Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N8911999-10-15015 October 1999 Forwards Rept of Changes,Tests & Experiments at Pilgrim Nuclear Power Station for Period of 970422-990621,IAW 10CFR50.59(b).List of Changes Effecting Fsar,Encl ML20217D3951999-10-13013 October 1999 Forwards Request for Addl Info Re Util 990806 Submittal on USI A-46, Implementation Methodology Used at Pilgrim Nuclear Power Station, Per GL 87-02 ML20217E1581999-10-0808 October 1999 Forwards Insp Rept 50-293/99-05 on 990726-0905.Three Violations Noted & Being Treated as Ncvs.Violations Include Failure to Assure That Design Bases Correctly Translated Into Specifications ML20217C3151999-10-0606 October 1999 Forwards Scenario Package for Pilgrim Nuclear Power Station Nrc/Fema Evaluated Exercise Scheduled for 991207.Without Encl ML20217D5591999-10-0505 October 1999 Documents Pilgrim Nuclear Power Station Five Yr Survey of Main Breakwater.Survey Has Determined That Pilgrim Main Breakwater Is Intact & Remains Adequately Constructed to Perform Designed Safety Function ML20217C8051999-10-0505 October 1999 Forwards Proprietary Results of Audiologic Evaluations for Jp Giar,License SOP-10061-3.Attachment Clearly Shows Requirements for Operator Hearing Ability Are Met. Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML20212J8301999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Integrate Performance Info & to Plan Insp Activities at Facility Over Next Six Months ML20216J9961999-09-29029 September 1999 Forwards Resume of Person Identified as Acting RPM in Licensee to NRC Re Notification That Person Named in License Condition 11 of 20-07626-02,is No Longer Employed at Pilgrim Station.Resume Withheld,Per 10CFR2.790 ML20212F7871999-09-24024 September 1999 Advises That Util 990121 Application for Amend Being Treated as Withdrawn.Proposed Changes Would Have Modified Facility UFSAR Pertaining to Values for post-accident Containment Pressure Credited in Pilgrim Net Positive Head Analyses ML20212H1381999-09-23023 September 1999 Submits Info in Support of Request Filed on 990730 to Grant one-time Exemption from 10CFR50,App E,Authorizing Biennial Full Participation Emergency Preparedness Exercise to Be Conducted in 2002 Instead of 2001 ML20212H1441999-09-23023 September 1999 Withdraws 990121 Request for License Change Re Emergency Core Cooling Sys Net Positive Suction Head,Due to Incorrect Datum Preparation ML20216F3451999-09-16016 September 1999 Forwards Summary Rept Providing Results of ISI Conducted at PNPS on-line & Refueling Outage (RFO 12) ML20212C2861999-09-16016 September 1999 Forwards SER Accepting Licensee 981123 Request for Relief RR-E1,RR-E5,RR-E6 Pursuant to 10CFR50.55a(a)(3)(i) & Request for Relief RR-E2,RR-E3 & RR-E4 Pursuant to 10CFR50.55a(a)(3)(ii) ML20216E7111999-09-0909 September 1999 Forwards License Renewal Application Including Form NRC-398 & Form NRC-396 for Jp Giar,License SOP-10061-3.Without Encls ML20216E5891999-09-0707 September 1999 Forwards Copy of Pilgrim Station Organization Structure. Encl Refelcts Changes in Upper Mgt Level Structure.Changes Were Effective 990901 ML20211M4501999-09-0303 September 1999 Informs That Pilgrim Nuclear Power Station Plans to Conduct Full Participation Emergency Preparedness Exercise with Commonwealth of Ma on 991207,IAW 10CFR50,App E,Section IV.F.2 ML20211M9161999-08-31031 August 1999 Submits Review & Correction of Info in Reactor Vessel Integrity Database (Rvid),Version 2,re Pilgrim Station ML20211J8391999-08-30030 August 1999 Forwards Rev 1 to Provisional Decommissioning Trust Agreement for Plant,Changing Portions of Agreement to Permit Up to Two Distributions & Clarify Formula for Distribution ML20211H5701999-08-27027 August 1999 Forwards Insp Rept 50-293/99-04 on 990610-0725.Two Violations Identified Being Treated as non-cited Violations ML20211C3381999-08-19019 August 1999 Provides semi-annual LTP Update,Including Schedule, Commitment Descriptions,Progress Since Last Update & Summary of Changes.Rev Bars Indicate Changes in Status Since Last Submittal ML20210U5761999-08-18018 August 1999 Responds to Opposing Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts. Informs That for Sale,Nrc Responsible for Only Ensuring That Entergy Technically & Financially Qualified to Operate NPP ML20210U6691999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opposing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U7521999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opossing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U5151999-08-17017 August 1999 Forwards Notice of Withdrawal of Application for Approval of Indirect Transfer of FOL for Pilgrim in Response to .Approval No Longer Needed Since Beco Sold Interest in Pilgrim to EOI on 990713 ML20211B3841999-08-16016 August 1999 Forwards Response to NRC Second RAI Re Pressure Locking & Thermal Binding of SR power-operated Gate Valves ML20210U4831999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data Sheets for Period of 990101-0630,per 10CFR26.71(d) ML20210S0891999-08-0909 August 1999 Forwards Amend 11 to Indemnity Agreement