ML20065T584
Letter Sequence Other | |
---|---|
Administration Questions
| |
MONTHYEARML20063M5941982-09-10010 September 1982
[Table View]Responds to 820813 Request for Addl Info Re Adequacy of Electrical Distribution Sys Voltages.Theoretical & Actual Voltages for safety-related Buses Listed Project stage: Request ML20065T5841982-10-29029 October 1982 Responds to NRC Re Adequacy of Station Electrical Distribution.Failure of Both Low Voltage Station Auxiliary Transformers Is Condition Described in Fsar,Chapter 7, Electrical Sys Project stage: Other ML20077K6701983-02-0909 February 1983 Adequacy of Electric Distribution Sys Voltages for Point Beach Nuclear Plant,Units 1 & 2, Technical Evaluation Rept Project stage: Other ML20069E6501983-03-14014 March 1983 Suppls 791012 & 810601 Responses to Requests for Addl Info Re Offsite Power Distribution Sys.Nrc Safety Analysis Concluded That Ac Auxiliary Power Sys Adequate & Physical & Electrical Separation of Power Sys Acceptable Project stage: Other ML20072J6891983-03-23023 March 1983 Application for Amend to Licenses DPR-24 & DPR-27,modifying 820427 Tech Spec Change Request 77 Re Loss of Voltage Protective Relays Project stage: Request ML20204F5381983-04-25025 April 1983 Safety Evaluation of Util Preferred Ac Power Sys Conformance GDC 17.Proximity of Low Voltage Transformers Does Not Fully Meet GDC 17 Requirements for Physical Separation,But Deluge Sprinkler Sys Adequate Project stage: Approval ML20204F5251983-04-25025 April 1983 Forwards Safety Evaluation of Util Preferred Ac Power Sys Conformance to GDC 17.Power Sys Do Not Fully Meet Intent of GDC 17 Since Sys Could Be Automatically Disconnected from 4,160-volt Safeguards Buses in Worst Case Accident Loads Project stage: Approval ML20085A7491983-06-30030 June 1983 Informs of No Significant Changes to Electrical Distribution Sys Described in FSAR Which Would Affect Degree of Conformance w/GDC-17.Available Info Adequate to Determine Intent of GDC-17 Re Offsite Power Distribution Sys Project stage: Other 1983-03-14 |
ML20065T584 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 10/29/1982 |
From: | Fay C WISCONSIN ELECTRIC POWER CO. |
To: | Clark R, Harold Denton Office of Nuclear Reactor Regulation |
References | |
TAC-12955, TAC-12956, TAC-46522, TAC-46523, NUDOCS 8211020588 | |
Download: ML20065T584 (2) | |
Similar Documents at Point Beach | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARNPL-99-0564, Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability1999-10-19019 October 1999
[Table view]Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability ML20217A5911999-09-30030 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities.Plant Issues Matrix Encl 05000266/LER-1999-007, Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics1999-09-30030 September 1999 Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics ML20212J7431999-09-30030 September 1999 Forwards Insp Repts 50-266/99-15 & 50-301/99-15 on 990830- 0903.No Violations Noted.Inspectors Concluded That Util Licensed Operator Requalification Training Program Satisfactorily Implemented NPL-99-0555, Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel1999-09-29029 September 1999 Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel ML20212K7651999-09-29029 September 1999 Forwards Insp Repts 50-266/99-13 & 50-301/99-13 on 990714-0830.No Violations Noted.Operators Responded Well to Problems with Unit 1 Instrument Air Leak & Unit 2 Turbine Governor Valve Position Fluctuation ML20212D5771999-09-15015 September 1999 Discusses Review of Response to GL 88-20,suppl 4,requesting All Licensees to Perform Ipeee.Ser,Ter & Supplemental TER Encl ML20211Q6451999-09-0808 September 1999 Forwards Operator Licensing Exam Repts 50-266/99-301OL & 50-301/99-301OL for Exams Conducted on 990726-0802 at Point Beach Npp.All Nine Applicants Passed All Sections of Exam ML20211Q4171999-09-0606 September 1999 Responds to VA Kaminskas by Informing That NRC Tentatively Scheduled Initial Licensing Exam for Operator License Applicants During Weeks of 001016 & 23.Validation of Exam Will Occur at Station During Wk of 000925 05000266/LER-1999-004, Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump1999-09-0202 September 1999 Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump ML20211K5261999-08-31031 August 1999 Forwards Insp Repts 50-266/99-14 & 50-301/99-14 on 990726- 30.Areas Examined within Secutity Program Identified in Rept.No Violations Noted ML20211F6941999-08-27027 August 1999 Provides Individual Exam Results for Applicants That Took Initial License Exam in July & August of 1999.Completed ES-501-2,copy of Each Individual License,Ol Exam Rept, ES-303-1,ES-303-2 & ES-401-8 Encl.Without Encl NPL-99-0473, Informs of Change Being Made to Plan Third 10-year Interval ISI Long Term Plan.Change Extends Interval from Current End Date of 001130 to 020831,due to Operating Cycle Being Increased from 12 to 18 Months1999-08-27027 August 1999 Informs of Change Being Made to Plan Third 10-year Interval ISI Long Term Plan.Change Extends Interval from Current End Date of 001130 to 020831,due to Operating Cycle Being Increased from 12 to 18 Months ML20211E8791999-08-24024 August 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, for Point Beach Nuclear Power Plant,Units 1 & 2.Licensees