ML20058G562

From kanterella
Revision as of 17:51, 3 June 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of 931201 Meeting w/ABB-CE in Rockville,Md to Discuss Sys 80+ Final Rept on Potential for Containment Bypass During SG Tube Rupture Event
ML20058G562
Person / Time
Site: 05200002
Issue date: 11/30/1993
From: Mike Franovich
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Russell W
NRC
References
NUDOCS 9312090287
Download: ML20058G562 (3)


Text

-

[pm uq

+ UNITED STATES l

i N 'E NUCLEAR REGULATORY COMMISSION '

7 f WASHINGTON, D.C. 20566-0001  !

k' *...* [

o November 30, 1993 i

Docket No.52-002 i

MEMORANDUM FOR: T. Murley G. Lainas R. Zimmerman F. Miraglia J. Roe B. Boger .

W. Russell J. Zwolinski S. Weiss J. Callahan E. Adensam F. Congel i D. Crutchfield B. Grimes E. Butcher

  • W. Travers J. Wiggins W. Bateman, EDO  :

l F. Gillespie B. D. Liaw M. Slosson l S. Varga A. Thadani Operations Center l

J. Calvo M. Virgilio C. Rossi l

i THRU: R. W. Borchardt. Director Standardization Project DirectTrate

]

l Associate Directorate for Advanced Reactors and License Renewal ,

Office of Nuclear Reactor Regulation FROM: Michael X. Franovich, Project Manager l Standardization Project Directorate  ;

Associate Directorate for Advanced Reactors

Office of Nuclear Reactor Regulation  !

SUBJECT:

DAILY HIGHLIGHT - FORTHCOMING MEETING WITH ABB-COMBUSTION ,

ENGINEERING (ABB-CE) FOR SYSTEM 80+ (STEAM GENERATOR TUBE '

RUPTURES)

DATE & TIME: December 1, 1993 (11 a.m. - 1 p.m.)  ;

LOCATION: U.S. Nuclear Regulatory Commission One White Flint North ,

11555 Rockville Pike l Rockville, Maryland 20852 l Room 4-B-11 '

PURPOSE: Meeting to discuss the System 80+ final report on the potential for containment bypass during a steam generator tube rupture event.

CONTACT:

M. Franovich, NRR 504-1121 NRC FILE CENTER COP 0300'T5 ,

9312090287 931130 b PDR ADOCK 05200002 } - 1 A PDR ,

i November 30, 1993 PARTICIPANTS *: NRC ABB-CE M. Franovich J. Longo  !

R. Jones F. Carpentino G. Hsii D. Finnicum  ;

T. Collins  ;

S. Sun N. Saltos ,

(Original signed by)

Michael X. Franovich, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation cc: See next page

  • Meetings between the NRC technical staff and applicants or licensees are ,

open for interested members of the public, petitioners, intervenors, or ,

other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78. Members of the public who wish to attend should contact me at (301) 504-1121.

DISTRIBUTION:

T Docket File? PDST R/F SBajwa,12G18 RBorchardt PDR SMagruder TWambach MXFranovich PShea OPA EJordan, MNBB 3701 WDean, EDO ,

ACRS (11) RArchitzel JMoore, 15B18 SSun, 8E23 NRR Mailroom,12G18 AChaffee, EAB GHsii, 8E23 TCollins, 8E23 !

RJones, 8E23 MPratt, 7E4 MRubin, 10E4 KShembarger HGraves, NLS217A NSaltos, 10E4 AEl-Bassioni, 10E4 l i

i 0FC: LA:PDST:ADAR PM:PDST: A,D,AR SC:PDST:gRg NAME: PShea y MXFra Etz RArchitzel

/ 4 DATE: ///J4/b3 p /7D/93 f//$793 ,

0FFICIAL DOCUMENT COPY: CM1201.MXF ,

t 6

[

h i

ABB-Combustion Engineering, Inc. Docket No.52-002 i cc: Mr. C. B. Brinkman, Acting Director Nuclear Systems Licensing ABB-Combustion Engineering, Inc. .p 1000 Prospect Hill Road '

Windsor, Connecticut 06095-0500 .

Mr. C. B. Brinkman, Manager '

Washington Nuclear Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330  ;

Rockville, Maryland 20852 i

Mr. Stan Ritterbusch Nuclear Systems Licensing l ABB-Combustion Engineering, Inc.  :

1000 Prospect Hill Road '

Post Office Box 500  :

Windsor, Connecticut 06095-0500 l

Mr. Sterling Franks )

U.S. Department of Energy NE-42 Washington, D.C. 20585

\

Mr. Steve Goldberg i Budget Examiner -

725 17th Street, N.W.

Washington, D.C. 20503 l

Mr. Raymond Ng 1776 Eye Street, N.W.

Suite 300 Washington, D.C. 20006 Josaph R. Egan, Esquire Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.

Washington, D.C. 20037-1128 Mr. Regis A. Matzie, Vice President Nuclear Systems Development ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. Victor G. Snell, Director Safety and Licensing ,

9210 Corporate Boulevard l Suite 410 Rockville, Maryland 20B50 l

-_ _