B-48 Signed by Boston Edison Co & Entergy Nuclear Generation Co ML20210R6251999-08-0606 August 1999 Provides Supplementary Info on USI A-46 Implementation Methodology at Pilgrim Station,To Enable NRC to Perform Evaluation & Issuance of Plant Specific SER for Plant ML20210M9411999-08-0202 August 1999 Requests That NRC Treat Pending Actions Requested by Beco Prior to 990713,as Requests Made by Entergy.Ltr Requests That Minor Administrative Changes to License Amend 182 & Associated Ser, ,reflect 990713 Transfer ML20210H8761999-07-30030 July 1999 Requests That NRC Grant Exemption from Requirements of 10CFR50,App E,Section IV F,Which Would Authorize Rescheduling of 2001 Biennial Full Participation Emergency Preparedness Exercise for Pilgrim Station to 2002 ML20210H8661999-07-29029 July 1999 Provides Revised Response to GL 96-06 & Addresses NRC Insp Concern for Containment Penetration X-12.Info Submitted to Facilitate NRC Review & Closeout of Subject GL for Plant ML20216E2321999-07-26026 July 1999 Discusses GL 92-01,rev 1,suppl 1, Rv Structural Integrity. NRC Revised Info in Rvid & Releasing as Rvid Version 2 ML20216D4131999-07-22022 July 1999 Informs That J Conlon,License OP-11040-1,terminated Employment with Beco on 990703,per 10CFR50.74.Individual Will Not Participate in Util Licensed Operator Requalification Training Program ML20210E2231999-07-20020 July 1999 Discusses Arrangements Made by Dennis & M Santiago During 990615 Telephone Conversation for NRC to Inspect Licensed Operator Requalification Program at Pilgrim During Wk of 991004 ML20210C4151999-07-19019 July 1999 Informs That Util Intends to Submit Approx Eight Licensing Actions in FY00 & Eight in FY01,in Response to Administrative Ltr 99-02.Actions Are Not Expected to Generate Complex Reviews ML20210F3711999-07-14014 July 1999 Informs NRC That Effective 990713,listed Pilgrim Station Security Plans Have Been Transferred from Boston Edison to Entergy & Are Still in Effect ML20210A9441999-07-14014 July 1999 Responds to Re Changes to Pilgrim Nuclear Power Station Physical Security Plan Identified as Issue 2,rev 14, Addendum 1,respectively.No NRC Approval Is Required IAW 10CFR54(p) ML20209G2251999-07-0909 July 1999 Forwards Insp Rept 50-293/99-03 on 990419-0609.Five Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C. Several Individual Tagging Errors Occurred ML20209C4661999-07-0707 July 1999 Forwards SE Accepting Addendum on Proposed Change in Corporate Ownership Structure Involving Entergy Nuclear Generation Co ML20209C7761999-07-0606 July 1999 Submits Annual Summary Rept of Changes Made to QAP Description as Described in QA Manual,Vol Ii.Rept Covers Period of Jul 1998 Through June 1999.No Changes Made During Period ML20209C3851999-07-0606 July 1999 Forwards Redacted Draft of Decommissioning Trust Agreement Re Transfer of PNPS & NRC Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generating Co ML20196J7251999-07-0101 July 1999 Informs of Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, for Pilgrim Nuclear Power Station ML20209B9411999-06-30030 June 1999 Discusses Deferral of IGSCC Welds to RFO 13.Deferral of Welds to Refueling Outage 13 Does Not Impact Acceptable Level of Quality & Safety Per 10CFR50.55(a)(3)(i) Since Plant in Compliance W/Exam Percentage Requirements ML20209B9431999-06-30030 June 1999 Provides Formal Notification That Closing Date for Sale & Transfer of Pilgrim Station Scheduled to Occur on 990713. a Wang Will Be Verbally Notified of Time of Sale Closing ML20209B9791999-06-29029 June 1999 Forwards Rev 13A to Pilgrims COLR for Cycle 13,IAW TS 5.6.5 Requirements.Rev 13A Provides cycle-specific Limits for Operating Pilgrim During Remainder of Cycle 13 ML20196H2381999-06-29029 June 1999 Forwards SER Denying Licensee 980820 Request for Alternative Under PRR-13,rev 2 for Use of Code Case N-522 During Pressure Testing of Containment Penetration Piping ML20209A8761999-06-28028 June 1999 Forwards SER Authorizing Licensee 990317 Relief Request to Use ASME Code Case N-573 as Alternative to ASME Code Section XI Article IWA-4000 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20209A8701999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant,Reporting Status of Facility Y2K Readiness Encl ML20210U5901999-06-25025 June 1999 Opposes Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts.Expresses Skepticism Re Claim by Companies That Consumers Will Benefit from Proposed Consolidation & four-year Freeze in Base Rates ML20209C3431999-06-22022 June 1999 Forwards Addendum 1,Rev 14 to Pilgrim Station Security Plan,Iaw 10CFR50.54(p)(2).Changes Proposed Have Been Implemented & Constitute Increase in Plant Defense Plan Commitments.Encl Withheld,Per 10CFR73.21 1999-09-09
[Table view] Category:NRC TO LEGAL/LAW FIRM
