|
---|
Category:Letter
MONTHYEARIR 05000482/20244202024-10-31031 October 2024 Security Baseline Inspection Report 05000482/2024420 ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML23345A1602024-05-0909 May 2024 Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report ML24109A1212024-04-18018 April 2024 (WCGS) Form 5 Exposure Report for Calendar Year 2023 IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 ML24114A1442024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37 ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information ML24098A0052024-04-0707 April 2024 2023 Annual Environmental Operating Report ML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24089A1352024-03-29029 March 2024 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes ML24074A3312024-03-14014 March 2024 Missed Quarterly Inspection Per 40 CFR 266 Subpart N IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 ML24080A3452024-03-11011 March 2024 7 of the Wolf Creek Generating Station Updated Safety Analysis Report ML24016A0702024-03-0808 March 2024 Issuance of Amendment No. 240 Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML24068A1992024-03-0707 March 2024 Changes to Technical Specification Bases - Revisions 93 and 94 ML24066A0672024-03-0505 March 2024 4-2022-024 Letter - OI Closure to Licensee ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 ML24059A1702024-02-28028 February 2024 Annual Fitness for Duty Program Performance Report, and Annual Fatigue Report for 2023 ML24026A0212024-02-27027 February 2024 Issuance of Amendment No. 239 Modified Implementation Date of License Amendment No. 238 ML24050A0012024-02-19019 February 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) 2024-09-06
[Table view] Category:Operating Report
[Table view] |
Text
Ron Benham Director Nuclear and Regulatory Affairs March 28, 2022 RA 22-0029 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Reference:
Westinghouse Letter SAP-LOCA-TM-A5-000001, dated February 7, 2022, Wolf Creek 10 CFR 50.46 Annual Notification and Reporting for 2021
Subject:
Docket No. 50-482: 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes Commissioners and Staff:
In accordance with 10 CFR 50.46, Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors, paragraph (a)(3)(ii), Wolf Creek Nuclear Operating Corporation (WCNOC) is submitting the attached information to fulfill the annual reporting requirement for the Wolf Creek Generating Station (WCGS).
WCNOC has reviewed the above Reference, which addresses 10 CFR 50.46 reporting information pertaining to the Emergency Core Cooling System (ECCS) Evaluation Model changes that were implemented by Westinghouse for 2021. The Evaluation Model changes and errors (except any plant-specific errors in the application of the model) have been provided to the NRC via Westinghouse letter. The review concludes that there were no plant specific changes to, or errors in, the Evaluation Models on the limiting transient peak cladding temperature (PCT) for 2021.
The Attachment provides PCT rack-up forms for the calculated Large Break Loss-of-Coolant Accident (LOCA) and Small Break LOCA PCT margin allocations in effect for the 2021 WCGS Evaluation Models. The PCT values determined in the Large Break and Small Break LOCA analyses of record, combined with all of the PCT allocations, remain below the 10 CFR 50.46(b)(1) regulatory limit of 2200 °F. Therefore, WCGS is in compliance with 10 CFR 50.46 requirements and no reanalysis or other action is required.
P.O. Box 411 l Burlington, KS 66839 l 620-364-8831
RA 22-0029 Page 2 of 2 This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4204.
Sincerely, Ron Benham RDB/rlt
Attachment:
Emergency Core Cooling System (ECCS) Evaluation Model Peak Cladding Temperature (PCT) Margin Utilization Rack-up Forms cc: S. S. Lee (NRC), w/a S. A. Morris (NRC), w/a G. E. Werner (NRC), w/a Senior Resident Inspector (NRC), w/a
Attachment to RA 22-0029 Page 1 of 3 Emergency Core Cooling System (ECCS) Evaluation Model Peak Cladding Temperature (PCT) Margin Utilization Rack-up Forms LOCA Peak Cladding Temperature (PCT) Summary Plant Name: WOLF CREEK EM: NOTRUMP AOR
Description:
Appendix K Small Break Summary Sheet Status: Current WOLF CREEK SAP_LOCA-50.46_SAP_Base_Appendix_K_SBLOCA - 1.1 V.V PCT (°F) Reference # Note #
ANALYSIS-OF-RECORD 936 1 Delta PCT Reporting ASSESSMENTS* (°F) Reference # Note # Year**
- 1. Loose Part Evaluation 45 2 (a) 1990 AOR + ASSESSMENTS PCT = 981.0 °F
- The licensee should determine the reportability of these assessments pursuant to 10 CFR 50.46.
- The Reporting Year refers to the annual reporting year in which this assessment was included.
REFERENCES 1 WCAP-16717-P, Rev. 0, Wolf Creek Generating Station (SAP), MSIV/MFIV Replacement Project, Small Break Loss of Coolant Accident Analysis Engineering Report, January 2007.
2 SAP-90-148/NS-OPLS-OPL-I-90-239, Wolf Creek Nuclear Operating Corporation, RCS Loose Part Evaluation, April 1990.
NOTES:
(a) This penalty will be carried to track the loose part which has not been recovered.
Attachment to RA 22-0029 Page 2 of 3 LOCA Peak Cladding Temperature (PCT) Summary Plant Name: WOLF CREEK EM: ASTRUM (2004)
AOR
Description:
Best Estimate Large Break Summary Sheet Status: Current WOLF CREEK SAP_LOCA-50.46_SAP_Base_ASTRUM - 1.2 V.V PCT (°F) Reference # Note #
ANALYSIS-OF-RECORD 1900 1 Delta PCT Reporting ASSESSMENTS* (°F) Reference # Note # Year**
- 1. Containment Fan Cooler Capacity 0 2,4 (a) 2014
- 2. Decay Group Uncertainty Factors
-10 3 2014 Errors AOR + ASSESSMENTS PCT = 1890.0 °F
- The licensee should determine the reportability of these assessments pursuant to 10 CFR 50.46.
- The Reporting Year refers to the annual reporting year in which this assessment was included.
REFERENCES 1 WCAP-17107-P, Revision 1, Best-Estimate Analysis of the Large-Break Loss-of-Coolant Accident for the Wolf Creek Nuclear Power Plant Using the ASTRUM Methodology, January 2014.
2 LTR-LIS-14-400, 10 CFR 50.46 Report for the Wolf Creek Large Break LOCA Evaluation of the Change in Containment Cooling Capacity, August 2014.
3 LTR-LIS-14-492, Wolf Creek Unit 1 10 CFR 50.46 Report for the Correction of the Decay Group Uncertainty Factors Errors, November 2014.
4 LTR-LIS-19-282, Wolf Creek 10 CFR 50.46 PCT Summary Sheet Updates for Replacement Fan Cooler Tube Bundles Installation and Planned Retirement of Cycle 23 Sheets, August 2019.
NOTES:
(a) The estimated effect includes the corrected fan cooler heat removal rates and implementation of replacement tube bundles in the containment fan coolers, which were installed for Cycle 24.
Attachment to RA 22-0029 Page 3 of 3 10 CFR 50.46 Reporting SharePoint Site Check:
EMs applicable to Wolf Creek:
Realistic Large Break - ASTRUM (2004)
Appendix K Small Break - NOTRUMP 2021 Issues Transmittal Letter Issue Description None None