MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20196D7021999-06-25025 June 1999 Informs That Reactor Sys Branch Prepared Suppl 1 to GL 83-11 Re Licensee Qualification for Performing Safety Analyses, Which Was Issued on 990624.Matl Related to Subj GL Should Be Placed in PDR & Made Available to Public DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205J2811999-04-0606 April 1999 Notification of 990422 Meeting for Dockets 7200026 & 7200027 with PG&E in Rockville,Md to Dicuss PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon ML20205B2301999-03-25025 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990125-28 IR 05000275/19993011999-03-25025 March 1999 Forwards NRC Operator Licensing Exam Repts 50-275/99-301 & 50-323/99-301 for Tests Administered on 990125-28 ML20207M3401999-03-0202 March 1999 Notification of Canceled Meeting Scheduled for 990309 Re 7200026 & 7200027 for PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon ML20155H9051998-11-0303 November 1998 Notification of 981117 Meeting for Dockets 7200026 & 7200027 with Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage ML20248K4451998-06-0202 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage.Meeting Agenda Encl ML20247G9081998-04-0707 April 1998 Discusses Experts Needed for Plant Life Extension Cases,Per 980403 Discussion ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20057A9941993-09-14014 September 1993 Forwards NRC Proposed Transcript Corrections ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20127P4161993-01-19019 January 1993 Provides Summary of 930113 Operators Reactors Events Briefing.List of Attendees & Viewgraphs of Elements Discussed Encl ML20126F0201992-12-16016 December 1992 Discusses Discrepancies in Svcs Rendered for 3rd & 4th Quarters of 1991 & 1st,2nd & 3rd Quarters of 1992.TLD Program for Humbolt Bay Site Did Not Strictly Follow Ltr of Contract ML20127D4321992-09-0101 September 1992 Forwards 920818 Petition Submitted by N Culver on Behalf of San Luis Obispo Mothers for Peace,Filed in Response to NRC Notice of Issuance of Amend to Licenses for Plant,Extending Expiration Date from 080423 to 210922 ML20058P5021990-08-15015 August 1990 Forwards Three Analyses of Shutdown Events Evaluated by Accident Sequence Precursor Program ML20247M1881989-05-26026 May 1989 Notification of 890613,14 & 15 Meetings W/Util in San Francisco,Ca to Discuss PRA Topics Re NRC Questions on long-term Seismic Program ML20154E5121988-05-0909 May 1988 Requests That Zip Code for Judge Es Bowers Address Be Changed as Stated,Per Iw Smith Request.Related Correspondence ML20153E3031988-05-0303 May 1988 Forwards NRR Input to Status of Regulatory Activities at Plants,In Response to J Curtis Request for Info ML20153E3381988-04-21021 April 1988 Requests Input on Status of Regulatory Activities for Listed Plants,Status of EPRI Research for RES & Status of California Low Level Waste Program.Response Requested by 880505 ML20151D4271988-03-24024 March 1988 Submits Summary of Actions Discussed at ACRS 335th Meeting on 880310-12 in Washington,Dc,Including ACRS Repts/ Recommendations,Other Actions,Agreements,Assignments & Requests & Future Agenda ML20148G2281988-03-22022 March 1988 Advises That Time for Commission to Review Naslap Decision (ALAB-880) Expired.Commission Declined Review.Decision Became Final Agency Action on 880318.Served on 880323 ML20148D9491988-03-15015 March 1988 Discusses 880315 Operating Reactors Events Meeting 88-11. List of Attendees,Events Discussed & Tabulation of long-term Followup Assignments Detailed in Encls ML20236R7551987-11-20020 November 1987 Informs That Time Provided by NRC Regulations within Which Commission May Act to Review ALAB-877 Expired.Commission Declined Review.Decision Became Final Agency Action on 871117.Served on 871120 ML20236N8421987-11-12012 November 1987 Documents Reconstitution of Aslab for OL Amend Proceeding to Consist of as Rosenthal,Cn Kohl & Ha Wilber.Related