MONTHYEARML20055H2721990-07-24024 July 1990 Final Response to FOIA Request.Printouts of Insp Repts,Salp Repts & Notices of Violation for 1976-1984 Encl.W/O Encl ML20245B4271989-06-21021 June 1989 Final Response to FOIA Request.App U Records Encl & Available in Pdr.App V Record Withheld (Ref FOIA Exemption 5) ML20245B7671989-04-19019 April 1989 Partial Response to FOIA Request for Records.App H/H Records Available in Pdr.App I/I Records Encl & Available in Pdr.App J/J & K/K Records Partially & Completely Withheld, Respectively (Ref FOIA Exemption 5) ML20236B0401989-03-10010 March 1989 Partial Response to FOIA Request for Documents.Forwards App E/E & Portions of App F/F Documents.App D/D,E/E & Portions of App F/F Documents Available in Pdr.App G/G & Portions of App F/F Withheld (Ref FOIA Exemption 5) ML20235S1421989-03-0101 March 1989 Forwards Record Identified as App C/C-1 in 890207 Response to FOIA Request,Per Telcon.Record Improperly Withheld ML20196F0531988-12-0808 December 1988 Partial Response to FOIA Request for Documents.Forwards App T & Partially Deleted App U Documents (Ref FOIA Exemption 5).App & T Also Available in Pdr.App V Documents Totally Withheld (Ref FOIA Exemption 5) ML20196B7081988-12-0101 December 1988 Partial Response to FOIA Request for Documents.Forwards Partially Withheld App R Documents (Ref FOIA Exemption 4) ML20206E7511988-11-10010 November 1988 Partial Response to FOIA Request for Plant Info.Documents Listed in App Q Totally Withheld (Ref FOIA Exemption 5) ML20206B7171988-10-25025 October 1988 Partial Response to FOIA Request for Documents Re Facility. App O Documents Available in Pdr.Forwards App P Documents, Also Available in PDR ML20206C3451988-10-18018 October 1988 Partial Response to FOIA Request Re Documents.App M & N Documents Encl & Available in PDR ML20205N9581988-10-0707 October 1988 Partial Response to FOIA Request for Records Re Facility.App K Documents in Pdr.App L Documents Encl & Available in PDR ML20204J3801988-09-14014 September 1988 Responds to FOIA Request for Records.Apps H & I Documents Available in PDR ML20155F8381988-09-0707 September 1988 Partial Response to FOIA Request.App F Documents Available in Pdr.App G Documents,Including Environ Assessments, Notification of Meeting,Internal Notes,Viewgraphs & Draft Ser,Encl & Being Placed in PDR & Lpdr ML20154D9191988-08-25025 August 1988 Partial Response to FOIA Request for Documents.Forwards App E Documents.App D & E Documents Available in Pdr.App E Documents Being Placed at Lpdr in Plymouth,Ma ML20154D7371988-08-23023 August 1988 Partial Response to FOIA Request for Documents Re Plant. Forwards App C Documents.Documents Also Available in PDR & Lpdr in Plymouth Public Library in Plymouth,Ma ML20235M4251987-07-13013 July 1987 Partial Response to FOIA Request for Documents Re Acrs. Forwards Documents for Categories One & Three of FOIA Request.Review of 21 Addl ACRS Documents Continuing ML20234E4571987-06-23023 June 1987 Partial Response to FOIA Request for 771026 Minutes of ACRS Subcommittee on Fluid/Hydraulic Dynamic Effects Meeting in Portland,Or & Addl ACRS Documentation.Documents Identified on App H & Addl ACRS Documents Encl ML20209J0281987-04-28028 April 1987 Partial Response to FOIA Request for Documents.Category 1 Documents Subj to Request Encl ML20206F3261986-06-13013 June 1986 Further Response to FOIA Request for Six Categories of Documents Re Facilities.App a Documents Available in Pdr.App B & C Documents Encl.Documents Also Available in Pdr.W/O App B & C Documents ML20199F1391986-02-14014 February 1986 Partial Response to FOIA Request for Documents Re Reported Problems Involving GE Fuel from 1972-present.Documents Listed on App Available in Pdr.Search for Addl Documents Continuing ML20141N2771986-01-14014 January 1986 Partial Response to FOIA Request for Seven Classes of Documents.Forwards App a Documents.App B Documents Available in Pdr.App C Documents Outside Scope of Request,Per 860114 Telcon W/Ca Reed ML20055A2601982-05-28028 May 1982 Responds to FOIA Request for Documents Re Requests by Licensees for Exemption or Extension Beyond 820201 Date Specified by Final Rule,Commission Analysis,Comments,Or Actions Re Emergency Planning.Forwards App a Documents 1990-07-24
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217D3951999-10-13013 October 1999 Forwards Request for Addl Info Re Util 990806 Submittal on USI A-46, Implementation Methodology Used at Pilgrim Nuclear Power Station, Per GL 87-02 ML20217E1581999-10-0808 October 1999 Forwards Insp Rept 50-293/99-05 on 990726-0905.Three Violations Noted & Being Treated as Ncvs.Violations Include Failure to Assure That Design Bases Correctly Translated Into Specifications ML20212J8301999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Integrate Performance Info & to Plan Insp Activities at Facility Over Next Six Months ML20212F7871999-09-24024 September 1999 Advises That Util 990121 Application for Amend Being Treated as Withdrawn.Proposed Changes Would Have Modified Facility UFSAR Pertaining to Values for post-accident Containment Pressure Credited in Pilgrim Net Positive Head Analyses ML20212C2861999-09-16016 September 1999 Forwards SER Accepting Licensee 981123 Request for Relief RR-E1,RR-E5,RR-E6 Pursuant to 10CFR50.55a(a)(3)(i) & Request for Relief RR-E2,RR-E3 & RR-E4 Pursuant to 10CFR50.55a(a)(3)(ii) ML20211H5701999-08-27027 August 1999 Forwards Insp Rept 50-293/99-04 on 990610-0725.Two Violations