ML20107K973

From kanterella
Revision as of 14:41, 23 September 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Figure 2 Missing from EE-12-0009, Change in Matl of CRD & Orifice Assemblies, SAR Re CRD Mechanism.New Page Should Be Inserted in All Sets of Documentation Forwarded by
ML20107K973
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 02/04/1985
From: Lee O
PUBLIC SERVICE CO. OF COLORADO
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20107K978 List:
References
P-85047, NUDOCS 8502280458
Download: ML20107K973 (1)


Text

{ ..

PUBLIC SERVICE COMPANY OF COLORADO P. O. BOX 840 DENVER. COLORADO 50208 February 4, 1985 Oscan a. z.zz Fort St. Vrain VICE PRESIDENT g {

P-85047 Regional Administrator Region IV

)@$bk

)

U. S. Nuclear Regulatory Commission F312 085 611 Ryan Plaza Drive, Suite 1000 (

Arlington, Texas 76011 g \_ //

Attn: Mr. E. H. Johnson .

SUBJECT:

Additional Documentation Requested by NRC

REFERENCE:

PSC Letter, Lee to Johnson dated 1/30/85, (P-85032)

Dear Mr. Johnson:

Attached are 37 copies of Figure 2 in the Safety Analysis Report

.(Document No. EE-12-0009) which is associated with Attachment 2 of the referenced letter. In reviewing our copies of that letter it was noticed that many had a blank page instead of Figure 2. Please arrange to have these new pages inserted in all sets of documentation forwarded by the referenced letter which are missing Figure 2.

~If you have any questions, please contact Mr. M. H. Holmes at (303) 571-8409. .

Very truly yours, Vice President Electric Production 0RL/FWT:pa Attschment 8502280 0 850204 F"

        • ?" s '

Ph*jjc,wg n RI, fo