Provided Requested Info & Responses Required by GL 96-01 ML20211F1501999-08-24024 August 1999 Submits Summary of Meeting Held on 990729,in Region III Office with Util Re Proposed Revs to Plant Emergency Action Level Criteria Used in Classifying Emergencies & Results of Recent Improvement Initiatives in Emergency Preparedness 05000266/LER-1999-006, Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics1999-08-19019 August 1999 Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics NPL-99-0477, Forwards Revised Procedures to Point Beach Nuclear Plant Epips.Revised Procedures Dtd 990723,should Be Filed in NRC Copies of Manual IAW Attached Instructions1999-08-18018 August 1999 Forwards Revised Procedures to Point Beach Nuclear Plant Epips.Revised Procedures Dtd 990723,should Be Filed in NRC Copies of Manual IAW Attached Instructions NPL-99-0426, Requests Relief from Section II of ASME B&PV Code, Nuclear Vessels, 1965 Edition,No Addenda.Detailed Info Attached1999-08-16016 August 1999 Requests Relief from Section II of ASME B&PV Code, Nuclear Vessels, 1965 Edition,No Addenda.Detailed Info Attached ML20210L9141999-08-0404 August 1999 Informs That Versions of Info Re WCAP-14787,submitted in 990622 Application for Amend,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20210K5221999-08-0404 August 1999 Discusses Point Beach Nuclear Plant,Units 1 & 2 Response to Request for Info in GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity NPL-99-0436, Forwards fitness-for-duty Performance Data for six-month Period Ending 9906301999-08-0202 August 1999 Forwards fitness-for-duty Performance Data for six-month Period Ending 990630 ML20210G6011999-07-30030 July 1999 Discusses 990415 Complaint OSHA Received from Employee of Wisconsin Electric Power Co Alleging That Employee Received Lower Performance Appraisal for 1998 Because Employee Raised Safety Concerns While Performing Duties at Point Beach NPL-99-0406, Provides Response to NRC GL 99-02, Lab Testing of Nuclear- Grade Activated Charcoal1999-07-29029 July 1999 Provides Response to NRC GL 99-02, Lab Testing of Nuclear- Grade Activated Charcoal ML20210H0211999-07-28028 July 1999 Forwards Insp Repts 50-266/99-09 & 50-301/99-09 on 990528-0713.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20210G2441999-07-26026 July 1999 Discusses 990714 Meeting with PRA Staff to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA Staff NPL-99-0408, Forwards Pbnps,Units 1 & 2 Plant Simulation Four-Yr Rept, IAW 10CFR55.45(b)(5)(ii).Rept Describes Certification Program Tests Conducted from 1996-1999,identifies Test Discrepancies Still Outstanding & Schedules for 2000-20031999-07-15015 July 1999 Forwards Pbnps,Units 1 & 2 Plant Simulation Four-Yr Rept, IAW 10CFR55.45(b)(5)(ii).Rept Describes Certification Program Tests Conducted from 1996-1999,identifies Test Discrepancies Still Outstanding & Schedules for 2000-2003 ML20209H5471999-07-14014 July 1999 Forwards Insp Repts 50-266/99-12 & 50-301/99-12 on 990614-18.One Violation Noted,But Being Treated as non-cited violation.Long-term MOV Program Not Sufficiently Established to close-out NRC Review of Program,Per GL 89-10 NPL-99-0395, Forwards Partial Response to NRC 990512 RAI Re TS Change 204 Re Control Room Habitability.Meeting Is Planned with NRC to Discuss Issues Related to Control Room & Primary Auxiliary Bldg Ventilation Sys Modifications1999-07-12012 July 1999 Forwards Partial Response to NRC 990512 RAI Re TS Change 204 Re Control Room Habitability.Meeting Is Planned with NRC to Discuss Issues Related to Control Room & Primary Auxiliary Bldg Ventilation Sys Modifications NPL-99-0390, Projects Listed Major near-term License Amend Requests That Could Be Expected to Impact Staff Resources Into Fiscal Years 2000 & 2001,in Response to Administrative Ltr 99-021999-07-0808 July 1999 Projects Listed Major near-term License Amend Requests That Could Be Expected to Impact Staff Resources Into Fiscal Years 2000 & 2001,in Response to Administrative Ltr 99-02 NPL-99-0388, Forwards MORs for June 1999 & Revised MORs for May 1999 for Pbnps,Units 1 & 21999-07-0707 July 1999 Forwards MORs for June 1999 & Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0381, Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl1999-06-30030 June 1999 Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML20196J4161999-06-30030 June 1999 Discusses Relief Requests Submitted by Wisconsin Electric on 980930 for Pump & Valve Inservice Testing Program,Rev 5. Safety Evaluation Authorizing Relief Requests VRR-01,VRR-02, PRR-01 & ROJ-16 Encl NPL-99-0379, Documents Telcon with Hg Ashar of NRC Re Licensee Intentions & Basis for Reselection of Control Tendons in Pbnps Containment Structures.Plants Are Currently Completing 28th Year Tendon Surveillance During Summer of 19991999-06-29029 June 1999 Documents Telcon with Hg Ashar of NRC Re Licensee Intentions & Basis for Reselection of Control Tendons in Pbnps Containment Structures.Plants Are Currently Completing 28th Year Tendon Surveillance During Summer of 1999 NPL-99-0376, Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided1999-06-28028 June 1999 Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided NPL-99-0353, Forwards June 1999 Rev to FSAR for Point Beach Nuclear Plant,Units 1 & 2, IAW Requirements of 10CFR50.71(e).Each