Identified Being Treated as non-cited Violations ML20210U7521999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opossing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U5761999-08-18018 August 1999 Responds to Opposing Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts. Informs That for Sale,Nrc Responsible for Only Ensuring That Entergy Technically & Financially Qualified to Operate NPP ML20210U6691999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opposing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U5151999-08-17017 August 1999 Forwards Notice of Withdrawal of Application for Approval of Indirect Transfer of FOL for Pilgrim in Response to .Approval No Longer Needed Since Beco Sold Interest in Pilgrim to EOI on 990713 ML20216E2321999-07-26026 July 1999 Discusses GL 92-01,rev 1,suppl 1, Rv Structural Integrity. NRC Revised Info in Rvid & Releasing as Rvid Version 2 ML20210E2231999-07-20020 July 1999 Discusses Arrangements Made by Dennis & M Santiago During 990615 Telephone Conversation for NRC to Inspect Licensed Operator Requalification Program at Pilgrim During Wk of 991004 ML20210A9441999-07-14014 July 1999 Responds to Re Changes to Pilgrim Nuclear Power Station Physical Security Plan Identified as Issue 2,rev 14, Addendum 1,respectively.No NRC Approval Is Required IAW 10CFR54(p) ML20209G2251999-07-0909 July 1999 Forwards Insp Rept 50-293/99-03 on 990419-0609.Five Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C. Several Individual Tagging Errors Occurred ML20209C4661999-07-0707 July 1999 Forwards SE Accepting Addendum on Proposed Change in Corporate Ownership Structure Involving Entergy Nuclear Generation Co ML20196J7251999-07-0101 July 1999 Informs of Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, for Pilgrim Nuclear Power Station ML20196H2381999-06-29029 June 1999 Forwards SER Denying Licensee 980820 Request for Alternative Under PRR-13,rev 2 for Use of Code Case N-522 During Pressure Testing of Containment Penetration Piping ML20209A8761999-06-28028 June 1999 Forwards SER Authorizing Licensee 990317 Relief Request to Use ASME Code Case N-573 as Alternative to ASME Code Section XI Article IWA-4000 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20195K3071999-06-15015 June 1999 Forwards Safety Evaluation Granting Licensee Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water Sys Piping for Plant ML20195K3851999-06-11011 June 1999 Forwards Copy of Notice of Consideration of Approval of Application Re Proposed Corporate Merger & Opportunity for Hearing.Application Seeks Approval of Proposed Indirect Transfer of FOL for Plant ML20196K9921999-06-0404 June 1999 Informs That NRC Ofc of NRR Reorganized Effective 990328.As Part of Reorganization,Division of Licensing Project Mgt Created ML20207E7351999-05-27027 May 1999 Responds to Requesting Reduction in IGSCC Insp Frequency Per GL 88-01 to Be Performed During Upcoming RFO 12.Forwards SE Re Reduction of IGSCC Insp of Category D Welds Due to Implementation of H Water Chemistry ML20207B6341999-05-26026 May 1999 Informs That Licensee 990415 Submittal Re Financial Position of Entergy Intl Ltd,Llc Will Be Marked as Proprietary & Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20207B7391999-05-24024 May 1999 Forwards from Kc Goss of FEMA to Cl Miller Forwarding FEMA Analysis of Prompt Alert & Notification Sys for Pilgrim Nuclear Power Station.Based on Review,No Significant Problems Exist with Alert & Notification Sys ML20207B0701999-05-24024 May 1999 Responds to Sent to Ofc of Congressional Affairs Requesting Info on Concerns Raised by One Constituent,J Riel Re Y2K Compliance of Pilgrim NPP in Plymouth,Ma ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML20206U7501999-05-17017 May 1999 Forwards Insp Rept 50-293/99-02 on 990308-0418.Two Severity Level 4 Violations Occurred & Being Treated as NCVs ML20206M1891999-05-11011 May 1999 Forwards SE of 980826 Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Sys Piping for Plant ML20206E0551999-04-29029 April 1999 Discusses Bulletin 96-03 Issued on 960506 & Beco Responses ,970207,981230,990121 & 990309 for Pilgrim Npp. Determined That Actions Taken Should Minimize Potential for Clogging of ECCS Suction Strainers ML20206B3031999-04-20020 April 1999 Forwards Insp Rept 50-293/99-01 on 990125-0307.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy.Security Program Was Also Inspected ML20205Q9491999-04-0909 April 1999 Informs That on 990225 NRC Staff Completed PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Develop an Integrated Understanding of Safety Performance ML20205B9391999-03-24024 March 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure-Locking & Thermal-Binding of Safety-Related Power-Operated Gate Valves ML20204C7871999-03-17017 March 1999 Informs That Application Submitting Transfer of Facility Operating License & Matls License & Proposed Amend, Will Be Marked as Proprietary & Be Withheld from Public Disclosure Pursuant to 10CFR2.709(b)(5) ML20199K8321999-01-22022 January 1999 Forwards Request for Addl Info Re Transfer of Facility Operating License