ML20126J361

From kanterella
Revision as of 10:01, 22 August 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Responds to Re Basis & Justification for Retraction of Commitment Made in Inspection Rept 50-482/88-14 on 880912
ML20126J361
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 12/30/1992
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20126J365 List:
References
NUDOCS 9301060128
Download: ML20126J361 (5)


See also: IR 05000482/1988014

Text

_ - _ _ _ _ _ - _ _ _ _ _ _ _ . _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - - _ - _ _ _ _ _ _ _ _ _ _ - _ - _ _ - _ _ _ _ _ _ - _ - _ _ - _ _ _ - _ _ _ _ _ _ _ _ _

UNITED STATES

ps Etog

g  ?,, NUCLEAR REGULATORY COMMISSION

i i E nEoloN IV

'

o 611 HYAN PL AZA oRIVE, sulTE 400

ARLINGTON, T EXAS 76011-8064

  • ...+

DEC 3 01992

Docket No. STN 50 482

License No. NPf-42

Wolf Creek Nuclear Operating Corporation

ATTN: Bart D. Withers

President and Chief Executive Officer

P.O. Box 411

Burlington, Kansas 66839

Gentlemen:

SUBJECT: 1988 SALP COMMITMENT RETRACTI0fl - NRC INSPECTION REPORT

NO. 50-482/88-14

We have reviewed your letter dated December 4, 1992, which provides the basis

and justification for the retraction of a commitment made in response to NRC

Inspection Report 50-482/88-14 dated September 12, 1988.

We acknowledge that recent organizational changes have precluded the need to

exchange technical information in the manner previously committed. The advent

of your System Engineering Group and the planned changes to be implemented by

the Performance Enhancement Program appear to have created the necessary

environment to ensure that adequate communications between the Engineering and

Plant Operations organizations will be accomplished by these programs.

Should you have any questions concerning this letter, please contact Mr. A, T.

Howell at (817) 860-8180.

Sincerely,

i

/.A Bill Beach, Director

Division of Reactor Projects

cC;

Wolf Creek Nuclear Operating Corp.

ATTN: Otto Maynard, Director

Plant Operations

P,0. Box 411

Surlington, Kansas 66839

9301060128 921230

PDH ADOCK 05000482

0 pon_

D

v

.

.

Wolf Creek Nuclear Operating -2-

Corporation

Shaw, Pittman, Potts & Trowbridge

ATTN: Jay Silberg, Esq.

2300 M Street NW

Washington, D.C. 20037 l

Public Service Commission

ATTN: C. John Renken

Policy & Federal Department

P.O. Box 360

Jefferson City, Missouri 65102 ,

U.S. Nuclear Regulatory Commission .

ATTN: Regional Administrator, Region ill '

799 Roosevelt Road

Glen Ellyn.. Illinois 60137

Wolf Creek Nuclear Operating Corp.

ATTN: Kevin J. Moles

Manager Regulatory Services

P.O. Box 411

Burlington, Kansas 66839.

Kansas Corporation Commission

ATTN: _ Robert Elliot,. Chief Engineer

Utilities Division  ;

1500 SW Arrowhead Rd. t

-Topeka, Kansas 66604-4027

_?

Office of the Governor ,

State of Kansas -4

- Topeka, Kansas 66612

Attorney General  :

1st Floor - The Statehouse  ;

Topeka, Kansas 66612  :

Chairman. Coffey County Commission

Coffey County Courthouse- .

- Burlington,- Kansas 66839-1798

- Kansas Department of Health

and- Environment.:-

Bureau of_-Air Quality & Radiation

'

-Control; .

'

ATTN: - Gerald Allen, Public .

Health Physicist

Division of Environment- a

Forbes Field Building 321

~ Topeka, Kansas f66620

..

1

l

,

-

f

.

.

-3-

'

Wolf Creek Nuclear Operating

Corporation .

t

Kansas De)artment of Health and Environment I

ATTN: Ro;ert Eye, General Counsel  :

LSOB, 9th floor

900 SW Jackson

Topeka, Kansas 60612

.

.

>

i

F

-h

.

i

2

.

!

l1

l

?

.-

o  :

. . . - .... . . - . . . _ -_.........__.m.-... _ _ - . . _ . . _ . _ - . . . - , . _ _ . - - . . . . _ - . . , . _ . _ . . , . _ . . . . _ . . . _ . , - . _ , . . - - - _ - .

_ _ . . _ _ _ . _ . . . . _ _ _ _ _

,

?

i

i

l

l

!

l

l

l

,

,

!

.

1

' '

,

Wolf Creek Nuclear Operating -4- DEC 3 0 H)32

l Corporation

l

l

l

bcc to DMB (lE40)

bcc distrib. by RIV:

J. L. Milhoan Resident inspector

Section Chief (DRP/D) DRP (2)

DRSS-FIPS Section Chief (Rlli, DRP/3C)

RIV file- SRI, Callaway, Rill

MIS System Lisa Shea, RM/Alf, MS: MNBB 4503

Project Engineer (DRP/D) Section Chief (DRP/TSS)

ORS C. A. Hackney

The Chairman (MS: 16-G-15) Records Center, INP0

Commissioner Rogers (MS: 16-G-15) G. F. Sanborn, E0

Commissioner Curtiss (MS: 16-G-15) Ann Mattila

Commissioner Remick (MS: 16-G-15) RRis at all sites

Commissicner de Planque (MS: 16-G-15) L. J. Callan, D:DRSS

J. M. Taylor, ED0 (MS: 17-G-21) J. P. Jaudon DRSS

J. M. Montgomery B. Murray, DRSS

J, T. Gilliland, PA0

l

l

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _

,

i

Wolf Creek fluclear Operating -4- DEC 30 IM

Corporation

bec to DMB (IE40)

bec distrib. by RIV:

J. L. Milhoan Resident inspector

Section Chief (DRP/D) DRP (2)

DRSS-flPS Section Chief (Rlli, DRP/30)

RIV file SRI, Callaway, Rill

MIS System Lisa Shea, RM/Alf, MS: MfiBB 4503

Project Engineer (DRP/D) Section Chief (DRP/TSS)

DRS C. A. Hackney

The Chairman (MS: 16-G-15) Records Center, IfiP0

Commissioner Rogers (MS: 16-G-15) G. F. Sanborn, E0

Commissioner Curtiss (MS: 16-G-15) Ann Mattila

Commissioner Remick (MS: 16-G-15) RRis at all sites

Commissioner de Planque (MS: 16-G-15) L. J. Callan, 0:DRSS

J. M. laylor, EDO (MS: 17-G-21) J. P. Jaudon, DRSS

J. M. Montgomery B. Murray, DRSS

J. T. Gilliland, PA0

i

I

RIV:DRP/DN

h (

D:W

C:DRP/DS

MASatorius;df Alliogl'1 )AB beach

12/p/92

%()/ ig /y; /4

.. . - . _ _ _

. _ _

.