Correspondence ML20236H2821987-10-30030 October 1987 Informs That Time Provided within Which Commission May Act to Review ALAB-873 Expired.Commission Declined Review. Decision Became Final Agency Action on 871028.Served on 871102 ML20235H6291987-09-25025 September 1987 Informs of Reconstitution of Aslab Consisting of Author as Chairman & TS Moore & Ha Wilber as Members ML20234F3831987-09-14014 September 1987 Documents Results of Exam of Bolted Connections of Raceway Supports at Plant.Exam Conducted Due to Allegations Received Re Adequacy of Anchor Bolts Securing Raceway Supports to Concrete ML20238A6481987-08-17017 August 1987 Forwards Page 7 of 870813 Pleading Entitled, Response of NRC Staff to Licensing Board Order of 870732 (Directing Parties to File Comments on Applicability of Appeal Boards Decision...), Which Was Inadvertently Omitted ML20195F8261987-08-0707 August 1987 Forwards Listed Data Tables for Use in Preparing Performance Analyses for Plant,Per DF Kirsch 870728 Memo.Salp Performance Analyses Should Be Submitted to J Burdoin by 870825 ML20235M1861987-07-13013 July 1987 Forwards Complete Footnote 5 as Appearing on Pages 8 & 9 of 870710 Answer to Sierra Club Motion to Admit Contention Re Generic Issue 82 & to Direct Preparation of Eis. Due to Quirk in Programming,Not All of Footnote 5 Printed ML20235G5441987-07-0808 July 1987 Forwards NRC Staff Proposed Findings of Fact & Conclusions of Law in Form of Initial Decision Re Licensee Amend Request to Expand Spent Fuel Pools at Plant ML20234F5101987-07-0606 July 1987 Informs of Large Number of Limited Appearance Statements Filed in Proceeding.Documents Will Not Be Served,Per Board Chairman Discussions.Documents Will Be Made Part of Official Record & Will Be Available for Insp.Served on 870706 ML20216D0931987-06-22022 June 1987 Forwards Transcript Pages 65-68 of J Mcdermott Limited Appearance Statement on 870615 Re Defective Weld at Plant Approved by QC Inspector for Appropriate Action.Served on 870624 ML20214W5681987-06-0505 June 1987 Forwards List of Exhibits Intended to Be Offered by Sierra Club in Upcoming Hearing in Proceeding Re Spent Fuel Pool. List Received Too Late for Inclusion in to ASLB ML20214T2031987-06-0505 June 1987 Forwards NRC Staff Disk in Ascii Form,Containing Staff Testimony & Draft Proposed Findings of Fact & Conclusions of Law,Per ASLB 870522 Memorandum & Order.Requests Database Compiled by ASLB Be Provided on Encl Blank Disks ML20214T1581987-06-0404 June 1987 Forwards NRC Staff Testimony of Hg Ashar,Hm Fishman,G Degrassi,Wl Brooks & a Singn on Sierra Club Contentions I(A)3 & 4;I(B)2,8 & 9;II(A)1-9 & II(B)1-9 & Dp Cleary on Sierra Club Contention I(B)7,per ASLB 870128 & 0409 Orders ML20214T2251987-06-0303 June 1987 Confirms 870602 Telcon Informing ASLB of Staff Intention to Offer Listed Documents as Staff Exhibits in Upcoming Hearing on Spent Fuel Pool ML20195G2301987-06-0202 June 1987 Discusses Plans for Response to Lessons Learned from Plant 870410 Loss of RHR Event.Crgr Review of 50.54(f) Ltr Providing Addl Info Requested at Earliest Opportunity ML20149M6491987-05-29029 May 1987 Forwards Proposed 10CFR50.54(f) Ltr Currently Being Reviewed for Transmittal to CRGR on 870602.Comments,if Necessary, Requested by 870601 ML20214L5831987-05-21021 May 1987 Summarizes 870519 Operating Reactors Events Meeting 87-15 to Brief Senior Managers from Nrr,Res,Aeod & Regional Ofcs on Events Which Occurred Since 870512 Meeting.Events Discussed & Significant Elements of Events Encl ML20245B1911987-05-18018 May 1987 Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl IA-87-714, Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl1987-05-18018 May 1987 Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl ML20214A5501987-05-14014 May 1987 Partially Deleted Memo Re Recommendation for Diablo Canyon Board Notification Concerning 831019 Allegations ML20214A0311987-05-12012 May 1987 Notifies of 870514 Briefing on Licensing & Operational Status of Plants Assigned to Project Directorate V,Including Diablo Canyon,Palo Verde,Rancho Seco,San Onfore,Trojan & WPPSS 2 ML20215H9221987-05-0707 May 1987 Submits Results of Lll Exam of Facility Raceway Support Bolted Connections.Exams Conducted Due to Allegations Re Adequacy of Anchor Bolts & Feedback from Lll That Adequacy of Bolting Might Be Safety Issue 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20196D7021999-06-25025 June 1999 Informs That Reactor Sys Branch Prepared Suppl 1 to GL 83-11 Re Licensee Qualification for Performing Safety Analyses, Which Was Issued on 990624.Matl Related to Subj GL Should Be Placed in PDR & Made Available to Public DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205J2811999-04-0606 April 1999 Notification of 990422 Meeting for Dockets 7200026 & 7200027 with PG&E in Rockville,Md to Dicuss PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon IR 05000275/19993011999-03-25025 March 1999 Forwards NRC Operator Licensing Exam Repts 50-275/99-301 & 50-323/99-301 for Tests Administered on 990125-28 ML20205B2301999-03-25025 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990125-28 ML20207M3401999-03-0202 March 1999 Notification of Canceled Meeting Scheduled for 990309 Re 7200026 & 7200027 for PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon ML20155H9051998-11-0303 November 1998 Notification of 981117 Meeting for Dockets 7200026 & 7200027 with Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage ML20248K4451998-06-0202 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage.Meeting Agenda Encl ML20247G9081998-04-0707 April 1998 Discusses Experts Needed for Plant Life Extension Cases,Per 980403 Discussion ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20057A9941993-09-14014 September 1993 Forwards NRC Proposed Transcript Corrections ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20127P4161993-01-19019 January 1993 Provides Summary of 930113 Operators Reactors Events Briefing.List of Attendees & Viewgraphs of Elements Discussed Encl ML20126F0201992-12-16016 December 1992 Discusses Discrepancies in Svcs Rendered for 3rd & 4th Quarters of 1991 & 1st,2nd & 3rd Quarters of 1992.TLD Program for Humbolt Bay Site Did Not Strictly Follow Ltr of Contract ML20127D4321992-09-0101 September 1992 Forwards 920818 Petition Submitted by N Culver on Behalf of San Luis Obispo Mothers for Peace,Filed in Response to NRC Notice of Issuance of Amend to Licenses for Plant,Extending Expiration Date from 080423 to 210922 ML20058P5021990-08-15015 August 1990 Forwards Three Analyses of Shutdown Events Evaluated by Accident Sequence Precursor Program ML20247M1881989-05-26026 May 1989 Notification of 890613,14 & 15 Meetings W/Util in San Francisco,Ca to Discuss PRA Topics Re NRC Questions on long-term Seismic Program NUREG-1353, Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-13531989-05-0202 May 1989 Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353 NUREG/CR-5176, Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants1989-02-14014 February 1989 Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants ML20154E5121988-05-0909 May 1988 Requests That Zip Code for Judge Es Bowers Address Be Changed as Stated,Per Iw Smith Request.Related Correspondence ML20153E3031988-05-0303 May 1988 Forwards NRR Input to Status of Regulatory Activities at Plants,In Response to J Curtis Request for Info ML20153E3381988-04-21021 April 1988 Requests Input on Status of Regulatory Activities for Listed Plants,Status of EPRI Research for RES & Status of California Low Level Waste Program.Response Requested by 880505 ML20151D4271988-03-24024 March 1988 Submits Summary of Actions Discussed at ACRS 335th Meeting on 880310-12 in Washington,Dc,Including ACRS Repts/ Recommendations,Other Actions,Agreements,Assignments & Requests & Future Agenda ML20148G2281988-03-22022 March 1988 Advises That Time for Commission to Review Naslap Decision (ALAB-880) Expired.Commission Declined Review.Decision Became Final Agency Action on 880318.Served on 880323 ML20148D9491988-03-15015 March 1988 Discusses 880315 Operating Reactors Events Meeting 88-11. List of Attendees,Events Discussed & Tabulation of long-term Followup Assignments Detailed in Encls ML20236Y1501987-12-0707 December 1987 Staff Requirements Memo Re 871125 Affirmation/Discussion & Vote.Commission Approved Order Directing Aslab to Issue Decision by 880131 Re Installation of high-density Spent Fuel Racks & Order Vacating Stay for Low Power Operations ML20236R7551987-11-20020 November 1987 Informs That Time Provided by NRC Regulations within Which Commission May Act to Review ALAB-877 Expired.Commission Declined Review.Decision Became Final Agency Action on 871117.Served on 871120 ML20236N8421987-11-12012 November 1987 Documents Reconstitution of Aslab for OL Amend Proceeding to Consist of as Rosenthal,Cn Kohl & Ha Wilber.Related Correspondence ML20236H2821987-10-30030 October 1987 Informs That Time Provided within Which Commission May Act to Review ALAB-873 Expired.Commission Declined Review. Decision Became Final Agency Action on 871028.Served on 871102 ML20235H6291987-09-25025 September 1987 Informs of Reconstitution of Aslab Consisting of Author as Chairman & TS Moore & Ha Wilber as Members ML20234F3831987-09-14014 September 1987 Documents Results of Exam of Bolted Connections of Raceway Supports at Plant.Exam Conducted Due to Allegations Received Re Adequacy of Anchor Bolts Securing Raceway Supports to Concrete ML20238A6481987-08-17017 August 1987 Forwards Page 7 of 870813 Pleading Entitled, Response of NRC Staff to Licensing Board Order of 870732 (Directing Parties to File Comments on Applicability of Appeal Boards Decision...), Which Was Inadvertently Omitted ML20195F8261987-08-0707 August 1987 Forwards Listed Data Tables for Use in Preparing Performance Analyses for Plant,Per DF Kirsch 870728 Memo.Salp Performance Analyses Should Be Submitted to J Burdoin by 870825 ML20235M1861987-07-13013 July 1987 Forwards Complete Footnote 5 as Appearing on Pages 8 & 9 of 870710 Answer to Sierra Club Motion to Admit Contention Re Generic Issue 82 & to Direct Preparation of Eis. Due to Quirk in Programming,Not All of Footnote 5 Printed ML20235G5441987-07-0808 July 1987 Forwards NRC Staff Proposed Findings of Fact & Conclusions of Law in Form of Initial Decision Re Licensee Amend Request to Expand Spent Fuel Pools at Plant ML20234F5101987-07-0606 July 1987 Informs of Large Number of Limited Appearance Statements Filed in Proceeding.Documents Will Not Be Served,Per Board Chairman Discussions.Documents Will Be Made Part of Official Record & Will Be Available for Insp.Served on 870706 ML20216D0931987-06-22022 June 1987 Forwards Transcript Pages 65-68 of J Mcdermott Limited Appearance Statement on 870615 Re Defective Weld at Plant Approved by QC Inspector for Appropriate Action.Served on 870624 ML20214W5681987-06-0505 June 1987 Forwards List of Exhibits Intended to Be Offered by Sierra Club in Upcoming Hearing in Proceeding Re Spent Fuel Pool. List Received Too Late for Inclusion in to ASLB ML20214T2031987-06-0505 June 1987 Forwards NRC Staff Disk in Ascii Form,Containing Staff Testimony & Draft Proposed Findings of Fact & Conclusions of Law,Per ASLB 870522 Memorandum & Order.Requests Database Compiled by ASLB Be Provided on Encl Blank Disks ML20214T1581987-06-0404 June 1987 Forwards NRC Staff Testimony of Hg Ashar,Hm Fishman,G Degrassi,Wl Brooks & a Singn on Sierra Club Contentions I(A)3 & 4;I(B)2,8 & 9;II(A)1-9 & II(B)1-9 & Dp Cleary on Sierra Club Contention I(B)7,per ASLB 870128 & 0409 Orders ML20214T2251987-06-0303 June 1987 Confirms 870602 Telcon Informing ASLB of Staff Intention to Offer Listed Documents as Staff Exhibits in Upcoming Hearing on Spent Fuel Pool ML20195G2301987-06-0202 June 1987 Discusses Plans for Response to Lessons Learned from Plant 870410 Loss of RHR Event.Crgr Review of 