for Plant ML20199H5811999-01-20020 January 1999 Submits Exemption Withdrawal of 10CFR70.24(a) Re Criticality Accident Monitoring Requirements ML20198L7781998-12-22022 December 1998 Forwards Insp Rept 50-293/98-10 on 981020-1208.No Violations Noted.Nrc Regional Specialists Reviewed EP & Fire Protection Programs.Ep Program Was Found to Be Well Implemented ML20198J0891998-12-21021 December 1998 Forwards NRC Response to Me Lampert Re Transfer of Ownership of Pilgrim Station in Response to Senator Kerry Ltr Dtd 981019.NRC Will Terminate License Only When Licensee Remediates Site to Levels Specified in Regulations ML20198J1041998-12-21021 December 1998 Forwards NRC Response to Me Lampert Re Transfer of Ownership of Pilgrim Station in Response to Congressman Markey Ltr Dtd 981019.NRC Will Terminate License Only When Licensee Remediates Site to Levels Specified in Regulations ML20137T2211998-12-17017 December 1998 Responds to to Chairman Jackson Re Concerns About Possible Sale of Pilgrim Station & Waste Disposal Issues.No Application for License Received Nor Contract of Sale Between Beco & Entergy.Record Copy ML20198J1161998-12-17017 December 1998 Responds to to Chairman Jackson in Which Recipient Expressed Concern About Possible Sale of Pilgrim Station & About Waste Disposal Issues.Nrc Has Not Received Application for Transfer of License to Date ML20198P2781998-12-17017 December 1998 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety.App B Records Being Withheld in Entirety (Ref FOIA Exemption 4) ML20198B2021998-12-0909 December 1998 Advises of Planned Insp Effort Resulting from Licensee Irpm Review.Details of Insp Plan for Next 6 Months & Historical Listing of Plant Issues Encl ML20197H8521998-12-0909 December 1998 Responds to Ltr Sent to Chairman SA Jackson on 981028 Re Concern That NRC Will Not Perform Environ Assessment in Connection with Consideration of Approval of Transfer of License for Plants to Permit Sale ML20196J1201998-12-0404 December 1998 Ack Receipt of 971217 & 30 & 980112,0309,0423 & 0630 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-293/97-02,50-293/97-11,50-293/97-13, 50-293/97-80 & 50-293/98-01.Actions Found Acceptable ML20196B5421998-11-24024 November 1998 Forwards Plant SRO & RO Initial Exam Rept 50-293/98-301OL During Wk of 981016-23 ML20196F7631998-11-24024 November 1998 Forwards Insp Rept 50-293/98-203 on 980928-1023.No Violations Noted.Three Issues Identified Re Containment Flooding,Surveillance Testing Criteria & Protection for RBCCW System from High Energy Line Break Inside Drywell ML20196C1191998-11-20020 November 1998 Forwards Insp Rept 50-293/98-08 on 980907-1019.No Violations Noted.During Insp Period,Chemical Decontamination of Residual Heat Removal Sys Was Well Planned & Implemented Which Reduced Radiation Doses in Heat Removal Quadrants ML20195H7361998-11-16016 November 1998 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 981016 & 981019-23 at Facility.Nine Applicants Were Administered Exam & Nine Passed.Licenses Issued & Individual Test Results Encl.Without Encl ML20155C4781998-10-29029 October 1998 Forwards RAI Re Resoultion to GL 96-06 Issues at Plant,Unit 1.Response Requested by 981130 ML20154J7881998-10-0808 October 1998 Authorizes Mb Santiago to Administer Initial Written Exams to Applicants Listed (Except Applicants Redlined), on 981016.NRC Region I Operator Licensing Staff Will Administer Operating Tests During Week of 981019 1999-09-30
[Table view] |
Text
- - - - - - - - - -
wu - - - - -. .
h,
_30fA.98 N se,=r,n p.
N O RESPONSE TO FREEDOM GF l'" X I ""'4 '
- INFORMATION ACT (FOIA) REQUEST OCT 2 51988
% ( ..... hX.ifhp,#,4.$is4g e wg.
.ggggtg.
George E. Johnson. Esquire 50/2J3 Pant I..atCO*ot Atti Atto 04 p.07 t0CAft0 (Ja. thet.e4 ees t ,
N. .v.ac, ,w.,os bi.ci t. P. w t uv. to.a W.t
- N.w.w , ,,,,..c ,i.n Mai w.=
Ae.nc, .c.,0. Ms.ci t. P. ,*ow t .*.t H **at'*d
- Atc.ae. O .>. e..s, ...cm. 6., bb : m.oea .a. a cecae e e. Na c pm 0.c, a.w-f X i7if M Str.et. N w . w.vwv.a. oC l . ,.ne. . .-i ,. ,.c r , ... ru au e. . _ P
- __ r. , ... .. e + ~e< ,um- r. < ~,, , a %=c em w .--
n ,i m s,. , w w. m ,e c<. . .+ , ,,*., e. .ois w .. r.. ..i., ~ -.
y Tu,.n .w, er.e w.r.,v .r .u ....**.c.,...wea....~~.v .1...a eno-.=... ,,,,,,u. u-w-o .., ., e. a c em o-. , n e im a s,. i s w . w.mv oc . . . . e. eo a w 9 . , ~~
se . ,,,,,.a r ~, .c .u.= .w e. .. + .~,, me . ~ .c ou ~m a i m a so .
. w .g co [
- e. A., . < w. .w , . e e. . ,, .w ,. . . , u -. .
A,.*, . . o-$ - c. .eci .
. .,4-i . r. % i %,. i.e e.~w .e. v.w., .,ru , . . , u .,ui .- i. ,
in , a e . . r. i. m. *- w .c . i., i..r .,, .u. .. t 4 pant et A-i%,omuatio% witswito pmou , se eisetosynt cs
- w. s. c. .,. o i.,
.,~-.n m..w ..e., e w, s.e. e r. .~. i. e., u .e evi
, e
..,,,,,rii.~*o.*...-.w. w4 ar.e,e. .n..wi'e.u.=,
. i.e. .N r. 4 9 *W. b..w. 9. p.bhg eg-iga W gogyeg
- , %.c e e=,,-.m am im a s t s * . w ,rm oc . . . c. eo . , .+ %-.
i C.r'w.e,*t.
1 i
- Copies of Appendix P records are also being placed at the Local Public Document Room maintained in the Plymouth Public Library,11 North Street. Plymouth. MA.
l 1 .