Package Contains Revised FSAR Pages That Are to Be Inserted IAW Instructions1999-06-23023 June 1999 Forwards June 1999 Rev to FSAR for Point Beach Nuclear Plant,Units 1 & 2, IAW Requirements of 10CFR50.71(e).Each Package Contains Revised FSAR Pages That Are to Be Inserted IAW Instructions ML20196D4931999-06-18018 June 1999 Forwards Insp Repts 50-266/99-08 & 50-301/99-08 on 990411- 0527.No Violations Noted.Operator Crew Response to Equipment Induced Challenges Generally Good.Handling of Steam Plume in Unit 1 Turbine Bldg Particularly Good ML20195J9471999-06-16016 June 1999 Discusses Ltr from NRC ,re Arrangements Made to Finalized Initial Licensed Operator Exam to Be Administered at Point Beach Nuclear Plant During Week of 990726 ML20196A2931999-06-16016 June 1999 Ack Receipt of Transmitting Changes to Listed Sections of Point Beach Nuclear Plant Security Plan & ISFSI Security Plan,Submitted IAW 10CFR50.54(p).No NRC Approval Is Required Since Changes Do Not Decrease Effectiveness ML20195J9251999-06-14014 June 1999 Discusses 990610 Telcon Between Wp Walker & D Mcneil Re Arrangements for NRC to Inspect Licensed Operator Requalification Program at Point Beach Nuclear Power Plant for Week of 990816 05000266/LER-1999-005, Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics1999-06-11011 June 1999 Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics NPL-99-0336, Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-62301999-06-10010 June 1999 Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-6230 NPL-99-0330, Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld1999-06-0404 June 1999 Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld 05000301/LER-1999-003, Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech Specs1999-05-28028 May 1999 Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech Specs NPL-99-0319, Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 21999-05-28028 May 1999 Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 2 ML20206T3691999-05-17017 May 1999 Ltr Contract,Task Order 242 Entitled, Review Point Beach 1 & 2 Conversion of Current TS for Electrical Power Systems to Improved TS Based on Standard TS, Under Contract NRC-03-95-026 ML20206N5561999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Cm Craig Will Be Section Chief for Point Beach Npp.Organization Chart Encl ML20206P2551999-05-12012 May 1999 Forwards Handout Provided to NRC by Wisconsin Electric at 990504 Meeting Which Discussed Several Recent Operational Issues & Results of Recent Improvement Initiatives in Engineering ML20206N5331999-05-12012 May 1999 Forwards RAI Re & Suppl by Oral Presentation During 980604 Meeting,Requesting Amend for Plant,Units 1 & 2 to Revise TSs 15.3.12 & 15.4.11 ML20196F3211999-05-11011 May 1999 Requests Proprietary WCAP-14787, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt-NSSS Power), Be Withheld from Public Disclosure ML20206K0391999-05-0707 May 1999 Forwards Insp Repts 50-266/99-06 & 50-301/99-06 on 990223- 0410.Ten Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy 1999-09-08 Category:INCOMING CORRESPONDENCE MONTHYEARNPL-99-0564, Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability1999-10-19019 October 1999
[Table view]Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability 05000266/LER-1999-007, Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics1999-09-30030 September 1999 Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics NPL-99-0555, Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel1999-09-29029 September 1999 Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel 05000266/LER-1999-004, Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump1999-09-0202 September 1999 Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump NPL-99-0473, Informs of Change Being Made to Plan Third 10-year Interval ISI Long Term Plan.Change Extends Interval from Current End Date of 001130 to 020831,due to Operating Cycle Being Increased from 12 to 18 Months1999-08-27027 August 1999 Informs of Change Being Made to Plan Third 10-year Interval ISI Long Term Plan.Change Extends Interval from Current End Date of 001130 to 020831,due to Operating Cycle Being Increased from 12 to 18 Months 05000266/LER-1999-006, Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics1999-08-19019 August 1999 Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics NPL-99-0477, Forwards Revised Procedures to Point Beach Nuclear Plant Epips.Revised Procedures Dtd 990723,should Be Filed in NRC Copies of Manual IAW Attached Instructions1999-08-18018 August 1999 Forwards Revised Procedures to Point Beach Nuclear Plant Epips.Revised Procedures Dtd 990723,should Be Filed in NRC Copies of Manual IAW Attached Instructions NPL-99-0426, Requests Relief from Section II of ASME B&PV Code, Nuclear Vessels, 1965 Edition,No Addenda.Detailed Info Attached1999-08-16016 August 1999 Requests Relief from Section II of ASME B&PV Code, Nuclear Vessels, 1965 Edition,No Addenda.Detailed Info Attached NPL-99-0436, Forwards fitness-for-duty Performance Data for six-month Period Ending 9906301999-08-0202 August 1999 Forwards fitness-for-duty Performance Data for six-month Period Ending 990630 NPL-99-0406, Provides Response to NRC GL 99-02, Lab Testing of Nuclear- Grade Activated Charcoal1999-07-29029 July 1999 Provides Response