50.54(f) Ltr Providing Addl Info Requested at Earliest Opportunity ML20149M6491987-05-29029 May 1987 Forwards Proposed 10CFR50.54(f) Ltr Currently Being Reviewed for Transmittal to CRGR on 870602.Comments,if Necessary, Requested by 870601 ML20214L5831987-05-21021 May 1987 Summarizes 870519 Operating Reactors Events Meeting 87-15 to Brief Senior Managers from Nrr,Res,Aeod & Regional Ofcs on Events Which Occurred Since 870512 Meeting.Events Discussed & Significant Elements of Events Encl ML20245B1911987-05-18018 May 1987 Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl IA-87-714, Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl1987-05-18018 May 1987 Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl 1999-08-27
[Table view] |
Text
_ _ _ _ _ _ _ _ _ _ _ _
,. f z,.,
o f .- UNITED STATES h ' '[ T ' %g[ g ei
^I NUCLEAR REGULATORY COMMISSION REGION V '
2, k . 8 1450 MARIA LANE. SUITE 210 5 '
[ WALNUT CREEK, CAllFORNI A 44596 DEC 121983 MEMORANDUM.FOR: G. Knighton, Chief, Reactor Licensing Branch No. 3, NRR H. Scherling, Diablo Canyon Project Manager, NPR P. T. Kuo, Structural and Geotechnical Engineering Branch, NRR THRU: D. F. Kirsch, Chief, Reactor Projects Section No. 3 '
FROM: P. J. Morrill, Reactor Inspector, RV
SUBJECT:
DIABLO CANYON - ALLEGATIONS CONCERNING ERRORS IN DESIGN / DOCUMENTATION OF SAFETY RELATED SYSTEMS, STRUCTURES, AND COMPONENTS The purpose of this memo is to forward my feeder report from the follow-up of items number two and seven of the subject allegations (enclosed). Should you have questions or comments please contact me at FTS 463-3740.
P. J. Morrill Reactor Inspector
Enclosure:
As stated cc: (w/ enclosure)
T. Bishop, RV D. Kirsch, RV P. Morrill, RV M. Mendonca, RV 8609250035 860716 PDR FOIA HOLMES86-151 PDR
-- --- - - - - - - - - - - -- ----- ---- - - - ---- - - - -- a
o s ENCLOSURE DIABLO CANYON - FOLLOW-UP OF ITEMS TWO AND SEVEN REGARDING ALLEGATIONS CONCERNING ERRORS IN DESIGN / DOCUMENTATION OF SAFETY RELATED SYSTEMS, STRUCTURES, AND COMPONENTS Examinations conducted October 25 and November 3, 1983 at Pacific Gas and Electric Company offices in San Francisco, California (A) ALLEGATION NUMBER TWO:
GENERAL: Allegation number two states, " Safety related equipment has inadequate / untraceable documentation". In general, safety related equipment requires documentation to (1) demonstrate that the equipment is qualified to meet its' intended purpose and (2) provide information for maintenance and operation. Consequently, the inspector decided to examine the licensee's systems used to document the qualifications of safety related equipment, examine the resolution of licensee identified documentation problem areas, question licensee personnel as to documentation problems which they were aware of, and examine a sample of licensee records which document equipment acceptance or qualifications to verify the adequacy of this documentation.
EXAMINATION: The inspector examined the licensee's project nonconformances identified in 1982 and 1983, the procedures the licensee uses to assure adequate qualifications of equipment are completed, and the engineering project files related to documentation and qualification records for safety related mechanical equipment. The inspector also discussed this issue with licensee engineers and management personnel in conjunction with the examination of documents. The inspector asked the licensee personnel contacted if they were aware of any circumstances which might cause such an allegation to be made.
The following personnel were contacted.
E. Kahler, Diablo Canyon Project, Engineering QC Supervisor M. Williamson, Senior Licensing Engineer l
l F. Zerebinski, Assistant QC Engineer, Unit 1 M. Guzman, QA Engineer i
J. McCracken, Senior Engineer, Engineering Mechanical Systems R. Laverty, Deputy Engineering Group Supervisor, EMS T. McIlraith, Mechanical Engineer, Engineering Department The documents reviewed included the following.
Diablo Canyon Project Engineer's Instruction No. 5, " Design Interfaces",
Rev. 3, effective October 10, 1983.
Diablo Canyon Project Engineer's Instruction No. II, " Design Review Due to Response Spectra Revision", Rev. 2, effective March 11, 1983.
i
2 2
s Diablo Canyon Project Non-Conformance Report Log 1982 and 1983 Non-Conformance Reports: DCO.82-EN-06, initiated April 28, 1982, " Class I equipment for ASWS qualified to Hosgri ground accelerations rather than floor response spectra": DC0 82-EN-14, initiated May 12, 1982, " Handling of Westinghouse NSSS Supplier Drawing Revisions": DCI 82-EN-20, initiated July 26, 1982, "HVAC seismic supports - generic support type does not satisfy Hosgri Criteria".
PG&E Engineering Department Procedure 7.2, Rev. 1, dated April 12, 1979,
" Engineering Release".
Engineering Release Documents: ER 1654 " Reactor Coolant Subcooling Margin Monitor" (Combustion Engineering): ER 1653 " Reactor Head Vent Solenoid Valves" (Westinghouse): ER 1642 "LCV 106, 197, 198, 109 - Motor Operators" (Listorque).
PG&E letter to Westinghouse, McCracken to Hobel, dated March 29, 1983, tabulation of all safety related Westinghouse equipment.
Westinghouse letter to PG&E, Robel to Rocca, dated September 16, 1983, status report of Westinghouse equipment qualification.
Calculation, SQE 8.1 (D21.1-2, Rev. I and D21.1-3, Rev. 1), dated August 16, 1983, Qualification of Diesel Generator System ANALYSIS: (Based on examination of the records and interviews of the personnel listed above) the engineering organization (Project) is responsible for obtaining and maintaining appropriate qualification and descriptive documentation of purchased equipment. Each discipline (Mechanical, Civil, Electric, etc.) Group Supervisor is responsible for obtaining appropriate descriptive documentation for each purchase order and for tabulating and maintaining a list of safety related equipment and qualification requirements for their discipline.
Descriptive documentaiton takes the form of drawings, technical manuals, and data reports. These items are obtained, coordinated, reviewed and approved by engineering prior to distribution to other potential users.
l Qualification documentation of safety related equipment is either obtained from the vendor or produced by the Project. Vendor supplied qualification documentaiton is reviewed by responsible engineers who document their reviews on " Engineering Release" forms. Qualifications conducted by the Project are doucmented by controled calcuilations or reports. Licensee personnel stated that the Diablo Canyon Project was different from other Bechtel projects in that the large civil / structural scope of the project necessitated that many qualification analyses had to be assigned to support staff groups within Bechtel or PG&E rather than the civil / structural group. They went on to suggest that since the civil discipline was not completing many of the qualifications which they normally would, this might be preceived as a failure I to do the qualifications by some people in the civil engineering group. When revisions to qualification requirements (such as seismic spectra) occur, the change is issued as a revision to a Design Criteria Memorandum (DCM) and distributed to the discipline groups. The engineers within each group are
3
' responsible for reviewing these changes and verifying that equipment either meets.the revised requirements or is requalified. With the exception of the NSSS supplier, safety related equipment lists are controlled documents and are in the form of calculations or indexes. In the case of the NSSS supplier (Westinghouse) the tabulation is in the form of a licensee letter addressed to Westinghouse. Revisions to DCMs are sent to Westinghouse by the responsible engineer who receives a monthly status report from Westinghouse as to the status of qualification for each revision of each DCM for each piece of safety related equipment. Project procedures provide guidance as to which group is responsible for which qualifications.