I i
J l l
J J
t
-g i
1 l
.=o..c:.cs S .: omecte ce i
! 4.4 Q%
f
)
1 l 8811160001 001025
- PDR FOIA 4
JOHNSONOO-190 PIVi l
NOC f o.u .A4 8 *
), ' 8' l
_ _ _ _ _ _ _ _ - _ _ - _ _ - - _ - - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ )
Re: F0!A-88-198 APPENDIX 0 PECORDS ALREADY IN THE POR
- 1. 4/12/86 Letter to W. Harrington, BECO, from T. Murley, Region I, NRC, !
re: CAL 86-10. Accession No. 8604210211 l t
- 2. 8/27/86 Letter to J. Lydon, BECO, from T. Murley, Region I, NRC, re: Confinnation Action Letter 86-10. Accession No. 8609030066 i 3. 12/31/86 Letter to J. Lydon, BECO, from W. Kane, Region I, NRC, re: Management Meeting 50 293/e6-41. Accession No. 8701090424 4 3/24/87 Note to Thomas E. Murley from Jack R. Goldberg, re: Pilgrim j 2.206 Petition, with attachments. (5 pages) Accession No. '
8707070629
- 5. 5/21/07 Letter to the Honorable Gerry E. Studds from Lando W. Zech, Jr. '
(2 pages) Accession No. U705290163 l
- 6. 6/19/87 Letter to the Honorable Gerry E. Studds from Thomas M. Roberts, ;
wf'h enclosures. (8 pages) Accession No. 8706250529 ;
- 7. 9/17/87 Letter to Lando W. Zech, Jr. from Edward M. Kennedy and Gerry E. Studds. (2 pages) Accession No. 8712020200 l t
4
- 8. 9/18/87 Letter to Chairman Zech from Gerry E. Studds. (3pages) I
- Accession No. 8712080075
- 9. 10/15/87 Letter to USNRC from R. Bird, BECO, re: Pilgrim Nuclear Power l Station Power Ascension Program. Accession No. 8710190263 l 3
10, 10/15/87 Petition of Michael S. Dukakis, Governor ana James M. Shannon, Attorney General for the Institution of a Proceeding Pursuant to 10 C.F.R.12.202 to Modify Suspend, or Aevoke the Operating t License held by the Boston Edison Company for the Filgria Nuclear ,
! Power Station. (25 pages) Accession No. 8710160236 l 11. 11/20/87 Letter to the Honorable Gerry E. Studds from Lando W. Zech, Jr..
(2pages)AccessionNo. 8712080320
)
l 12. 11/24/87 Letter to the Honorable Gerry E. Studds from Lando W. Zech, Jr., f
- (2pages)AccessionNo. 8712080059 [
r
- 13. 1/6/88 letter to the Honorable Michael S. Dukakis from Lando E. Zech, Jr. r (2 pages) Accession No. 8831130394 !
- 14 1/28/88 Letter to R. Bird, BECO, from S. Collins, re
- Response to !
10/15/87 letter. Accession No. 8802240346 L
i 15. 2/17/80 Letter to Lando W. Zech, Jr., from Edward M. Kennedy. (3 pages) !
Accession No. 8804050365 [
] ,
)
- 16. 3/29/88 Letter to the Honorable Edward M. Kennedy from Lando W. Zech, Jr.
(5pages)AccessionNo. 8804050343
(
I i l l
Re: F0!A-88-196 APPENDIX 0 RECORDS ALREADY IN THE PDR (Continued)
- 17. 4/28/88 Memorandum for William Kerr from Lando W. Zech, Jr., re: ACRS ,
Letter April 12,Regarding(Review 1988. 1 page) Accession of Shutdown Nuclear Power Plants Dated Nc. B806030194 18, 6/24/88 Memorandum for Victor Stello, Jr., from Samuel J. Chilk, re: Staff Requirements - Briefing on Status of Pilgrim, (2 pages) Accession No. B87078025 l
l
Ret F0IA.88-198 APP (N0lX P R(CORDS MAINTAINED IN THE POR UNDER TNE A80VE RCI)U($T NUM3(R NggQ @Ti T 0(5CR!PT10X
- 1. 03/81 Prompt Alerting and Nov <tcation Systes P11 grin Nuclear Power Station - Prepared for BECO by SWEC (87 Pages)
M. Brosee & Olstributton List Office Memo
Subject:
Plant 2 04/14/86 R. Fairbanks. Evaluation Teams (13 pages)
BEC0
- 3. 07/11/86 R. Bellamy, H. Ktster, Region I, Memo
Subject:
Summary of Region I, NRC NRC Occupational Esposure History at Pilgria Station (6pages)
- 4. BEC0/NRC Meeting 11/24/86 Presentation (129 pages)
- 5. 02/09/87 R. Silva, BECO R. Boula;, Mass. Letter enclosing copy of Civil Defense and Evaluation of Offstte Office of EP Emergency Preparedness in Area Surrounding Pilgrin Station (73Pages)
- 6. 03/03/87 L. Doerflein. J. Wiggins, Region I, Memo
Subject:
State Region I, NRC NRC Hearing on Pilgrim (2Pages)
- 7. 03/09/87 Testimony Before the Massachusetts Special Joint Coaatttee on the Investi USNRC (gation and Study of Pilgria - T. Murley, Regional Admin 20 Pages) b .' 04/01/87 T. Murley, Hon. W. Golden, Mass. Response to 2/25/87 letter Region I, NRC 5 tate Senate (2pages)
- 9. 06/23/87 R. Bellamy, D. Matthews, NRR, NRC Meno
Subject:
Pilgrie Region I, NRC Kuclear Power Station Emergency Preparedness (3pages)
- 10. 07/20/7 Handwritten notes (3 pages)
- 11. Og/24/7 Handwritten notes - meeting NRC/BECO (3 pages)
- 12. undated Handwritten notes - Hearing (3 pages)
- 13. undated Boston Edison Company Action Plan and Schedule fer Providing Assistance in Addressing FEMA !ssues (28 Pages)
l Re: F0IA> 86-198 l
APP (N011 P l
l RECORDS MAINTAlkt0 IN THE POR UNDER THE A80VE REQUEST NUM8(R NUMBER DAfj, DC 5CRIPf l0N_
- 14. 08/17/87 W. Lazarus, File Mean
Subject:
Meeting ,
Region I, NRC to discuss FEMA ! Self- !