to NRC GL 99-02, Lab Testing of Nuclear- Grade Activated Charcoal NPL-99-0408, Forwards Pbnps,Units 1 & 2 Plant Simulation Four-Yr Rept, IAW 10CFR55.45(b)(5)(ii).Rept Describes Certification Program Tests Conducted from 1996-1999,identifies Test Discrepancies Still Outstanding & Schedules for 2000-20031999-07-15015 July 1999 Forwards Pbnps,Units 1 & 2 Plant Simulation Four-Yr Rept, IAW 10CFR55.45(b)(5)(ii).Rept Describes Certification Program Tests Conducted from 1996-1999,identifies Test Discrepancies Still Outstanding & Schedules for 2000-2003 NPL-99-0395, Forwards Partial Response to NRC 990512 RAI Re TS Change 204 Re Control Room Habitability.Meeting Is Planned with NRC to Discuss Issues Related to Control Room & Primary Auxiliary Bldg Ventilation Sys Modifications1999-07-12012 July 1999 Forwards Partial Response to NRC 990512 RAI Re TS Change 204 Re Control Room Habitability.Meeting Is Planned with NRC to Discuss Issues Related to Control Room & Primary Auxiliary Bldg Ventilation Sys Modifications NPL-99-0390, Projects Listed Major near-term License Amend Requests That Could Be Expected to Impact Staff Resources Into Fiscal Years 2000 & 2001,in Response to Administrative Ltr 99-021999-07-0808 July 1999 Projects Listed Major near-term License Amend Requests That Could Be Expected to Impact Staff Resources Into Fiscal Years 2000 & 2001,in Response to Administrative Ltr 99-02 NPL-99-0388, Forwards MORs for June 1999 & Revised MORs for May 1999 for Pbnps,Units 1 & 21999-07-0707 July 1999 Forwards MORs for June 1999 & Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0381, Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl1999-06-30030 June 1999 Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl NPL-99-0379, Documents Telcon with Hg Ashar of NRC Re Licensee Intentions & Basis for Reselection of Control Tendons in Pbnps Containment Structures.Plants Are Currently Completing 28th Year Tendon Surveillance During Summer of 19991999-06-29029 June 1999 Documents Telcon with Hg Ashar of NRC Re Licensee Intentions & Basis for Reselection of Control Tendons in Pbnps Containment Structures.Plants Are Currently Completing 28th Year Tendon Surveillance During Summer of 1999 NPL-99-0376, Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided1999-06-28028 June 1999 Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided NPL-99-0353, Forwards June 1999 Rev to FSAR for Point Beach Nuclear Plant,Units 1 & 2, IAW Requirements of 10CFR50.71(e).Each Package Contains Revised FSAR Pages That Are to Be Inserted IAW Instructions1999-06-23023 June 1999 Forwards June 1999 Rev to FSAR for Point Beach Nuclear Plant,Units 1 & 2, IAW Requirements of 10CFR50.71(e).Each Package Contains Revised FSAR Pages That Are to Be Inserted IAW Instructions 05000266/LER-1999-005, Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics1999-06-11011 June 1999 Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics NPL-99-0336, Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-62301999-06-10010 June 1999 Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-6230 NPL-99-0330, Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld1999-06-0404 June 1999 Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld NPL-99-0319, Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 21999-05-28028 May 1999 Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 2 05000301/LER-1999-003, Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech Specs1999-05-28028 May 1999 Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech Specs ML20196F3211999-05-11011 May 1999 Requests Proprietary WCAP-14787, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt-NSSS Power), Be Withheld from Public Disclosure NPL-99-0242, Submits Commitment Schedule Update,Per GL 95-07 Re Pressure Locking & Thermal Binding of safety-related power-operated Gate Valves.Unit 1 Block Valve Replacement Will Be Performed During Upcoming 1999 U1R25 Outage1999-04-27027 April 1999 Submits Commitment Schedule Update,Per GL 95-07 Re Pressure Locking & Thermal Binding of safety-related power-operated Gate Valves.Unit 1 Block Valve Replacement Will Be Performed During Upcoming 1999 U1R25 Outage NPL-99-0246, Forwards 1998 Annual Monitoring Rept, for Pbnps Units 1 & 2.Revised ODCM & Environ Manual Are Encl1999-04-27027 April 1999 Forwards 1998 Annual Monitoring Rept, for Pbnps Units 1 & 2.Revised ODCM & Environ Manual Are Encl ML20206C2361999-04-22022 April 1999 Forwards 1998 Annual Rept to Stockholders of Wepc Which Includes Certified Financial Statements,Per 10CFR50.71 NPL-99-0230, Submits Clarification of Which Portions of OMa-1988 Parts 6 & 10 Are Being Utilized at Pbnp for IST Program Implementation & Cold SD & RO Justifications,Per 990218 Telcon with NRC1999-04-19019 April 1999 Submits Clarification of Which Portions of OMa-1988 Parts 6 & 10 Are Being Utilized at Pbnp for IST Program Implementation & Cold SD & RO Justifications,Per 990218 Telcon with NRC 05000301/LER-1999-002, Forwards LER 99-002-00 Re Discovery That Cable Necessary to Provide Plant Parameter Required to Be Monitored for App R Safe SD Location Was Not Routed Independent of Appropriate Fire Zone.Commitments in Rept Indicated in Italic1999-04-16016 April 1999 Forwards LER 99-002-00 Re Discovery That Cable Necessary to Provide Plant Parameter