MONTHYEARML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 ML20198L4671998-01-0202 January 1998 SER Approving Request for Relief VRR-4B to Inservice Testing Program Wisconsin Electric Power Co,Point Beach Nuclear Plant,Units 1 & 2 ML20197J9341997-12-12012 December 1997 Safety Evaluation Accepting Licensee Request for Relief from Performing Inservice Volmetric Exam of Inaccessible Portions of RPV Lower Shell to Lower Head Ring Weld During 10-yr ISI Interval of Plant,Unit 2 ML20137U4991997-04-10010 April 1997 Safety Evaluation Accepting Proposed Alternatives Contained in Requests for Relief RR-1-17 & RR-2-21 ML20129G6901996-10-0303 October 1996 SER Accepting Request for Relief from ASME Code Repair Requirements for ASME Code Class Three Piping at Plant ML20062J4991993-10-28028 October 1993 Safety Evaluation Granting IST Relief Requests Per 10CFR50.55a(a)(3)(ii) & 10CFR50.55a(f)(4)(iv) ML20062F1361990-09-25025 September 1990 SE Accepting Util Responses to Generic Ltr 83-28,Item 1.2, Post-Trip Review - Data & Info Capability ML20248A0101989-09-18018 September 1989 Safety Evaluation Re Containment Liner Leak Chase Channel Venting.Concurs W/Licensee That Plant Does Not Need to Vent Containment Liner Weld Leak Chase Channels During Test ML20246H0121989-07-0707 July 1989 Safety Evaluation Accepting Util 880325 & 1117 Responses to NRC Bulletin 88-002, Rapidly Propagating Fatigue Cracks in Steam Generator Tubes ML20245B0311989-06-14014 June 1989 Safety Evaluation Supporting Util Response to Generic Ltr 83-28,Item 4.5.3 Re on-line Functional Testing of Reactor Trip Sys.Existing Intervals for on-line Functional Testing Consistent W/High Reactor Trip Sys Availability ML20207E4191988-08-0404 August 1988 Safety Evaluation Supporting Compliance W/Atws Rule 10CFR50.62, Requirements for Reduction of Risk from ATWS Events for Light Water Cooled Nuclear Power Plants ML20151R6771988-08-0202 August 1988 Safety Evaluation Granting Request for Relief from ASME Code,Section XI Evaluation Requirements ML20151N2191988-07-27027 July 1988 Safety Evaluation Supporting Util Proposal Re Design of Switchgear Room,Per Sections Iii.G & Iii.L of App R to 10CFR50 ML20150C1311988-06-21021 June 1988 Safety Evaluation Accepting Responses to Generic Ltr 83-28, Item 2.1,confirming That Program Exists for Identifying, Classifying & Treating Components Required for Performance of Reactor Trip Function as safety-related ML20154H5791988-05-12012 May 1988 Safety Evaluation Supporting Conclusions That Rev 1 to Offsite Dose Calculation Manual (ODCM) Uses Methods Consistent W/Staff Requirements,However Some Discrepancies Identified.Odcm & Environ Manual Should Be Revised ML20148H4551988-03-24024 March 1988 Safety Evaluation Accepting Util 840405 Response to Generic Ltr 83-28,Item 2.1,(Part 2) Re Vendor Interface Programs & Reactor Trip Sys Components ML20235K9241987-07-0909 July 1987 Safety Evaluation Re Reactor Pressure Vessel Flaw.Flaw Conditionally Acceptable Per Subarticle IWB-3123 of Section XI of ASME Code & Therefore Requires Augmented Inservice Insps Based on 10CFR50.55(g)(4) ML20213G5801987-05-0707 May 1987 Safety Evaluation Re Util 861027 Request for Relief from Exam Requirements of Section XI of ASME Boiler & Pressure Vessel Code for Shell & Nozzle Welds in Regenerative Hxs. Request Granted ML20206K6011987-04-10010 April 1987 SER Supporting Util 860513 Proposed Replacement of Hydraulic Snubbers W/Energy Absorbers on Main Steam Bypass Line ML20210P2781987-02-0505 February 1987 Safety Evaluation Supporting Util 831107 & 860411 Responses to Generic Ltr 83-28,Item 4.5.2 Re Reactor Trip Sys Reliability on-line Testing.Plant Designed to Permit on-line Functional Testing of Diverse Trip Features of Breakers ML20214U6081986-11-26026 November 1986 Safety Evaluation Supporting Util 850516 Capsule T Summary Rept Re Use of Reactor Vessel Pressure Temp Limits Specified in Figures 15.3.1-1 & 15.3.1-2 of Tech Specs.Temp Limits Valid & May Continue to Be Used ML20206S7091986-09-16016 September 1986 Safety Evaluation on Util 850426 Response to Open Items Re Generic Ltr 81-14, Seismic Qualification of Auxiliary Feedwater Sys (Afws). Reasonable Assurance Exists That Afws Will Perform Required Safety Function Following SSE ML20214L9311986-09-0404 September 1986 Corrected Safety Evaluation Re Projected Values of Matl Properties for Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events.Licensee Projections Acceptable ML20207D6781986-07-11011 July 1986 Safety Evaluation Accepting Util Responses to Generic Ltr 82-33 Re post-accident Monitoring Instrumentation Compliance W/Guidelines of Reg Guide 1.97,Rev 2,subj to Listed Condition.Portions of Rev 1 to EGG-EA-6771 Encl ML20138N7801985-10-31031 October 1985 Safety Evaluation Granting Util 840706 Relief Requests for Second 10-yr Inservice Insp Interval.Review of Requests for Relief from ASME Code Section XI Requirements Summarized in Encl Tables ML20134A4821985-10-24024 October 1985 Safety Evaluation Supporting Util Response to Generic Ltr 83-28,Items 3.1.1,3.1.2,4.1 & 4.5.1 Re post-maint Testing (Reactor Trip Sys Components) & Reactor Trip Sys Reliability.Programs Outlined in Acceptable ML20134A6051985-10-22022 October 1985 Safety Evaluation Re Util 831107 & 850910 Responses to Generic Ltr 83-28,Item 1.1, Post-Trip Review Program Description & Procedures. Program & Procedures Acceptable ML20138H1721985-10-18018 October 1985 Safety Evaluation Accepting Util 831107 Response to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Re post-maint Testing ML20133G4171985-07-29029 July 1985 Safety Evaluation Accepting Util 831108 Response to Generic Ltr 83-28,Item 1.1 Re post-trip Review.Response to Listed Deficiencies,Including Development of Systematic Safety Assessment Program for Unscheduled Reactor Trips Required ML20129H7871985-05-16016 May 1985 Safety Evaluation Supporting Licensee Response to Generic Ltr 83-28,Items 4.2.1 & 4.2.2 Re Reactor Trip Sys Reliability,Provided Corrective Action Taken If Higher than Normal Valves Observed in Trip Force & Response Time Values ML20205H2171984-09-10010 September 1984 Supplemental Safety Evaluation Re Util 820820 & 860113 Requests for Relief from Inservice Insp Requirements. Volumetric Exam Acceptable Method for Detecting O.D. Initiated Flaws.Relief from Surface Exams Should Be Granted ML20204F5381983-04-25025 April 1983 Safety Evaluation of Util Preferred Ac Power Sys Conformance GDC 17.Proximity of Low Voltage Transformers Does Not Fully Meet GDC 17 Requirements for Physical Separation,But Deluge Sprinkler Sys Adequate 1999-09-15
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
-
cl4109~%
UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION
, h' $ WASH'NGTON, D. C 20S55 k**..,/
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION WISCONSIN ELECTRIC POWER COMPANY P0 INT BTACH NUCLEAR PLANT, UNIT NOS. 1 AND 2' DOCKET NOS. 50-266 AND 50-301 REQUESTS FOR RELIEF FROM ASME CODE SECTION XI EVALUATION REQUIREMENTS I. BACKGROUND In a letter dated January 25, 1988, as supplemented by letter dated May 31, 1988, Wisconsin Electric Power Company (the licensee) requested relief from the examina-tion requirements of the 1977 Edition through Summer 1979 Addenda of Section XI of the ASME Boiler and Pressure Yessel Code to conduct Category B-L-1 and B-L-2 examinations on the Units 1 and 2 reactor coolant pump casings. The licensee provided information in support of its determination that the code requirements were impractical to perform, and proposed an alternative to the code requirements.
