ML22187A188

From kanterella
Revision as of 08:37, 18 July 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Fuel Fabrication Facility - Inspection Schedule for Calendar Year 2023
ML22187A188
Person / Time
Site: Westinghouse
Issue date: 07/06/2022
From: Eric Michel
NRC/RGN-II/DFFI
To: Annacone M
Westinghouse
References
Download: ML22187A188 (3)


Text

July 6, 2022 Mr. Mike Annacone Vice President, Columbia Fuel Operations and Manager, Columbia Plant Westinghouse Electric Company 5801 Bluff Road Hopkins, SC 29061

SUBJECT:

COLUMBIA FUEL FABRICATION FACILITY - INSPECTION SCHEDULE FOR CALENDAR YEAR 2023

Dear Mr. Annacone:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at the Columbia Fuel Fabrication Facility in calendar year 2023.

The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that any regional initiative or reactive inspections are not included in the schedule.

If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Thomas Vukovinsky at (404) 997-4622 with any questions or concerns you may have regarding this letter or the inspection schedule.

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html, and at the NRC Public Document Room, in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Eric C. Digitally signed by Eric C. Michel Michel 13:17:36 -04'00' Date: 2022.07.06 Eric C. Michel, Chief Projects Branch 2 Division of Fuel Facility Inspection Docket No. 07001151 License No. SNM-1107

Enclosure:

As stated cc w/ encl: Distribution via LISTSERV

M. Annacone

SUBJECT:

COLUMBIA FUEL FABRICATION FACILITY - INSPECTION SCHEDULE FOR CALENDAR YEAR 2023 DISTRIBUTION:

A. Masters, RII/DFFI A. Rivera-Varona, NMSS/DFM E. Michel, RII/DFFI J. Rubenstone, NMSS/DFM J. Tobin, NMSS/DFM J. Zimmerman, NMSS/DFM T. Vukovinsky, RII/DFFI

2023 U.S. NUCLEAR REGULATORY COMMISSION INSPECTION/ACTIVITY PLAN FOR COLUMBIA FUEL FABRICATION FACILITY Dates Number of Description/Inspection Procedures (IPs)

Inspectors January 30 - February 2 1 Nuclear Criticality Safety 1 (IP 88015)

March 20 - 23 2 Fire Protection (IP 88055)

April 17 - 20 2 Operational Safety 1 (IP 88020)

September 18 - 21 1 Nuclear Criticality Safety 2 (IP 88015)

October 2 - 5 2 Material Control and Accounting (Various IPs)

November 27 - 30 3 Operational Safety 2 (IP 88020)

Plant Modifications - Annual (IP 88070)

To Be Determined 3 Evaluation of Exercises and Drills (IP 88051)

Enclosure