Partially Withheld Physical Security Insps Repts 50-245/86-26,50-336/86-32 & 50-423/86-38 on 861211-12 (Ref 10CFR73.21).Violation Noted:Protected Area Barrier Degraded for More than 46 H & No Compensatory Measures Implemented
ML20210B128
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 01/30/1987
From: Keimig R, Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20210B043 List:
References
50-245-86-26, 50-336-86-32, 50-423-86-38, NUDOCS 8702090081
Download: ML20210B128 (3)


Text

.

..

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

Report No /86-26 50-336/86-32 50-423/86-38 Docket No License Nos. OPR-21 50-336 DPR-65 50-423 NPF-44 Licensee: Northeast Nuclear Energy Company

,

P.O. Box 270 Hartford, Connecticut Facility Name: Millstone Nuclear Power Station, Units 1, 2, and 3 Inspection At: Waterford, Connecticut Inspection Conducted: December 11 and 12, 1986 Date of Last Physical Security Inspection: July 14-18, 1986 Type of Inspection: Special Announced Physical Security Inspection Inspector: /-So - //

G,4C. Smith, egua p list date Approved by: / .5 a - # 7 R A . Keimig, hief, eguards Section date Inspection Summary: Special Announced Physical Security Inspection on December 11 and 12, 1986 (Combined Report Nos. 50-245/86-26, 50-336/86-32, and 50-423/86-38)

Areas Inspected: Circumstances that resulted in a degraded protected area barrier and the licensee's corrective action Results: The licensee was found to be in violation of NRC requirements in that the protected area barrier for the station was degraded for a period of about 46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> and no compensatory measures were implemente !

B702090081 870130 PDR ADOCK 05000245 G PDR

_ , _ . , - _ _ . _ _ - _ _ _ _ _ , _ _ . _ _ _ ___

l

.. .

DETAILS persons Contacted P. Weekly, Security Supervisor J. Shediosky, NRC Senior Resident Inspector The inspector also interviewed other licensee and contract security personne . MC 30703 Exit Interview The inspector met with the licensee representative indicated in paragraph 1 at the conclusion of the inspection on December 12, 1986 to review the purpose and scope of the inspection and to present the finding Written material was not provided to the licensee by the inspector during the inspectio . MC 92700-Onsite Followup of a Report of a Non-routine Event Background I F I A . t ' ' ' '. iGHTr.!N'i SAFEGUARDS INFCMi 0h ':313 i:37 FOR PUBLIC CISCl0flL;E,if15 INTENTIONALLY LEFT ELAH Tills l'ARAGRA!'ll C0?!TAINS SAFEGilARDS INF03i6T!0N A!;015 N3i FOR PUSLIC DISCLOSURE,if15 luiENil0NALLY LEFT BLANK.

I

.

. . - .

2 NRC Inspector Findings THIS PARMRAPH CONTAINS SAFEGilA!!DS INFORfMT!0N ANO lS M9i FOR PUDLIC DISCLOSURE, ITIS !!!TENTIONALLY LEFT BLAN For long term corrective action, the licensee entered a notation in the Production Maintenance Management System (automated work order system) to the effect that a guard is needed when maintenance is being performed on the system. The licensee also initiated a review of all other penetrations that could provide access to the protected area to identify similar situations. That review was not complete at the conclusion of the inspectio The NRC-approved Millstone Physical Security Plan, Revision 1, dated January 2,1986, Section 4.2, Physical Barriers, states, in part,:

THIS PAPfCMM CONTAR!S SAFEGUARDS INF09tRTION AMD ;S !!01 FOR PUBLIC DISCLOS!!RE,IT IS INTENTIONALLY LEFT DLAN Failure to comply with security plan commitments is a violation of NRC requirements (50-245/86-01, 50-336/86-01, and 50-423/86-01).

!

ISIS Pr. ; -

.0HTE:FS$?MOVt.1DS INFMMAT 00 ?"D lS NOT FOR PUOLIC DISCLOS!!RE,IT IS It!TENTIONALLY LEFT DLAN