W3P88-0028, Monthly Operating Rept for Jan 1988
| ML20196D837 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 01/31/1988 |
| From: | Burski R, Geoffrey Miller LOUISIANA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| W3P88-0028, W3P88-28, NUDOCS 8802180198 | |
| Download: ML20196D837 (7) | |
Text
. _ _ _ _ - - - _ _ _ _ __ __ . _ _ - _ - _
~
e
.NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS
'dATERFORD 3 JANUAkY 1988 The unit started the month in a shutdown initiated in December 1987 and experienced one additional shutdown during the month.
i
$$Y
,,,,gesu w; c y _ ,,_ . '/
7, ' 6 '; ..g
/ m
/ 'v.
0802180198 800131 h
[ PDR E
Q_
ADOCK 05000302 DCD y*/
t t 4o PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES k'ATERFORD 3 During the month of January 1988, there were no pressurizer safety valve failures or challenges.
a N
r r
P-a I
_ _ _ . . - . - - g - -- ,- .
t
~
OPERATING DATA REPORT f
UNIT NAME: WATERFORD 3 CITY / STATE: KILLONA/LA DATE: FEBRUARY 1988 OPERATING STATUS. i
- 1. Docket: 50-382 _ g,t,,
- 2. Reportina Period: _ January 1988
- 3. Utility
Contact:
GEORGE MILLER i Phone Number: (504) 467-8211
- 4. Licensed Thermal Power (MWt): 3390
- 5. Nameplate Rating (Gross Mwe): 1153 1
- 6. Design Electrical Rating (Net MWe): 1104 i t
- 7. Maximum Dependable Capacity (Gross MWe): 1120 !
1
- 8. Maximum Dependable Capacity (Net MWe): 1075
- 9. If Changes Occur in Capacity Ratint,s (Items Number 4 Throu8h 8) Since Last Report, l 1
Give Reasons: !
4
- 10. Power Level To WMch Restricted, if Any (Net MWe): NONE i
- 11. Reasons For Restrictions, If Any: N/A i r
1 This Month Yr.-to-Date Cumulative *
- 12. Hours In Reporting r riod 744.0 744.0 20641.0
- 13. Number Of Hours ".er ,.or Was Critical 689.8 689.8 16794.4 i 14. Reactor Reser,e S' down Hours f 15 Hours Generator P.-Line 645.2 6A5.2 16459.6 !
I
- 16. Unit Reserve 3 %tdown Hours !
[
i
ag
- i OPERATING DATA REPORT -
I (Continued)
I This Month Yr.-to-Date Cumulative r
17 Gross Thermal Energy 2,143,917 2,143,917 53,604.889 Generated (MWH) ;
l 18. Gross Electrical Energy 723,320 723,320 18,104,130 ;
Generated (MWH) ,
- 19. Net Electrical Energy 690,008 690,008 17,214,477 Generated (MWH) -
- 20. Unit Service Tactor 86.7 86.7 __
79.7 !
I !
t
- 21. Unit Availability Tactor 86.7 ,86.7 79.7 l
- 22. Unit Capacity Tactor 86.3 86.3 77.6 f (Using MDC Net)
- 23. Unit Capacity Tactor 84.0 84.0 75.5 f l (Using DER Net) ;
- 24. Unit Forced Outage Rate 7.9 7.9 7.8
- 25. Unit Forced Outage Hours 55.6 55.6 1391.9 Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each): '
26.
Refueling / Maintenance Outage. 4/2/88. 60 days !
i l
- 27. If Shut Down At End of Report Period Estimated Date of Startupt
- 28. Units In Teat Status (Prior to Commercial Operation): :
?
I Torecast Achieved j t
INITIAL CRITICALITY 3/4/85 t INITIAL ELECTRICITY 3/18/85 f COMMERCIAL OPERATION 9/24/85 I i
_I
i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-382 UNIT WATERFORD 3 .
DATE FEBRUARY 1988 COMPLETED BY GEORGE MILLER TELEPHONE 504-467-8211 MONTH JANUARY 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 -43 17 1106 2 34 18 1105 3 899 19 1102 4 1099 20 1105 5 1104 21 1103-6 1106 22 1105 i 7 _
-1106 23 1106
)
8 1105 24 1105 9 1105 25 1105 10 1105 26 455 11 1104 -40 27 12 1104 28 63 13 1105 29 880 14 1105 30 1101 15 1105 31 1104 16 1105 l INSTRUCTIONS On this format, list the average daily unit power level in K4e-Net for each day in the reporting month. Compute to the nearest whole megawatt.
l l
1
UNIT SHUTDOWNS AND POWER REDUCTIONS ,
REPORT FR JANUARY 1988 .
DOCKET NO 50-382 -
UNIT NAME' WATERFORD 3 -
DATE FEBRUARY 1988 COMPLETED BY- GEORGE MILLER TELEPHONE 504-467-8211 Method of Licensee .Cause & Corrective Duration Shutting Event System Component Action to.
Na. Date Type l (HOURS) REASON 2 Down Reactor 3 Report # Code
- Code 5 Prevent Recurrence 87-12 871230 S 43.2 B 4 N/A AB STR Unit shutdown to change supply oil strainer on reactor coolant pump 2B.
88-01 880126 F 55.6 B 2 88-002 AB STR Unit shutdown to change supply oil strainer on reactor coolant pump 2B.
I 2 3 F: Forced Re son: Method S: Scheduled A-Equipment Failure (Explain) 1-Maraal B-Maintenance or Test 2-Manual Scram.
C-Refueling 3-Automatic Scram.
D-Regulatory Restriction 4-Continuation 4 E-Operator Training & 5-Load Reduction IEEE Std. 805-1984 License Examination 9-Other 5 F-Administrative IEEE Std. 803A-1983 G-Operational Error (Explain)
H-Other (Explain)
\
I LOUISIAN POWER & LIGHTA / 3i7et: 40nse staser . e.o. sox s0340 NEW ORLEANS, LOUISIAN A 70160 * (504)595 3100
$20NErsSEU February 12, 1988 W3P88-0028 A4.05 QA U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 l
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 MONTHLY OPERATING REPORT l
l
( Enclosed is the subject monthly report which covers the operating
! statistics for the month of January 1988. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
l l
Very truly yours, R.F. urski Nuclear Safety & Regulatory Affairs I Acting Manager RFB:GEW:ssf Enclosure ec: R.D. Martin, NRC Region IV NRC Resident Inspectors Office J.A. Calvo, NRC-NRR D.L. Wigginton, NRC-NRR INPO Records Center (J.T. Wheelock)
E.L. Blake W.M. Stevenson "AN EQUAL OPPORTUNITY EMPLOYER" Igl