The inspector observed that the documentation associated with the qualification of the reactor vessel head vent solenoid, the reactor coolant subcooling meter, four auxiliary feedwater level control valves, and the seismic analysis of the diesel generators appeared satisfactory. The inspector also observed that documentation and qualification problems identified by the licensee had generally been identified in the licensee's or Independent Verification Program reports to the NRC. One #CR appeared to support the allegation in that licensee personnel had identified documentation problems related to Westinghouse vendor prints. Licensee personnel stated i that when plant maintenance personnel attempted to repair a valve they found the vendor drawing for the valve was incorrect (a check valve was 3/4" taller than indicated on the drawing). A subsequent examination revealed that following each shipment of a valve or valves from Westinghouse a vendor print would be issued for that shipment. Subsequent valves (in some cases) were fabricated to a different revision of that drawing and shipped with that drawing revision following them. Engineering personnel, thinking the earlier revisions were no longer applicable, disposed of the older drawings. PG&E personnel went on to demonstrate to the inspector that the missing revisions had been recently purchased from Westinghouse and that this information was now available to plant personnel.
CONCLUSIONS: The inspector found that the allegation had merit, in that drawings of some Westinghouse valves had been inadvertently thrown away. The licensee subsequently identified this problem and obtained the missing documents. Current documentation of qualifications and analyses appeared satisfactory.
(B) ALLEGATION NUMBER SEVEN:
GENERAL: Allegation number seven states, "There are no complete sets of "As-Built" drawings for the containment and other areas. Even the ones l
existing have discrepancies with erection drawings and DC's issued". The l inspector's understanding of the basic requirements related to this allegation l are that drawings depicting the final "as-built" condition of the plant (1) should exist, (2) have been examined by the responsible engineers to verify the plant as constructed is consistent with their design and analyses, and (3) are available to personnel of the plant staff consistent with their j need for this type of drawing for maintaining and operating the plant.
The inspector concentrated on the containment annulus structural steel connnections, to determine (1) if "as-built" drawings exist, (2) wheather or i
not the responsible engineers are receiving these drawings in a timely manner, I (3) if the engineers are reviewing these drawings for consistency witft their
4 D
design work, (4) if the subject drawings are available to the plant ctaff and other potential users in a timely manner, and (5) when will the relevant design drawings be finalized "as-built".
EXAMINATION: The inspector examined the licensee's procedures related to the control of DCNs and the "as-builting" of drawings as well as relevant DCNs, shop drawings, field change transmittals, and working drawings. The inspector also discussed this issue and the associated work in progress with licensee employees to determine the status of "as-built" drawings and the nature of descrepancies in existing drawings.
The persons contacted are-listed below.
G. Moore, Diablo Canyon Unit 1, Project Engineer J. McCall, Diablo Canyon Project, Civil Group Supervisor W. White, Special Assistant to the Civil Group Supervisor E. Kahler, Diablo Canyon Project, Engineering QC Supervisor N. Tuholski, Deputy Civil Group Supervisor J. Osborne, Drafting Group Supervisor R. Delrosario, Supervising Designer M. Williamson, Senior Licensing Engineer P. Kousharian, Senior Engineer K. Mandagi, Supervising Engineer The documents examined included those listed below.
Engineering Procedure 3.6, dated June 25, 1982, " Design Changes".
Engineering Procedure 3.50N, dated August 15, 1983, " Operating Nuclear Plant Design Changes".
Engineering Procedure 3.7, dated September 1, 1983, "As-Built Documents".
Diablo Canyon Project Procedure CE-DC-5, dated November 1, 1982, " Procedure for Issue of Civil Structural Design Modifications".
PG&E Drawing 447245, Rev. 7, dated April 12, 1982, " Annulus Hanger Frames at Elevation 101 and 106, Containment Structure Area F & G".
l PG&E Drawing 47281, Rev. 9, dated July 8, 1981, " Annulus Platform Framins Elevation 87". 1 PG&E Drawing 438282, Rev. 10, dated July 1, 1981, " Annulus Platform Framing Elevation 140".
PG&E Drawing 447254, Rev. 4, dated April 21, 1980, " Concrete Outline and Reinforcing Platform at Elevation 140".
PG&E Drawings 468984, Rev. 01B, dated March 7, 1983, 468985, Rev. 01B, dated March 7, 1983, 468986, Rev. 01A, dated December 1, 1982, " Civil Plans, Details and Sections, Column Additions & Column Braces, Annulus Frames - Containment StruerAre".
\
v . 5 e
PG&E Drawing 468987, Rev. 01A, dated February 28, 1983, " Annulus Steel -
Radial Frame Additions, Column 1".