Required to Be Monitored for App R Safe SD Location Was Not Routed Independent of Appropriate Fire Zone.Commitments in Rept Indicated in Italics NPL-99-0219, Provides Final Notification of Change to Commitments Documented in LER 266/97-022-00 Re Electrical Short Circuits During CR Fire1999-04-15015 April 1999 Provides Final Notification of Change to Commitments Documented in LER 266/97-022-00 Re Electrical Short Circuits During CR Fire 05000266/LER-1999-001, Forwards LER 99-001-01,describing Discovery That Common Min Recirculation Flow Line Return to RWST for Safety Injection & Containment Spray Pumps Was Partially Frozen & Would Not Pass Flow.New Commitments Indicated in Italics i1999-04-0808 April 1999 Forwards LER 99-001-01,describing Discovery That Common Min Recirculation Flow Line Return to RWST for Safety Injection & Containment Spray Pumps Was Partially Frozen & Would Not Pass Flow.New Commitments Indicated in Italics in Rept NPL-99-0174, Confirms Completion of Requested Actions in Accordance with Required Response of GL 96-01 for Unit 2.Confirmation of Completion for Unit 1 Was Provided in Ltr Npl 98-0591,dtd 9807141999-03-30030 March 1999 Confirms Completion of Requested Actions in Accordance with Required Response of GL 96-01 for Unit 2.Confirmation of Completion for Unit 1 Was Provided in Ltr Npl 98-0591,dtd 980714 ML20206B8231999-03-30030 March 1999 Forwards Final Exercise Rept for Biennial Radiological Emergency Preparedness Exercise Conducted on 981103 for Point Beach Power Plant.One Deficiency Identified for Manitowoc County.County Corrected Deficiency Immediately NPL-99-0177, Forwards Decommissioning Funding Status Info for Pbnp,Units 1 & 2,per 10CFR50.751999-03-30030 March 1999 Forwards Decommissioning Funding Status Info for Pbnp,Units 1 & 2,per 10CFR50.75 05000301/LER-1999-001, Forwards LER 99-001-00,re Loss of Safeguards Electrical Bus During Refueling Surveillance Testing Which Resulted in Temporary Unavailability of One Train of Decay Heat Removal. Commitments Made by Util Are Identified in Italics1999-03-10010 March 1999 Forwards LER 99-001-00,re Loss of Safeguards Electrical Bus During Refueling Surveillance Testing Which Resulted in Temporary Unavailability of One Train of Decay Heat Removal. Commitments Made by Util Are Identified in Italics NPL-99-0122, Forwards Relief Requests RR-1-19 & RR-2-25,requesting Relief from Section XI of ASME B&PV Code, Rules for Inservice Exam of NPP Components, 1986 Edition,No Addenda.Requirements for Relief Apply to Third ten-yr ISI Interval for Units 1 &1999-03-0303 March 1999 Forwards Relief Requests RR-1-19 & RR-2-25,requesting Relief from Section XI of ASME B&PV Code, Rules for Inservice Exam of NPP Components, 1986 Edition,No Addenda.Requirements for Relief Apply to Third ten-yr ISI Interval for Units 1 & 2 NPL-99-0111, Informs NRC That IAW Provisions of ASME Boiler & Pressure Code,Section Xi,Paragraphs IWA-2430(d) & IWA-2430(e),WEPC Has Extended Third 10 Yr Interval for Pressure Testing Program at Pbnp,Unit 1 by 21 Months1999-03-0303 March 1999 Informs NRC That IAW Provisions of ASME Boiler & Pressure Code,Section Xi,Paragraphs IWA-2430(d) & IWA-2430(e),WEPC Has Extended Third 10 Yr Interval for Pressure Testing Program at Pbnp,Unit 1 by 21 Months NPL-99-0116, Forwards Proprietary & non-proprietary Revised Point Beach Nuclear Plant Emergency Plan IAW 10CFR50.54(q).Proprietary Plan Withheld1999-03-0101 March 1999 Forwards Proprietary & non-proprietary Revised Point Beach Nuclear Plant Emergency Plan IAW 10CFR50.54(q).Proprietary Plan Withheld NPL-99-0115, Forwards Proprietary & non-proprietary Revised EPIPs to Point Beach Nuclear Plant,Units 1 & 21999-03-0101 March 1999 Forwards Proprietary & non-proprietary Revised EPIPs to Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0114, Provides Results of Wepcs Insp,Replacement & Mechanical Testing of Reactor Internals Baffle Former Bolts During Recent Point Beach Refueling Outage1999-02-25025 February 1999 Provides Results of Wepcs Insp,Replacement & Mechanical Testing of Reactor Internals Baffle Former Bolts During Recent Point Beach Refueling Outage NPL-99-0086, Documents Commitment Change Which Is to Discontinue Actions Contained in Util Ltr Dtd 970613,after NRC Approval of LAR & Lower Containment Leak Rate Limit Is Implemented. Change Is Acceptable IAW Applicable Plant Procedure1999-02-24024 February 1999 Documents Commitment Change Which Is to Discontinue Actions Contained in Util Ltr Dtd 970613,after NRC Approval of LAR & Lower Containment Leak Rate Limit Is Implemented. Change Is Acceptable IAW Applicable Plant Procedure NPL-99-0101, Forwards Proprietary & non-proprietary Version of Rev 20 to EPIP 3.2, Emergency Response Organization Notification & Revised Index.Proprietary Info Withheld1999-02-19019 February 1999 Forwards Proprietary & non-proprietary Version of Rev 20 to EPIP 3.2, Emergency Response Organization Notification & Revised Index.Proprietary Info Withheld ML20203F7301999-02-10010 February 1999 Forwards Revs to Security Plan Sections 1.2,1.3,1.4,2.1,2.5, 2,6,2.8,6.1,6.4,6.5,B-3.0,B-4.0,B-5.0 & Figure R Dtd 990210. Evaluation & Description of Plan Revs Also Encl to Assist in NRC Review.Encls Withheld NPL-99-0067, Submits 30 Day Rept of Changes & Errors Discovered in ECCS Evaluation Models for