IR 05000261/1993027

From kanterella
Revision as of 19:26, 3 June 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Partially Withheld Insp Rept 50-261/93-27 on 931102-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Physical Security Program for Power Reactors,Specifically, Physical Security Plan & Implementing Procedures
ML20058F934
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 12/01/1993
From: Mcguire D, Tillman A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20058F929 List:
References
50-261-93-27, NUDOCS 9312090047
Download: ML20058F934 (1)


Text

-

SAFEGUA@STgFORMATION  ;

f # - .. No se -+ t NUCLEAR REGULATORY COMMISSION REGION 11 i

[ ( 3 101 MAR ETTA STREET, N.W., SUITE 23:X) '

% ' :p ATLANTA, GEORGIA 303234199 k...../ i

'

I Report No.: 50-261/93-27 Licensee: Carolina Power and Light Company '

P. O. Box 1551 Raleigh, NC 27602 Docket No.: 50-261 License No.: OPR-23 Facility Name: H. B. Robinson I

Inspection Conducted: November 2-5, 1993 i Inspector: O/4X+ Ol Ib(v 4t Id 'CI 43 )

A. Tillmah, Safeguards Inspector Date Signed '

l Accompanying Per:onnel: D. R. McGuire, Chief, P:feguards Section Nuclear MateriMs Safety and Safeguards Approved by: c N N '

D. R. McGuire, Chief Date Signed Safeguards Section Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope:

This routine, announced inspection was conducted in the areas of Physical Security Program for Power Reactors, Specifically: Physical Security Plan and Implementing Procedures; Security System Power Supply; Assessment Aids; l Detection Aids, Protected and Vital Areas and Alarm Stations. In addition, the status of licensee actions to enhance the effectiveness of the security system, committed to by letter dated August 13, 1993, submitted in response to findings documented in Inspection Report 93-14; and response to concerns identified by the NRR conducted Operational Safeguards Readiness Evaluation i were reviewe Results:

In the areas inspected, violations or deviations were not identified. The licensee was taking corrective actions for a security system power failur These actions will be tracked as an Inspector followup Item. Observations and )

inspection results confirmed operational effectiveness of the security i progra Improvement in maintenance support and upgraded personal security equipment were noted. Senior management support was evident and security l

!

shif t personnel demonstrated efficient and dedicated performanc PDR G

ADDCK 05000261 ruen eensmee: wm

,'

PDR mtns www u-enuw CC=h

. ~