PG&E Drawing 468988, Rev. 01A, dated February 28, 1983, " Annulus Steel -
Radial Frame Additions, Column 2".
PG&E Drawing 468989, Rev. 01B, dated July 3, 1983, " Annulus Steel - Tangential Beam Modifications".
Design Change Notice DC1-EC-3601, Rev. O, Generic DCN for annulus structural steel and plantform modifications, including the DCN drawing index, Drawing Transmittal Forms, and DCN Drawings.
PG&E Drawings 468990 & 468991, Rev. 01A, dated February 28, 1983, " Annulus Steel Radial Frame Additions, Design Layout and Sections".
Plant Modification Follower, D1-3601-CRO, dated November 3, 1982.
Design Criteria Memorandum, C-27, Rev. O, " Containment Annulus Structure".
Design Criteria Memorandum, C-49, Rev. O, " Class I Architectural Platforms,-
Unit No. 1 Containment Structure".
Field Change Transmittals & Associated Foley Drawings, FCT 4473A through G corresponding to Foley drawings 6181-C1-13-40,41,44,46,47,43 & 42.
ANALYSIS: (based upon the examinations described above) At the time of this examination the licensee's Design Change Notice (DCN) for the containment annulus steel connections was incomplete. The DCN (DC1-EC-3601, Rev. 0) is a
" generic" DCN which consists of many individual design changes. One or more channes is depicted on sketches prepared by engineering (the Project) and transmitted to Construction by Drawing Transmittal Forms. Each transmittal is uniquely numbered and includes an updated DCN Drawing Index. The On-Site
- Engineering Group (OSEG) can also issue design changes for this DCN in the same manner, with the condition that field initiated changes are within a predetermined scope and are coordinated with the Project. Construction i reviews the changes from both the Project and the OSEG and turns them over to their contractor (H. P. Foley in this case) for construction. The change is engineered and coupleted by Foley with one or more " shop drawings". These drawings are "as-built" by Foley and checked by construction to document what
)
was constructed for that particular change. The " shop drawing (s)" is then reviewed by construction and transmitted to the Project for review and approval by a Field Change Transmittal (FCT). At the completion of all Drawing Transmittals (which comprise the DCN), the licensee's " record drawings" are updated based on the FCTs which forwarded the " shop drawings" and the DCN is closed. The Nuclear Power Operations staff and Plant Operations staff have reviewed this " generic" DCN prior to work commencing and are required to review the complete DCN after it is finished. The Foley " shop drawings" are reviewed and approved by Construction and Project personnel. In
., the event a " shop drawing" is unsatisfactory the responsible engineers or construction personnel contact Foley personnel to correct the deficiency. The DCN, DCN sketches and drawing index, FCTs, and " shop drawings" are placed in the licensee's Records Management System (RMS) as these documents are processed through the system described above.
- c. .
T
.o -
6 The inspector Log with c verified that the Foley "opies of the D designthe licensee per approve d by theshop drawings"CN RMS.
\
As e
were alsosketches.
c sonnel maintain inspectorreceiv 90% ,d1983and overof November engineers,ontroled, The inspector were3 also responsible va DCN Transmitta being the w had been erified ork andverified inspector approximately that they wthat responsible e 380 Foland placed were in being that thereviewed and reflect th observed that ere approv d by the ect Proj procedures)e subject DCN.
completion the "drawingssatisfied withengineers h to the fieldDuring interview these of the DCN.drawings w Licensee ould be of personnel record" had not onstru btheto quality e
of c sta een "as ction.Theexamine ll CONCLUS!ONS:
to the reissued "as ted was annulus The inspector fou d that (based onbuilt" to w drawingsavailable was the allegatn steelthrough built" within current thirt y days of [,
Construction controlled andthe potential us t correct Foley " ion isthat for the DCN incorporated ers throughand Engineering. hey were beingshop dra the associated DCNinto final "as-built"theThe transmittal ofthe and"a These reviewe licensee's" nformation were e shop drawings"d these drawingsRMSand system w available tov d by both __
ere within 30 days 's 1 scheduled Jdh' of completionto be .~ s of asfC3