Pbnp,Unit 21999-02-0202 February 1999 Submits 30 Day Rept of Changes & Errors Discovered in ECCS Evaluation Models for Pbnp,Unit 2 NPL-99-0064, Forwards Revised TS Bases Page 15.4.4,correcting References to Pbnp FSAR Re Reactor Containment Design.Changes Are Administrative Only & Do Not Alter Facility or Operation,As Described in FSAR or Any TS Requirement1999-02-0202 February 1999 Forwards Revised TS Bases Page 15.4.4,correcting References to Pbnp FSAR Re Reactor Containment Design.Changes Are Administrative Only & Do Not Alter Facility or Operation,As Described in FSAR or Any TS Requirement NPL-98-1032, Forwards Revs to Pbnp Security Plan Sections 1.1,1.2,2.1, 2.6,2.8,6.1 & 6.4 & Revs to Pbnp ISFSI Security Plan Sections 1.0 & 7.0,per 10CFR50.54(p).Encl Withheld1999-01-27027 January 1999 Forwards Revs to Pbnp Security Plan Sections 1.1,1.2,2.1, 2.6,2.8,6.1 & 6.4 & Revs to Pbnp ISFSI Security Plan Sections 1.0 & 7.0,per 10CFR50.54(p).Encl Withheld 05000266/LER-1998-029, Forwards LER 98-029-00,describing Discovery of Isolation of Autostart Feature for Svc Water Pumps from Unit 2,safeguards Buses During Modifications1999-01-26026 January 1999 Forwards LER 98-029-00,describing Discovery of Isolation of Autostart Feature for Svc Water Pumps from Unit 2,safeguards Buses During Modifications NPL-99-0031, Informs That Wepc Reviewed Contents of NEI to NRC & Have Verified Info Provided in Ltr Pertaining to WOG Member Plants Is Applicable to Pbnp.Attachment Responds to NRC Questions by Ref to Info in 981211 NEI Ltr1999-01-15015 January 1999 Informs That Wepc Reviewed Contents of NEI to NRC & Have Verified Info Provided in Ltr Pertaining to WOG Member Plants Is Applicable to Pbnp.Attachment Responds to NRC Questions by Ref to Info in 981211 NEI Ltr NPL-99-0004, Provides Status Update on Program Activities & Schedule for Final Resolution of Items Re Verification of Seismic Piping Class Interfaces for Point Beach Nuclear Plant,Units 1 & 21999-01-11011 January 1999 Provides Status Update on Program Activities & Schedule for Final Resolution of Items Re Verification of Seismic Piping Class Interfaces for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0012, Forwards Proprietary & Nonproprietary Revs to Epips. Proprietary Version of EPIPs Withheld1999-01-0808 January 1999 Forwards Proprietary & Nonproprietary Revs to Epips. Proprietary Version of EPIPs Withheld 1999-09-30 Category:UTILITY TO NRC MONTHYEARML20059H9391990-09-13013 September 1990
[Table view]Forwards Amended Response to Notice of Violations Noted in Insp Repts 50-266/89-27 & 50-301/89-26.Corrective Action: Revised Procedures Will Not Be Issued Until After Unit 2 Refueling Outage.Other Changes Anticipated by 901231 ML20059G7211990-09-0505 September 1990 Responds to Generic Ltr 90-03, Vender Interface for Safety- Related Components. Implementing Formal Vendor Interface Program for Every safety-related Component Impractical ML20028G9071990-08-31031 August 1990 Advises That long-term erosion/corrosion-induced Program for Pipe Wall Thinning in Place,Per Generic Ltr 89-08.Program Assures Erosion/Corrosion Will Not Lead to Degradation of Single & two-phase High Energy Carbon Steel Sys ML20059G8741990-08-31031 August 1990 Forwards Revised Security Plan,Per NRC .Summary of Revs Listed.Rev Withheld (Ref 10CFR3,50,70 & 73) ML20064A4711990-08-29029 August 1990 Forwards Semiannual Monitoring Rept,Jan-June 1990, Rev 1 to Process Control Program, Rev 7 to Environ Manual & Rev 5 to Odcm ML20058N6771990-08-0303 August 1990 Forwards Public Version of Revised Procedures to Emergency Plan manual.W/900813 Release Memo ML20058L1471990-08-0303 August 1990 Responds to NRC Re Weaknesses Noted in Insp Repts 50-266/90-201 & 50-301/90-201 Re Electrical Distribution. Corrective Actions:Design Basis Documentation Will Be Developed to Alleviate Weaknessess in Diesel Generators ML20058L5041990-07-30030 July 1990 Discusses & Forwards Results of fitness-for-duty Program Performance Data for 6-month Period Ending 900630 ML20055J2031990-07-25025 July 1990 Responds to NRC Bulletin 89-002 Re Insp of safety-related Anchor/Darling Model S350W Check Valves Supplied w/A193 Grade B6 Type 410 SS Retaining Block Studs.Studs Visually Inspected & No Cracks Found ML20055H7781990-07-24024 July 1990 Forwards Corrected Monthly Operating Rept for June 1990 for Point Beach Unit 2.Correction on Line 18 Regards Net Electrical Energy Generated ML20055H6621990-07-23023 July 1990 Forwards Central Files & Public Versions of Revised Epips, Including Rev 2 to EPIP 1.1.1,Rev 16 to EPIP 4.1,Rev 6 to EPIP 6.5,Rev 20 to EPIP 1.2,Rev 8 to EPIP 6.3,Rev 0 to EPIP 7.3.2,Rev 10 EPIP 10.2 & Rev 11 to EPIP 11.3 ML20058K8941990-07-23023 July 1990 Forwards June 1990 Updated FSAR for Point Beach Nuclear Plant Units 1 & 2.Steam Generator Upper Ph Guideline in Table 10.2-1 Changed from 9.3 to 9.4 ML20044A9091990-07-0606 July 1990 Responds to NRC Bulletin 90-001 Re Loss of Fill Oil in Transmitters Mfg by Rosemount.None of Listed Transmitters Installed at Plant in Aug 1988 Identified as Having High Failure Fraction Due to Loss of Fill Oil ML20055D4421990-07-0303 July 1990 Forwards Reactor Containment Bldg Integrated Leak Rate Test Point Beach Nuclear Plant Unit 1,1990, Summary Rept ML20055D3471990-06-29029 June 1990 Provides Addl Response to Bulletin 88-008, Thermal Stresses in Piping Connected to Rcss. Engineering Evaluations Performed to Assure Code Compliance Due to Unanalyzed Condition of Thermal Stratification Addressed ML20055D6221990-06-29029 June 1990 Provides Suppl to Re Loss of All Ac Power.Test Demonstrated That Ventilation Mod & Recalibration of High Temp Trip for Auxiliary Power Diesel Improved Performance of Gas Turbine Generator as Alternate Ac Source ML20055D2291990-06-22022 June 1990 Informs NRC That Gj Maxfield Promoted to Plant Manager effective,900701 ML20055D6231990-06-22022 June 1990 Advises of Decision to Proceed W/Leak Testing of Sys During Plant Refueling Outage Due to Delay in Delivery of Gamma-Metrics Hardware Fix Kits.Test Revealed That Both in-containment Cable & Detector Assembly Cable Had Leaks ML20044A0011990-06-18018 June 1990 Provides Current Implementation Status of Generic Safety Issues at Plant,In Response to Generic Ltr 90-04 ML20043D6511990-05-25025 May 1990 Discusses Cycle 18 Reload on 900519,following 7-wk Refueling & Maint Outage.Reload SER for Cycle 18 Demonstrates That No Unreviewed Safety Questions,As Defined in 10CFR50.59, Involved in Operation of Unit During Cycle ML20043B1481990-05-18018 May 1990 Advises That Necessary Info Received from Westinghouse Re Revised Administrative Controls for NRC Bulletin 88-002, Rapidly Propagating Fatique Cracks in Steam Generator Tubes. ML20043B1101990-05-17017 May 1990 Documents Status of Evaluations Committed to Be Performed Re IE Bulletin 79-14 Program.Support CH-151-4-H50 Modified During Unit 1 Refueling Outage & Now in Code Compliance. Meeting Proposed During Wks of 900618 or 900716 ML20043A9921990-05-16016 May 1990 Advises of Typo in Item 2.C Re Emergency Diesel Generator Meter Accuracy in Submittal Re Corrective Actions in Response to Concerns Identified During Electrical Insp.Meter Calibr Reading Should Be 3,050 Kw Not 350 Kw ML20043B0481990-05-16016 May 1990 Updates 890330 Response to NRC Bulletin 88-010, Nonconforming Molded Case Circuit Breakers. Util Will Replace Unit 1 Inverter & Battery Charger Circuit Breakers within 30 Days After Receipt & QA Verification ML20043A7631990-05-15015 May 1990 Responds to Notice of Violation & Forwards Civil Penalty in Amount of $87,000 for Violations Noted in Insp Repts 50-266/89-32,50-266/89-33,50-301/89-32 & 50-301/89-33. Addl Employees Added in QA & Corporate Nuclear Engineering ML20042H0201990-05-10010 May 1990 Forwards List of Concerns Identified at 900417 Electrical Insp Exit Meeting to Discuss Preliminary Findings of Special Electrical Insp Conducted on 900319-0412 Re Adequacy of Electrical Distribution Sys ML20043A2181990-05-10010 May 1990 Forwards Nonproprietary & Proprietary Version of Point Beach Nuclear Plant,Emergency Plan Exercise,900314. ML20042G7441990-05-0909 May 1990 Forwards LER 90-003-00 ML20042G7361990-05-0808 May 1990 Forwards LER 90-004-00 ML20042E4571990-04-10010 April 1990 Documents Basis for Request for Temporary Waiver of Compliance of Tech Spec 15.3.7.A.1.e Re Diesel Generator Fuel Oil Supply ML20012F2961990-03-29029 March 1990 Withdraws Tech Spec Change Request 120 Re Staff Organization Changes & Deletion of Organizational Charts,Based on Further Corporate Restructuring within Util ML20012D8301990-03-20020 March 1990 Responds to Generic Ltr 89-19, Safety Implication of Control Sys in LWR Nuclear Power Plants. No Limiting Condition for Operation Required for Overfill Protection Sys at Plant ML20012D4241990-03-0808 March 1990 Forwards Public Version of Revised Epips,Including Rev 17 to EPIP 1.3,Rev 8 to EPIP 3.1,Rev 15 to EPIP 4.1,Rev 1 to EPIP 6.7,Rev 1 to EPIP 7.1,Rev 11 to EPIP 7.2.1 & Rev 11 to EPIP 7.2.2 ML20011F7531990-02-26026 February 1990 Informs NRC of Apparent Inconsistency Between Min Level of Boric Acid Solution to Be Maintained in Boric Acid Storage Tanks Per Tech Specs & Amount of Deliverable Boric Acid Assumed in Safety Analyses ML20006B7091990-01-25025 January 1990 Responds to NRC Bulletin 89-002 Re Check Valve Bolting Insp. All Anchor-Darling Model S35OW Check Valves Inspected for Cracked Internal Bolting During Refueling Outage of Unit.No Indications of Cracks Found ML20006A3381990-01-18018 January 1990 Forwards PDR & Central Files Versions of Rev 16 to EPIP 9.2 & Forms, Radiological Dose Evaluation. ML20006A3411990-01-16016 January 1990 Forwards Rev 16 to EPIP 9.2, Radiological Dose Evaluation to Be Inserted in EPIP Manual ML20005G0901990-01-12012 January 1990 Responds to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Outside of Intake Structure Will Be Inspected for Excessive Corrosion on Semiannual Basis & Forebay & Pumphouse Inspected ML20005G1751990-01-12012 January 1990 Responds to NRC 891213 Ltr Re Violations Noted in Insp Repts 50-266/89-30 & 50-301/89-30.Corrective Action:Procedure RP-6A, Steam Generator Crevice Flush (Vacuum Mode), Initiated ML20005H0551990-01-11011 January 1990 Responds to NRC Bulletin 89-003, Potential Loss of Required Shutdown Margin During Refueling Operations. Util Will Provide Specific Training to All Members Responsible for Refueling Operation to Emphasize Importance of Procedures ML20005G9031990-01-0909 January 1990 Forwards Monthly Operating Repts for Dec 1989 for Point Beach Nuclear Plant Units 1 & 2 & Revised Monthly Operating Rept for Nov for Point Beach Unit 2 ML20005G5641990-01-0808 January 1990 Updates Progress Made on Issues Discussed in Insp Repts 50-266/89-12 & 50-301/89-11 Re Emergency Diesel Generator Vertical Slice SSFI Conducted by Util.By Jul 1990,revised Calculation Re as-built Configuration Will Be Performed ML20005E5441989-12-29029 December 1989 Describes Actions & Insps Completed During Recent U2R15 Refueling Cycle & Proposed Schedule for Completion of NRC Bulletin 88-008 Requirements,Per Util 881221 & 890616 Ltrs. Extension Requested Until 900631 to Submit Data Evaluation ML20005E5451989-12-28028 December 1989 Advises That Addl Info Required from Westinghouse to Meet Util 890621 Commitment to Adopt Administrative Control Re Rapidly Propagating Fatigue Cracks in Steam Generator Tubes Per NRC Bulletin 88-002.Info Anticipated by End of Mar 1990 ML20005E5381989-12-27027 December 1989 Provides Update of Status of Implementation of Resolution of Human Engineering Discrepancies Documented During Dcrdr. Lighting Intended to Document Deficiencies Per NUREG-0700, Eleven Human Engineering Discrepancy Computers Resolved ML19354D5781989-12-21021 December 1989 Certifies Implementation of Fitness for Duty Program Which Meets Requirements of 10CFR26 for All Personnel Having Unescorted Access to Plant Protected Areas.Periodic Mandatory Random Chemical Testing Will Commence on 900103 ML20005D8071989-12-21021 December 1989 Forwards Response to Violations Noted in Insp Repts 50-266/89-29 & 50-301/89-29.Response Withheld (Ref 10CFR73.21) ML20005E2301989-12-21021 December 1989 Forwards Reactor Containment Bldg Integrated Leak Rate Test Point Beach Nuclear Plant Unit 2, Summary Rept,Per 10CFR50,App J.Type A,B & C Leak Test Results Provided ML20042D2391989-12-21021 December 1989 Responds to Violations Noted in Insp Repts 50-266/89-27 & 50-301/89-26.Corrective Actions:Superintendent of Health Physics Discussed Log Book Entry Requirements W/Health Physics Contractor Site Coordinator ML19354D6231989-12-15015 December 1989 Responds to Generic Ltr 89-10 Re safety-related motor- Operated Valve Testing & Surveillance.Util Intends to Meet All Recommendations Discussed in Ltr Except for Item C Re Changing motor-operated Valve Switch Settings 1990-09-05 |
Text
o lHsconsin Electnc macoumr 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 October 29, 1982 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Attention: Mr. R. A. Clark, Chief Operating Reactors, Branch 3 Gentlemen:
DOCKET NOS. 50-266 AND 50-301 ADEQUACY OF STATION ELECTRICAL DISTRIBUTION POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 In a letter dated August 13, 1982, Wisconsin Electric was requested to show that a fire or similar catastrophe in or near one of the Point Beach Nuclear Plant low voltage station auxiliary transformers (lX04 or 2X04) and causing that transformer to be forced out of service could not cause the failure of the second low voltage station auxiliary transformer. The request was prompted by the resident inspector's observation that the 1X04 and 2X04 transformers are located in relatively close proximity to each other.
We have reviewed this situation and have concluded that the failure of both low voltage station auxiliary transformers is a condition that is bounded by the considerations and analyses presented in the Point Beach Nuclear Plant Final Safety Analysis l Report (FSAR) , Chapter 7, " Electrical Systems". The low voltage station auxiliary transformers are described in the FSAR as the first source of emergency power for each unit. No credit, however, is taken for these transformers as a safety-related power supply.
Since they are located outside the plant building and are not, I for example, specifically missile or seismically protected, the FSAR safety analyses do not assume the availability of these trans-( formers. The safety-related backup sources of emsrgency power l at the Point Beach Nuclear Plant are the two emergency diesel generator sets. Each emergency diesel generator is capable of sequentially starting and supplying the power requirements of one l
l l
Gb[
8211020588 821029 PDR ADOCK 05000266 I p PDR ,
a i:
Mr. H. R. Denton October 29, 1982 complete set of. safeguards equipment for one unit that is supplying the engineered safety features for the hypothetical design basis accident in that unit, and providing sufficient power to permit the second unit to be placed in a safe shutdown condition. These diesel generator requirements assume the loss of off-site electrical power.
We believe, therefore, that it is not necessary to show that a fire or similar catastrophe in one low voltage station auxiliary transformer cannot affect the other unit's low voltage station auxiliary transformer. In fact, because of their locations, we consider it unlikely that a complete analysis of potential accidents which might affect 1X04 or 2x04 would show that the same accident could not affect the other transformer.
However, as stated in the NRC (then AEC) Safety Evaluation Report for the Point Beach Nuclear Plant, we conclude that the AC auxiliary power system has adequate capacity and physical and electrical separation and no modifications regarding the 1X04 and 2X04 transformers are required or necessary.
Very truly yours, i
C Assistant Vice President l C. W. Fay Copy to NRC Resident Inspector i
!