In accordance with 10 CFR 50.55a(g)(6)(1), the staff has evaluated the licensee's determinations and proposed alternative examinations. The relief requests, the code requirements, the licensee's determinations, and our bases for granting the reliefs are contained herein.
II. RELIEF REQUESTS AND SUPPORTING INFORMATION A. Relief Request RR-1-13 and RR-2-13
- relief from perfonning a volumetric examination of reactor coolant pump casings.
- relief from performing a visual examination of the reactor coolant pump interior pressure boundary surfaces.
B. Exam Area Three circumferential pressure-retaining welds on the reactor coolant pump casing.
C. ASME Section XI Category Number and Examination Requirement B-L-1: "The examinations perfonned during each inspection interval shall include 100% of the pressure-retaining welds in et least one pump in each (e.g. group of pumps recirculating coolantperfonning)similar pumps ." The exam functions method in system shall be volumetric. -
B-L-2: "One pump in each of the group of pumps performing similar func-tions in the system shall be examined during each inspection interval. This examinction may be performed on the same pump selected for the category B-L-1 examination." The exam method shall be visual.
8808120248 880802 PDR ADOCK 05000266 P PNU
. . D. Alternative Examinations Proposed by Licensee (a) A visual (VT-2) examination of the casing exterior will be performed in conjunction witn the system leakage test every outage and each system hydrostatic test.
(b) If maintenance or operational problems are encountered which necessi-tate disassembly of the casing internals of either pump, a VT-1 examina-tion of the interior casing surface will be performed. If a pump is not disassembled, this commitment will extend to the next inspection interval.
(c) If a pump is disassembled to the extent that a radiographic examination is practical and a miniature linear accelerator (MINAC) is available, the code-required volumetric examination will be performed.
(d) Once each interval, an exterior surface examination of approximately one-third of the accessible pump casing weld surface will be conducted in conjunction with a 100% exterior visual examination (VT-1). If the code-required examination is perfonned as discussed in Item (c) above, this examination is not necessary.
Furthermore, the licensee stated that vibration monitors are currently installed on the motor frame near the lower radial bearing and on the motor shaft above each pump casing. These monitors will alarm on panel C04 in the control room if either detects high vibration. The PBNF Operating Procedures Manual provides reactor coolant pump (RCP) vibration limits. If the limits are exceeded, the licenste would expect to shut down the RCP's and determine the cause. These monitors would most likely detect any problem which could lead to pump casing, welds, or rotating element failure.
(e) Licensee's Reason for Limitation The two reactor coolant pumps (RCP) at each Point Beach unit are Westinghouse Model 93 pumps. Each pump casing is fabricated by welding four stainless steel (SA351 CF8) castings together. Thus, there are three.circumferential pressure-retaining welds that are to be volumetrically inspected in accordance with Category 8-L-1.
Because the physical properties of the stainless steel castings and weld material prevent meaningful ultrasonic examination, the casing welds must be inspected using the miniature linear accel-erator (MINAC).
To date, the licensee has not attempted any ultrasonic examinations of the reactor coolant pump casing welds. They believe that ultrasonic testing of the welds is impractical based on both their past experi-ence witn UT on other st31nless steel castings and on past industry experience. However, because the NRC staff considers the impracti-cality of ultrasonic testing to be plant-specific, the licensee will attempt ultrasonic testing on one weld of a Unit I reactor coolant
?
pump during the spring 1989 refueling outage. Should it prove to be a practical method for volumetric e' amination of the casing welds, the licensee would propose to complete he ASME Section XI category B-L-1 examination using the ultrasonic meti.od on both Unit 1 and Unit 2.
However, in that testing may very well demoastrate that ultrasonic testing will be impractical, the licensee requested that these relief requeste be approved.
This radiographic examination is performed by placing the MINAC inside the pump casing and placing the film on the outside of the pump. To
, perform the examination, the pumps must be completely disassembled.
