ML20059J987

From kanterella
Revision as of 02:17, 2 June 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Provides Info Re Generic Fundamentals Exam Section of Operator Licensing Written Exam to Be Administered on 901010.W/o Map of Exam Area & Preliminary Instructions to Participant Encl
ML20059J987
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/13/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gates W
OMAHA PUBLIC POWER DISTRICT
References
NUDOCS 9009210098
Download: ML20059J987 (2)


Text

-

,- l

. a. ; ; >n

., a >

'* =.' -

SEP 131990

In: Reply Refer To: "

Docket: 150-285 Omaha Public Power District ,

ATTN:: _ W. G.' Gates, Division Manager l Nuclear Operations

~444 South 16th Street Mall 1

' Mail:Stop SE/EP4 Omaha, NE 68102-2247 1 1

Gentlemen:

rovide information concerning the Generic The' purposeExamination Fundamentals of this letter'is Sectionto p(GFES) of the operator licer".ing written

. examination to be administered-on October 10, 1990. The PWR tiFES and BWR GFES ~ t will be adsiinistered at'the time and the location specified in Enclosure 1.

  • Included with'this letter are:

o a map of the area including the time and location where the examinationswillbeadministered(Enclosure 1) ,

o a'listoflodgingintheimmediatearea(Enclosure 1) o; the name and telephone number of the regional contact'(Enclosure-1)

reliminary instructions for those taking the examination o-p(Enclosure 2)

Please. ensure that each participant receives ~a copy of the instructions.

We are pleased with your response -in support of this effort. The.results

<-ofothe examination should be available within 3 weeks following completion oflthe-examination. ~A master copy of the examination with answers, altable '

showing the scores of each candidate, and a copy of the answer sheet for.  ;

each_. participant wi11'be sent.to the facility training department.

Sincerely, u

r l , ,

& 'Q 3. Y &

Samuel J. Collins, Director. s g Division of Reactor Projects  !

Enclosures:

I O 1. Map of exam administration area i

2. Preliminary instructions to participants  !

cc w/encis: Facility Training Manager '

DRS:0LS:LA DRS:0LS:SC DRS:DivDir DR : ivDir I EMHime

-JLPelletg hLJCallan SJCollins 9/12/9 9/(j/90 9// 7/90 9/Q/90 ,

900921oove 900913 PDR ADOCK05oog5 {gt{ F -

\ \

. .a -

. @;. ' ' g w a ,w t

~

(bec'toDMB(IE42) bec distribution by RIV:

.R. D; Martin-MIS System-J. L. Pellet E; M. Himes NRRProjectManager(MS:13-D-18)

DRP SC.

, .RIV file L. Miller,-TTC DRS(J..Pelletrdgfile)

.J. Ellis, CASE f

k J

Sb

\.,

(g

-)

,i

_ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ .