ML20096C276

From kanterella
Revision as of 13:28, 24 September 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1995 for Waterford 3 Ses.W/
ML20096C276
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/31/1995
From: Burski R, Freeman D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-96-0005, W3F1-96-5, NUDOCS 9601170203
Download: ML20096C276 (7)


Text

'

lO~=, ENTERGY I"OI"e'""" " '"*'

, . Kdiona LA 70066 Tel 504 739 6774 R. F. Burski Onector Ntotear Seifety W3W%td 3 W3F1-96-0005 A4.05 PR January 12, 1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555  ;

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen: 1 J

Attached is the subject monthly report which covers the operating statistics for the month of December, 1995. This report is submitted per i Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility l Operating License No. NPF-38.

Very truly yours, R.F. Burski Director Nuclear Safety RFB/DFL/ssf Attachment cc: L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)

J.T. Wheelock (INP0 Records Center)

NRC Residant Inspectors Office 170030 g di 1 4 9601170203 951231 ADOCK 05000382 PDR R PDR lj g

NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 for December, 1995 The unit operated at an average reactor power level of 99.8% and experienced no shutdowns or significant power reductions during the period.

l

)

1&W Page : 4 of 6

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for December, 1995 There were no pressurizer safety valve failures or challenges experienced during the month.

e 4,

1496 Page : 2 of 6

i

.. .- OPERATING DATA REPORT l l

DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : January 8, 1996 i

COMPLETED BY : D. S. Freeman I TELEPHONE : (504) 464-3352 OPERATING STATUS

1. Reporting Period  : December, 1995 Gross Hours in Reporting Period  : 744
2. Currently Authorized Power Level (MWt) : 3.390 J Maximum Dependable Capacity (Net MWe) : 1,075 Design Electrical Rating (Net MWe) : 1,104
3. Power '.evel to which Restricted (if any) (Net MWe) : N/A i 1
4. Reason for Restriction (if any)  : N/A i l

l THIS YEAR TO MONTH DATE CUMULATIVE l

5. Number of Hours Reactor was Critical 744.0 7,309.9 76,032.7 1
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 l
7. Hours Generator was On-line 744.0 7,241.9 75.086.2 i
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 2.517,767 24,366,832 248,696.441
10. Gross Electrical Energy Generated (MWH) 848,580 8.123,910 82,858,370
11. Net Electrical Energy Generated (MWH) 813,890 7,763,449 79,005,815
12. Reactor Service Factor 100.0 83.4 84.5
13. Reactor Availability Factor 100.0 83.4 84.5 ,
14. Unit Service Factor 100.0 82.7 83.4
15. Unit Availability Factor 100.0 82.7 83.4
16. Unit Capacity Factor (using MDC) 101.8 82.4 81.6
17. Unit Capacity Factor (using DER) 99.1 80.3 79.5
18. Unit Forced Outage Rate 0.0 6.0 3.4 14 % Pepe . 3 of 6

1

. .- OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 l DATE OF REPORT : January 8, 1996 l COMPLETED BY : D. S. Freeman TELEPHONE : (504) 464-3352 OPERATING STATUS (Cont.) i

19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :

NONE l l

1

20. If Shutdown at end of report period, estimated date of startup: N/A l
21. Unit is in Commercial Operation.  ;

l THIS YEAR TO  !

MONTH DATE CUMULATIVE

22. Hours in Reporting Period 744 8,760 90,025
23. Unit Forced Outage Hours 0.0 463.0 2.673.2
24. Nameplate Rating (Gross MWe) : 1,200 Max. Dependable Capacity (Gross MWe) : 1,120
25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :

N/A 1

j i

i i

FE86 P.ge 4 of 6

~ _ - - - _ _ - - _ _ - - - _ _ - - - - - -

. . j

.. . .- AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER : 50-382 l UNIT NAME : WATERFORD 3 DATE OF REPORT : January 8, 1996 COMPLETED BY : D. S. Freeman TELEPHONE : (504) 464-3352 l

Reporting Period : December, 1995 ( NET MWe )

DAY Avg. Power Level DAY Avg. Power Level I

1 1,095 16 1,096 2 1,095 17 1,095 3 1,095 18 1,095 4 1,096 19 1,095 5 1,050 20 1,095 6 1,086 21 1,096 7 1,094 22 1,097 8 1,095 23 1,097 '

9 1,095 24 1,098 10 1,096 25 1,097 11 1,096 26 1,096 12 1,096 27 1,097 13 1,096 28 1,096 14 1,096 29 1,097 15 1,096 30 1,097 31 1,095 INSTRUCTIONS :

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

4 e

[Q kJNI $Nh

. . , , UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF PEPORT : January 8, 1996 COMPLETED BY : D. S. Freeman TELEPHONE : (504) 464-3352 REPORTING PERIOD : December, 1995 Date

  • Duration ** Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NONE l

TEE REASON F - Forced A - Equipment Failure (explain) I S - Scheduled B - Maintenance or Test )

C - Refueling D - Regulatory Restriction

      • E - Operator Training and METHOD License Examination 1 - Manual F - Administrative i 2 - Manual Scram G - Operational Error (exp1ain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period  ;

5 - Power Reduction 1 6 - Other (explain) l 1.1u96 page e or e