VERIFICATION SIGNATURE: DATE:
Scooe Verified:
TEAM LEADER SIGNATURE: DATE:
QUALIFICATION REQUIRED ES9280465 OR ES9280479
- Team leader signature certifies that adequate interfaces and overlaps have occurred.
OVERVIEW (PURPOSE AND SCOPE):
The purpose of this CCN is to incorporate the changes to the PFSSD Analysis due to relocating the Train A and B Emergency Diesel Generator Room supply fan power supplies from MCC cubicles NG03DBF6 and NG04BF6 to Load Center Breakers NG0308 and NG0408, respectively.
CRUCIAL AREAS:
- 1. Ensure the Database Input sheet is complete and accurate.
- 2. Ensure all changes shown in Appendix 3 are complete and accurate.
- 3. Determine whether any changes , in addition to Appendix 3, should be made.
ALTERNATE OR INDEPENDENT ITEMS USED FOR VERIFICATION:
- 1. CCN XX-E-013-003-CN004
FORM APF 0SF-001-01, REV. 04 PAGE 2 OF 5 a -c,M:X12...
DESIGN VERIFICATION REPORT DOCUMENT NO. XX-E-013-903 CJ!t+-0~4""LJaf~ REV. NIA COMMENTS: ORIGINATOR'S RESPONSE:
- 1. p2: A superseded CCN should not be the sole 1. Replaced CCN XX-E-013-002-CN014 with CCN reference in line 2 of the Statement of Problem. XX-E-013-003-CN004.
Suggest that the ending of the first sentence be revised to read as follows: " ... PFSSD components in CCN XX-E-013-002-CN014 (subsequently superseded by CCN XX-E-013-003-CN004) per DCP 13800".
- 2. p3: DCP 14209 should be added to the "Additional 2. DCP 14209 added.
Other Reference Documents" section.
- 3. p4: It is not clear why the affected pages of Append ix 3 3. Changed the affected pages to 62, 86, 87, 88 and are shown as being 61, 85, 86 and 89. It seems that 90.
the actual affected pages would be 62, 86, 87, 88, 90.
- 4. p5: It is generally an error trap to repeat detailed 4. Deleted the 1.st. paragraph.
information in different areas. Suggest that the first paragraph be deleted as it is an exact duplication of what has already been stated in the Calculation Subject.
- 5. p6: Suggest that the first line above the table be 5. Changed to reference only the current CCN.
revised to not only reference the superseded CCN, but also reference the current superseding CCN .
- 6. Final thought: CN005 to XX-E-013 Rev. 3 appears to 6. It is not the intent to revise portions of CN004 with revise portions of CN004 to XX-E-013 Rev. 3. The CN005. CN005 uses the current information in calculation procedure does not allow CCNs to be the parent calculation plus outstanding CCNs, revised, only superseded. Explain how or why this is which are required to be considered when acceptable. preparing a new CCN. Both CCNs need to be worked together when revising the parent calculation following implementation in MC20 .
CONCLUSIONS:
The changes accomplished by CCN XX-E-013-003-CN005 are complete and accurate.
FORM APF 05F-001-0l , REV. 04 PAGE 3 OF 5 00'1- C,,/VCJO:ii--
DESIGN VERIFICATION REPORT DOCUMENT NO. XX-E-013-003 EP.1669 4#1/tJ/z..y/S- REV. N/A TABLE A (This table is required for change packages, or when required by a Supervisor.) If the answer to the question is yes, then provide a descriptive answer that explains why you came to this conclusion. If the question is not aoolicable, then provide a descriptive explanation detailing why it is not applicable.
- 1. Were the design inputs correctly selected and incorporated into the design?
- 2. Are assumptions, necessary to perform the design activity ,
documented, adequately described and reasonable?
- 3. Are the appropriate quality and quality assurance requirements specified?
- 4. Are the applicable codes, standards and regulatory requirements , including issue and addenda , properly identified and are their requirements for design met?
- 5. Has applicable plant and industry construction and operating experience been considered?
- 6. Have the hardware interface design requirements been satisfied?
- 7. Is the output reasonable compared to input?
- 8. Are the specified parts , equipment and processes suitable for the required application?
- 9. Are the specified materials compatible with each other and the design environmental conditions to which the material will be exposed?
FORM APF 05F-001-0l , REV 04 PAGE40F5 DESIGN VERIFICATION REPORT DOCUMENT NO. XX-E-013-093 EN995-d"°JW'./~/..S REV. NIA TABLE A (This table is required for change packages, or when required by a Supervisor.) If the answer to the question is yes, then provide a descriptive answer that explains why you came to this conclusion. If the question is not aoolicable, then orovide a descriptive explanation detailing why it is not aoolicable.
- 10. Have adequate maintenance features and requirements been specified?
- 11. Are accessibility and other design provisions adequate for per formance of needed maintenance and repair?
12 . Has adequate accessibility been provided to perform the in-service inspection expected to be required d uri ng the plant life?
- 13. Has the d es ign properly considered radiation exposure to the public and plant personnel?
- 14. Have adequate pre - operationa l and subsequent periodic test requirements been appropriately specified?
15 . Does each document contain th e required signatures and date?
16 . If a computer program was us e d in the analysis , has the program been verified?
17 . If a component has been added , has a Safety Classification Analysis been completed?
- 18. Were the commitments provided in the USAR and the Design Criteria documents correctly incorporat ed into the design documents?
FORM APF 0SF-001-01, REV. 04 PAGE 50F5 3/-CA/61::7.2-.
DESIGN VERIFICATION REPORT DOCUMENT NO . XX-E-013-903 1'66, ~R~ REV. NIA TABLE A (This table is required for change packages, or when required by a Supervisor.) If the answer to the question is yes, then provide a descriptive answer that explains why you came to this conclusion. If the question is not a licable, then rovide a descri tive ex lanation detailin wh it is not a licable.
- 19. Have the appropriate design documents been identified and/or updated?
20 . Has warehouse stock been considered for modifi cation or retirement?