Initiated Study of Mass l
! RERP for Pilgrts on August 14,1987(8pages) l l
- 15. 09/17/87 R. 8trd, BECO USNRC Letter
Subject:
Boston Edison Company Action Plan I and Schedule for Providing Assistance in addressing FEMA !ssues (2 Pages) 16, 10/08/87 W. Kane, Region I, W. Russell, Region I, Memo
Subject:
Pilgrin NRC NRC Restart Assessment Panel Coreposition(2Pages)
- 17. 10/14/87 Affidavit of (7 pages)
Steven C. Sholly i
- 18. 10/26/87 R. Bird, BECO P. Agnes, Ccwn. of Letter enclosing a report '
Mass "Ptigrin EPZ Pubite Beach l
Population Analysis" dated October 14,1987 (6 pages) l I
1 *15. 10/27/87 R. Bellamy, E. Thomas, FEMA, Letter referenctng 3 ttees l Region I, NRC Region I of correspondence concern- .
Ing Ptigris off-site !
emergency planning issues !
(2pages) ,
- 20. 11/30/87 Ptigrim Outstanding Items Ltst (13 Pages)
- 21. 12/04/87 M. Miller, Pilgrim Restart Panel Meno
Subject:
October 8,
- Region I, NRC 1987 Meeting with Commos-wealth of Mass. Regarding i t
the P11g(ris Station Nuclear Power 18 pages) ,
22, 12/07/87 M. Evans, A. Blough, Regton I, Memo subjer,t: Ptigrim Region I, NRC NRC Nuclear Power Station Power Ascenston Progran dated October 15, 1987 i (19 pagts) l f
l
Ret F0IA> 88-198 APP (N011 P
_ RECORDS MAINTAINED IN THE POR UNotR THE A80VC RtWEST NUM8(R l g DA_T1 0($CRIPT10N i i
- 23. undated written notes - Additional Testing for Pilgrim (1 page)
- 24. undated Handwritten notes (1 page) -
25, 12/08/87 Handwritten notes and typed version (7 pages) 2 6'.. 12/14/87 5. Collins, Pilgrim Restart Memo
Subject:
Pilgris !
Region I, NRC Panel Members Restart Plan Review (21Pages)
- 27. 12/29/87 R. Bird, BECO U$NRC Letter
Subject:
Public-ation of 1987 Emergene:
Public Information Brochure
- 28. Organization Charts (2 Pages)
- 29. Organization Charts (11 Pages)
Handwritten notes and typed Appendix B (NRC Comitments) (8 Pages) 30.
. 31, Chart-Management Self Assesseent Process (1 Page) i Handwritten notes (2 Pages) 32.
- 33. 01/15/88 W. Russell, C. Ba rry, Cosva o f Letter acknowledging 1/4/88
- Region I, NRC Mass. letter (copy athched) from !
Mr.Barry(SPages) l M. 02/04/88 A. Blourih, 5. Collins, Region I, Memo
Subject:
Comatteents i Region ., NRC NRC from 1/7/88 Kennedy [
' Hearings (48Pages) l.
- 35. 03/08/88 C. Warren, K. Highft11, BECO Memo
Subject:
NRC Follow- !
Region I, NRC up to AIT Inspection i 50-293/87-53(6Pages) I
- 36. 03/11/88 5. Collins, L. Robinson, FO!A Memo
Subject:
F0!A Request !
Region I, NRC Branch, NRC 88-120 from Senator Willias l Colden (1 Page)
- 37. 03/29/88 Technical Review - City of Taunton, Town of Kingston, Plymouth and i J Carver Radiological Emergency Response Plan for Pilgrte (8 Pages) (
- 38. Handwritten notes - Ptigriu Update - Miscellaneous Items (2 Pages) [
i i
Ret F0IA. P-198 ApPCN0lX P RECORDS MAINTAINED IN THE POR UNDER THE A80VE REQUEST NUMBER JggQ A p_A3, 0($CR!PT10N 39, 05/17 thru Telephone and conversation Records Handwritten ($ Pages) 6/3/88 j List of Inspections conducted / scheduled during the current SALP Perted (7 Pages)
I 40. 05/02/88 A. 81ough, D. Vogler, Board of Letter
Subject:
NRC staff Region I, NRC Selectmen Pubite Meeting to Otscuss Comments it received on the Boston Edison Company's Ptigrim Restart Plan (3Pages)
- 41. 05/11/88 NRC Public Meeting, Plymouth, M (73 Pages)
- 42. 05/24/88 J. Judge, Comm. M Miller, Region I, Telephone Conversation of Mass. Nkt; Record
Subject:
Pilgria IATI (1 Page)
) 43. 06/03/88 R. Swanson, BECO R. Bird, BECO office Memo
Subject:
Issues That Could Potentially Delay Restart - Rev. 15 l (21 Pages) 1
] 44. 06/09/88 Boston Edison Company - Pilgrim Nuclear Power Station Presentation Charts (Annotated) (21 Pages) 45 06/09/88 Commission Briefing on the Status of Ptigria Nuclear Station (17 Pages) 46 06/16/88 A. Blough, L. Doerflein, Region I, Memo
Subject:
Review of Region ,, NRC NRC Boston Edison Self-Assessment Report (6 Pages)
- 47. 06/16/88 G. Minor, MHS W. Russell, Region I, letter
Subject:
Protoco)
NRC for Pilgrim Inspection -
IAT! (2 Pages)
' 48. 06/20/88 NRC, Region I, Notice of Ltcensee Meeting No.88-095 (2 Pages)
- 49. 06/25/88 R. 8trd, BECO USNRC Letter
Subject:
W5 Request for Commencement of NRC Integrated Assess-ment Team Inspection and Transetttal of Schedules for Action Prior to Restart (26Pages)
Re: FOIA. n -198 APPEN011 P R(CORD $ MAINTAINED IN THE POR UND(R TM( A80V( REQU(5T NUM8(R M M 0(SCRIPfl0N
- 50. 06/27/7 Handwritten Notes - BECO Management Meeting 88-095 ($ Pages) 51, 06/27/84 BECO Press Release 88-38-N (1 Page) 32* 07/01/88 C. Gustin, BECO Dr. D. Prothrow-Smith, Letter Reference Response Comm of Mass, to OPH Wind Theory Analysis (5Pages)
- 53. Undated A. Blough, S. Collins. Region I, Memo
Subject:
Pilgrim Region I, NRC NRC Integrated Assessment inspection (IATI) Operating Plan (16Pages) 07/27/88 R. Bird, BECO All Nuclear Organt- Provides copy of R.G. B'.ed.