Disassembly to this extent is far beyond any disassembly expected except for this examination. Also, insulation on the casing exterior must be removed for film placement. Additionally, the pump bowl must be dry for installation of the MINAC. Therefore, all fuel assemblies must be removed from the reactor vessel, and reactor vessel water level lowered to below the vessel nozzles. Complete disassembly of the pump is also required to conduct the VT-1 examination in accordance with Category B-L-2.
This radiographic examination using the MINAC was performed on Point Beach Unit 1 "B" RCP during the fall 1981 refueling outage. In addi-tion, the same examination has been performed at several other sites.
No problems have been found with the welds at any site. Additionally, no problems have been found during the Category B-L-2 visual examina-tion. This examination was conducted at PBNP by using the video camera on the MINAC.
The licensee believes that performing a volumetric examination of the Point Beach reactor coolant pump casing welds and a visual examination of the interior pressure retaining surface of one pump per unit during the second 10 year inspection period does not provide an increase in safety commensurate with the associated cost potential for inadvertent pump damage and expected radiation exposure. The following items have been considered by the licensee:
- 1. Radiation Levels Currently the average dose rates at the RCP are:
l l 8' elevation general area < 1 - 25 mR/hr Below RCP 10 - 800 mR/hr in RCP 700 - 10,000 mR/hr
- 2. Total _ Estimated Exposure During the Examination l
l The whole body doses received during the fall 1981 examination of Unit 1, RCP-B are listed below. This list does not include j
the additional dose received while Getting the plant to a con-
' dition where RCP disassembly could be performed (e.g., complete core unload).
l
t
-4"
. - PBNP maintenance personnel during disassembly 5,237 mR
- Contractor personnel - diffuser adapter removal 3,890 mR
- Contractor examination personnel 12,626 mR
- Contractor personnel - insulation removal / replacement 4,490 mR
- Contractor personnel - diffuser adapter replacement 1,833 mR
- PBNP Maintenance personnel - reassembly 6,017 mR TOTAL 34,093 mR
- 3. Pump Disassembly The Category B-L-1 and B-L-2 examinations require complete disassembly of the pump. The pump manufacturer (Westinghouse) does not require or recommend pump disassembly to perform normal maintencnce or inspections. The only time disassembly to this degree has ever occurred was to perform this examination during the fall of 1981. Therefore, very limited experience in this area may result in significant damage or degradation to the pump.
Additionally, complete pump disassembly is not anticipated for any other reason in the foreseeable future.
- 4. Pump Performance The type of material used in these pumps is widely used throughout the industry and has performed very well. There have been no reported problems or failures with the casing welds of these model pumps. Additionally, the licensee has had no operational problems l
with the RCP's which could indicate potential degradation of the casing welds.
- 5. Excessive Cost l The estimated cost to disassemble / reassemble the pump, remove and
- reinstall insulation and to perform the examination is approx-imately $810,000. Additionally, this examination is expected to l extend the refueling outage a minimum of 5 days. Therefore,
! replacement power costs would be a mirimum of about $1.5 million.
l Any minor problems which might occur could significantly increase the cost of the examination.
III. STAFF EVALUATION AND CONCLUSION Based on the pumps' design, materials of construction, and internal inaccessi-blity, the staff finds the Code requirements to be impractical to perform.
The licensee's proposed alternate examinations will provlde a high degree of cer-tainty of the pumps' structural integrity. The staff Le<ludes that relief from the volumetric examination of the pumps' casing welds and visual examination of the internal surfaces should be granted provided the proposed alternative examinations are substituted.
l
1
- Based on the review summarized, the staff concludes that the relief granted from the examination requirements and the alternate methods imposed through this document give reasonable assurance of the component pressure boundary and support structural integrity. Purusant to 10 CFR 50.55a(g)(6)(i), and based on the alternatives discussed above, the staff finds that the relief requested is authorized by law and will not endanger life or property, or the common defense and security, and is otherwise in the public interest considering the burden that could result if it were imposed on the facility.
Date:
Principal Contributors: D. Wagner M. Hum l
. _ _ . _ - _ . - . . _ .-- --_ .- -