54*
zation Personnel IAT! Presentation on 7/20/88 (5 Pages) 07/28/84 BECO Press Release ( 2 Pages) 55.
- 56. 08/01/84 R. Anderson, BECO Distribution List Office Memo
Subject:
System Summary Status Report Updates (75 Pages) e l
a '
SWIDL'!R & BERLIN m umap wirA k (TRitt. % %
- m. m . .
TAtc4 TON. D C mee aki
. .w m .
Tim wii Maren 25, 1988 TREDW 0F INF0Mul0E Director ACT RE@EST office of Administration [,0Z"4 gi-/Yf U.S. Nuclear Regulatory Commission Washington, D.C. 20555 h M/-[k In re: Freedom of Information Act Request No. 88 _ , Concerning Pilgrim Nuclear Power Station Dear Sir In accordance with the provisions of the Freedom of Information Act, 5 U.S.C. 5552 and Part 9, Subpart A of 10 C.F.R., it is requested that the records identified below be r.ade availabla for inspection and copying:
- 1. Records of an*/ votes taken by the Commission, and records or transcripts of Commission meetings, vith respect to the shutdown of the Pilgrim Nuclear Power Station, or the restart thereof, on or after April 12, 1986.
- 2. All SECY papers, attachments thereto, records and other materials supporting or forming the basis for positions taken therein on the subject of the Pilgrim Nuclear Power Station, prepared on or after January 1, 1980.
- 3. All records prep l dated on or after nua r ' 1, 19 8 0 (bJt excluding documentp included on Doo [No.10-203 Ket accession lis,t'Ings ava lable f rom the. Public Doc ment Room) of HRC Regip6 I, the fice of the, Executive Di ector for Operations / the of fic of Inspecti6n and Enfor sent, thy Office o VInvestigat ns, the Office of Nuclea Reactoy/
Regulat)6n, the Of fi e of Nuclear Materials $ fety apd Safegu(rds, the Adv ory Corrpittee for Reacto Saf9guards, the office for Evai ation of Operational Dat , and the NRC Emergency Operatior Cente'r which discuss, r fe / t o, take posf'tions on, or f(rm th4 basis for decision oncerning, t / performance of 'gPilgrim Nuclear Power Station in the llowing areas:
Seko N f f )
J
2-A. Management
- s. Staffing C. Organization and Organizati:.. Structure D. Radiation Protection E. Quality Assurance F. Surveillance G. Maintenance H. Offsite Emergency Planning
- 1. Fire Protection J. Security K. Management Response to N4C .ty;14 tory Activities
- 4. All records of Region I, the Office of Nuclear Reactor Regulation, the Commission, the Office cf Inspection and Enforcement, or other Staf f or Commist.on of fices relating to, discussing or forming the basis or support for, the Director's Decision (DD-87-14) dated A; gust 21, 1987
- 5. All records (other than those categories of documents excluded f rom Item 3) of any office referred to in Item 4, above, discussing, describing, assesst..g, evaluating, or otherwise relating to actions by the DC staf f, FEMA, the ACRS, or other NRC or Commission of ficts, to follow-up or monitor actions by Boston Edison Compa.y. the Commonwealth of Massachu ettJ. other jurisdictions within the 10-mile energency planning zone for Pilgrim N.: lear Power Station, to address issues raised in the Direct:r's Decision (DD 14) dated August 21, 1987.
- 6. All records of the NRC of fices referred to in item 4 discussing, iascribing, assessing or e taluating, or otherwise relating to actions of the AC staf f to evaluate the July 1987 Restart Plan, and other actions by Bosten Edison Company, its agents or contractors, relating to the restart of the Pilgrim Nuclear Power !:ation.
- 7. All reccids of communications (whether written or oral and occurring f rom April 12, 1986 to the pesent) between any of fice of the NRC Staf f, or of the Corission or of fices reporting directly to it, and Boston Liison Company, concerning the status or startup of tr.e Pilgrim Nuclear Power station.
- 8. All records of comunications (whether written or oral, and occurring from April 12, 1986 to the present) between any of fice of the NRC Staf f or of the Comaission or of fices reporting directly to it, and FEMA, other rederal or State agencies or governmental entities, or persons concerning the status, startup, or issues relating te startup, of the Pilgris Nuclear Power Station.
, 3
- 9. All records it, the possession of any NRC Staff or Co..;ssion office pertaining to (a1 the evaluation by FEMA, NRC, er any other entity or agency, of the adequac/ of offsite c.grgency plans for the Pilgrin. Naclear Power Station, and (b) t..e conduct and/or evalutt;on of drills, full scale / full participation or partial scale / partial participation 2xercises conducted or planned for the Pilgrim Nuclear Power Station.
For purposes of this request, "record" or "document" :s defined to include, but nct be l'.mited to, note's, memorands, reports, meeting minutes, *:gs, transcripts, letters, pes:t;cn or policy papers, interpretations of requiretents, and guidan:e documents, and refers to draf ts as well as any final versitr. of